Summary
Overview
Work History
Education
Skills
Certification
Workshopsandcourses
Timeline
Generic

Abd El Maged Said

Quantity surveyor Engineer
Riyadh,01

Summary

Certified Project Management Professional (PMP) with over 10 years of experience in infrastructure, residential construction, mall construction, special foundation, and soil mechanics. Skilled in project coordination, cost control, and contracts. Completed a professional diploma in project management from the American University in Cairo (PRMG). Proficient in facilitating FIDIC contracts and contract law, ensuring timely notifications on behalf of the company. Possess excellent interpersonal skills for confident and professional interactions with colleagues and clients. Experienced in utilizing construction software such as Revit and AutoCAD to prepare precise cost estimates.

Overview

10
10
years of professional experience
5
5
years of post-secondary education
2
2
Certifications
2
2
Languages

Work History

Project Quantity Surveyor - Contract Administrator

DAR AL RIYADH
Riyadh, Riyadh Region
03.2024 - Current
  • Project: El Forsan 2-Riyadh
  • Owner: Ministry of Housing
  • Budget: 628 Million SAR

The project consists of full infrastructure (water, Storm, Irrigation, Sewage, Electric power, Electric lighting , Telecommunication ,Roads) with total area 656800 m2

Quantity Surveyor Responsibilities:

Bill of Quantities Preparation:
Deliver relevant Bill of Quantities using Civil 3D software for land and road projects.
Project Planning Support:
Provide planning support to the project team to ensure project targets are met.
Periodic Reporting:
Prepare periodic reports detailing the status of all engineering, procurement, and construction activities.
Branch Coordination:
Coordinate between project branches, such as networks, to ensure seamless integration and collaboration.
Change Impact Analysis:
Analyze the effects of proposed changes on the project and maintain the baseline change control and authorization process.
Planning Guidelines & Reporting:
Establish planning guidelines and reporting procedures, ensuring schedules are developed and maintained in alignment with project procedures and guidelines.
Client Invoicing:
Ensure effective control of client invoicing, including submission of invoices and tracking progress

Contract Administrator Responsibilities:

  • Maintained meticulous records of all contractual documents, ensuring compliance with industry regulations and protecting against potential legal disputes.
  • Evaluated contract claims thoroughly, defending company interests effectively during negotiations and potential disputes.
  • Developed detailed project scopes, allowing for more accurate cost forecasts and better resource allocation.
  • Enhanced financial management for projects through diligent cost monitoring and budget control.
  • Conducted comprehensive risk assessments to proactively identify and mitigate potential project challenges.

Project Quantity Surveyor

Dar Al Handasah (shair and Partner)
Egypt , Cairo
07.2022 - 02.2024
  • Project: Ain Sokhna Port (Owner: GARB)
  • Budget: EGP 1.7 billion
  • Scope: Site irrigation networks, stormwater drainage, sewerage, water supply networks, roads

Responsibilities

  • Improved project efficiency by streamlining communication between team members and stakeholders.
  • Spearheaded value engineering initiatives to identify areas of potential cost reduction while maintaining project integrity.
  • Developed detailed project scopes, allowing for more accurate cost forecasts and better resource allocation.
  • Enhanced financial management for projects through diligent cost monitoring and budget control.
  • Evaluated contract claims thoroughly, defending company interests effectively during negotiations and potential disputes.
  • Championed continuous improvement initiatives within organization by regularly reviewing current processes and implementing innovative solutions where necessary for greater efficiency gains.
  • Collaborated with project teams to ensure accurate and timely quantity estimations.

Senior Quantity Surveyor

Hassan Allam Sons (HAC)
Egypt , Kafr Elsheikh
05.2021 - 07.2022
  • Project: Black Sand Factory
  • Budget: EGP 1,05 billion
  • Scope: Steel factory, infrastructure, roads, landscape

Responsibilities

  • Led team of junior quantity surveyors, providing mentorship and guidance to improve their skills and performance.
  • Evaluated subcontractor bids and negotiated contracts, securing competitive pricing while maintaining high-quality workmanship standards.
  • Conducted feasibility studies to estimate materials, time, and labor costs.
  • Optimized cash flow management by closely monitoring project finances and advising clients on expenditures throughout project lifecycle.
  • Estimated and analyzed work performed to request payment from clients.
  • Reduced overall project costs by implementing value engineering techniques during design phase revisions.
  • Enhanced contract negotiation skills, resulting in favorable terms for both clients and company.
  • Identified potential cost savings opportunities through meticulous review of project specifications and supplier quotes.

Project Quantity Surveyor

Dar Al Handasah (Shair and Partner)
Egypt , Sharm El-Sheikh
04.2020 - 05.2021
  • Project: Extension of Four Seasons Hotel (Owner: TMG, Budget: EGP 2,34 billion
  • Scope: Earthwork, concrete, finishing, MEP, infrastructure, roads, landscape

Responsibilities

  • Evaluated contract claims thoroughly, defending company interests effectively during negotiations and potential disputes.
  • Supported the development of project schedules by providing accurate input on resource requirements and timeframes, ensuring timely completion of all assigned tasks.
  • Enhanced financial management for projects through diligent cost monitoring and budget control.
  • Established effective change order procedures, minimizing disruptions to project timelines and budgets.

Quantity Surveyor

Atrium Quality Contractors
Egypt, Cairo
05.2019 - 04.2020
  • Project: City Gate Mall
  • Owner: TMG, Budget: EGP 825 Million
  • Scope: ID fit-out, MEP, landscape work

Quantity Surveyor

ASGC Egypt (Al Shafar)
Egypt, Cairo
05.2018 - 12.2019
  • Projects:ETAPA Mall
  • Scope of work Construction, finishing, landscape, MEP Budget: EGP 1,3 billion EGP
  • Uptown Cairo Compound
  • Scope of work: Concrete, ID fit-out, infrastructure, roads Budget: 799 Million EGP
  • Prepare a Take-off tender quantities as per the tender drawings & specifications and compare with the quantities given in the Consultant BOQ and advise of any major difference.
  • Advise the Inquiry Engineer & Estimator of any queries, clarifications, discrepancies to be addressed to the Consultant.
  • Prepare Monthly interim payment Certificates to be submitted by client
  • Prepare Subcontractors invoices
    issuing New Variation orders and submit Particulars with technical and Cost Impact
  • Preparation of Invoices on SAP ERP

Quantity Surveyor

Arabian Construction Company (ACC)
Egypt, Cairo
09.2017 - 04.2018
  • Project: Mivida Compound
  • (Concrete, ID Fit-Out, MEP, Landscape, Infrastructure)
  • Responsibilities
  • Prepare take-off tender quantities as per the tender drawings and specifications and compare them with the quantities provided in the Consultant’s BOQ. Highlight and advise on any major discrepancies.
  • Advise the Inquiry Engineer and Estimator regarding any queries, clarifications, or discrepancies that need to be addressed with the Consultant.
  • Perform measurements for structural and architectural works to prepare cost estimates for projects.
  • Prepare monthly interim payment certificates for submission to the client.
  • Prepare subcontractor invoices, issue new variation orders, and submit detailed particulars with technical and cost impacts.
  • Prepare invoices using the SAP ERP system.

Estimating Engineer

Egy Drill for Foundation
Egypt, Cairo
06.2016 - 09.2017
  • Cost estimation and pricing, performance monitoring, appraisal
  • Drafted requests for quotations to comply with project specifications.
  • Communicated with project management, engineering, and purchasing personnel to solicit feedback on cost and lead-time estimation.
  • Followed up with vendors to drive complete and compliant quotes for proposal or provide clear exceptions to spec.
  • Gathered data on materials, labor and equipment costs to determine total costs of projects.

Technical Office Engineer - Geotechnical

Al Waly Group (Sefi Fontec)
Egypt, Cairo
05.2015 - 06.2016

Responsibilities

  • Prepared technical and financial offers, studied contracts, and managed raw material requirements
  • Provided technical support in both on-site and telephone consultations.
  • Reported regularly to managers on project budget, progress, and technical problems.

Site Engineer

Sulaymaniyah for Contracting
Egypt,ShaLateen
11.2014 - 05.2015

Responsibilities

  • Supervised technical construction aspects and coordinated subcontractors
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.

Education

Civil Engineering

Tanta University
Egypt
06.2009 - 06.2014

Skills

undefined

Certification

Project Management Professional (PMP), 11/01/19

Workshopsandcourses

  • نظام المشتريات والمنافسات الحكومية
  • CONTRACT ADMINISTRATION FOR PROJECT MANAGERS, (AUC)
  • FIDIC Module 2 Management of Claims and Resolution Disputes, Arab center for Arbitration

Timeline

Project Quantity Surveyor - Contract Administrator

DAR AL RIYADH
03.2024 - Current

Project Quantity Surveyor

Dar Al Handasah (shair and Partner)
07.2022 - 02.2024

Senior Quantity Surveyor

Hassan Allam Sons (HAC)
05.2021 - 07.2022

Project Quantity Surveyor

Dar Al Handasah (Shair and Partner)
04.2020 - 05.2021
Project Management Professional (PMP), 11/01/19
11-2019

Quantity Surveyor

Atrium Quality Contractors
05.2019 - 04.2020

Quantity Surveyor

ASGC Egypt (Al Shafar)
05.2018 - 12.2019

Quantity Surveyor

Arabian Construction Company (ACC)
09.2017 - 04.2018

Project Management (PRMG)

05-2017

Estimating Engineer

Egy Drill for Foundation
06.2016 - 09.2017

Technical Office Engineer - Geotechnical

Al Waly Group (Sefi Fontec)
05.2015 - 06.2016

Site Engineer

Sulaymaniyah for Contracting
11.2014 - 05.2015

Civil Engineering

Tanta University
06.2009 - 06.2014
Abd El Maged Said Quantity surveyor Engineer