Almost Sixteen years of experience as an Electrical Engineer in field of design, construction, Testing and Commissioning for Medium Voltage, Low Voltage and Low Current Systems. Responsibilities and scope of work in design / redesign, design review, shop drawings preparation & construction activities are as follows mentioned in project experience summary.
Project: JABAL OMAR DEVELOPMENT PROJECT (Jumeirah East & West Towers)
Project consists of podium with eleven floors and four five stars hotels towers each with 23 floors with total build up area 198,451 m2, 30 MW demand Power, 26 MV/LV Transformers with different ratings, 3 loops MRMU, Switch gears, busway system, five Diesel Generators, UPS units, all kind of power & low current panels, Kitchen equipment’s, earthing & lightning system, Car Park system, power and low current outlets, Public Address, CCTV, Fire Alarm, Access Control, IPTV, HSIA, ….etc.
Project: JABAL OMAR DEVELOPMENT PROJECT (Jumeirah East & West Towers)
Responsible for:
Project: Public Services Centre
Project consists of 312 buildings, (governmental buildings, prisons, hospital, medical isolation, housing, Central Kitchen, Central laundry, General Toilets, helipads, security gates and fuel station) with total area of 2,000,000 m2, 67 MW Power demand load, 70 MV/LV Transformers with different ratings, 7 loops MRMU, Switch gears, 47 Diesel Generators, all kind of power & low current panels, UPS units, Kitchen equipment’s, earthing & lightning system, Car Park system, power and low current outlets, Public Address, CCTV, Fire Alarm, Access Control, nurse Calling System….etc.
Responsible for:
Project: Umm- Alqura University Campus
Project consists of 120 Villas for housing faculty members, with total area of 750,000 m2 , 12 MW Power demand load, 12 MV/LV compact Transformers with different ratings, 6 Diesel Generators, UPS units, earthing & lightning system, power and low current outlets, lighting system, Public Address, CCTV, Fire Alarm, Access Control….etc
Responsible for:
Project: Masa'a extention on the Holly Mosque
Project consists of 7 floors for seekers between Safa & Marwah with about 450 m, three floors of them for handicapped seekers, four escalators buildings each with 13 floors, four mechanical floors ( each contains about 90 AHU, child water pumps, ETS units ), 16 MW load power, 9 MV/LV Transformers with different ratings, MV switch gears, 4 Diesel Generators, UPS units, busway system, all kind of power & low current panels, earthing & lightning system, power and low current outlets, Public Address, CCTV, MATV, Fire Alarm, Access Control….etc
Responsible for: