17 years of experience in offshore structure field , fixed platforms , started from a junior till principal position. The experience includes various types of projects such as conceptual – Feed and detailed stages , in addition supporting oil and gas field and offshore substation field.
Strong analytical and problem-solving skills, ability to meet deadlines and manage priorities, ability to establish project estimates and oversight of project budgets. Strong written and verbal communication skills in English and commitment to deliver as per the planned schedule.
Within the involvement , many offshore projects had been delivered successfully ,for medium scale projects to high scale projects, including both jacket structures , lifted topsides and float over topsides. Also construction engineering support are within my portfolio , the activities included design deck support frame for both SPMT trailers and skidded load out and Mega jacks pad design connection.
Achievements include the following :-
Borwin 3 Project , Construction Engineering Support ,Client Tennet
It was planned that the Topsides will be loaded out by SPMT after reaching weight of 12000 metric tons and then it will be temporary supported at the Dry Docks to reach a weight of 20000 metric tons. Due to schedule backlog the plan was changed to skidding load out.
The topsides are fabricated on temporary supports. After completion of the fabrication, the topsides will be jacked up using hydraulic mega jacks on the internal six jacking.
My Role is summarized as followed: -
· Foundation retrofitting for the temporary support after topside weight reached 10000.
· Full supervision at site to ensure the foundation retrofitting operation is as per the design.
· Checking the structure during temporary and final jacking condition.
· Design all the lifting and jacking aids and checking using ANSYS.
· Review the new foundation structural design used for the topside skidding.
Galloper Platform in UK
RWE has named UK-based contractors Alstom and Petrofac as the preferred suppliers for the electrical systems at its 340MW Galloper offshore wind farm in the east of England.
My responsibility in the project is as follows:
· Performing the Engineering Actives for Topsides (In-service and Preservice Analysis)
· Performing the Jacket Fatigue Analysis using both deterministic and Spectral Fatigue.
· Perform on Jacket on Bottom Stability.
· Ansys Design for Topsides Lifting Pad-eye/Jacket lifting Pad-eye using ANSYS
· Develop a standard smart programmed excel sheets
· Develop the Deterministic fatigue analysis for Jacket CANS
· Performing Non-Linear Ship Impact Analysis
· Reviewing installation / fabrication contractor documents for Jacket transportation, Jacket Load out, topsides lifting , Topsides transportation done by Heerma.
Satah al-Razboot (SARB)/ ADMA
· Completion the structural engineering for four platforms and two bridges in the project.
· Mutli -discipline Coordination ( Piping / Electrical /Mechanical )
· Structural analysis for the two platforms Riser Platform South and Riser Platform North.
· Engineering Support for the construction Problems.
· Supervise the team in Chennai to issue all the deliverables as per the schedule.
· Reply to the client comments till the approved of construction stage.
· Problem solver for the boat impact at this project and developing a new connection for riser protector.
North West- October
· Prepare project specifications
· Coordination with other disciplines
· Review the jacket structural analyses
· Performing seismic analysis using API Codes
· Performing jacket on bottom stability
· Review all the related jacket structural drawings
Development of Denis B development , Port Said Egypt
· Review vendor data received for 5 vendor data for five equipment packages and follow up with the management team with structural comments in all MRQ’S related.
· Checking all the calculations for all lifting accessories and lifting padeyes and confirming that the certifications.
Review the cable tray support and equipment fixation for Denis B Platform.
Qatar Global Assessment of Structures ( Qatar Petroleum )
· Inspection site visits and structure verifications for the existing offshore platforms in MM and BH Fields
· Prepare site visit reports and bridges structural analyses report.
GUPCO/ BP Rehabilitation Project
· Perform the engineering required for new heli-deck and extensions in Badri Helideck Support Platform at Badri complex field in Gulf of Suez (60 m water depth, Reviewed with Bomel’s office).
· Adding new extensions for evacuation Plan at J-10 complex
Structure Engineering Design
Professional Engineer ( PE ) from Kentucky state of Board 2017.
Project Management Institute (PMI), USA2020.
Professional Engineer ( PE ) from Kentucky state of Board 2017.