Ability to manage team fast adaptation in new environments and high learning skills, great communication skills, decision maker and always work for the quality and performance of the job.
Overview
7
7
years of professional experience
Work History
Piping Foreman
aramco
Al khrej
02.2022 - 01.2025
Ensuring that work is performed in accordance with relevant safe working procedures.
Ensuring the usage of appropriate measuring equipment to verify dimensions of material provided against drawings, interpret components and assembly drawings, and use allocated resources and personnel to achieve set engineering (SMPP) construction projects.
Responsible for usage, service and maintenance (including conditions-based) of engineering operational maintenance primary equipment like HDPE Machines, Mobile Machines, Cranes etc.
Inspect work to maintain specified standards and quality, as well as managing the performance of subordinates
Supervise weld HDPE pipe used in line with the parameters of the HDPE machine to make implement proper procedure(s) for butt and electrofusion weld of HDPE pipe
Reporting any dangerous conditions/ incident/ accidents immediately as per the SHE system.
Using and ensuring the usage of the relevant PPE required in accordance with the SHE system
Compliance with the highest level of safety during all stages of project execution to avoid any type of incidents and or accidents.
Taking reasonable care of own health and safety and that of others in the workplace.
Piping Foreman
Yanbu
Yanbu
03.2018 - 01.2020
Ensured safe installation of various piping systems and components utilizing hourly employees and Apprentices, on-the-job training for new employees, and adherence to cost and schedule indices
Responsible for Monitoring quality, safety, and providing planning and direction
Monitored the quality, safety, and provide planning and direction directly to the assigned crew of craftsmen for construction activities
Prepared and updated master schedule derived from construction procedures, drawings, and estimates used in monitoring progress spreadsheets
Responsible for the interpretation of technical work documents such as drawings and work packages.
Responsible for the generation of work permits to allow safe work on previously sold systems or systems operated by the Navy
Directed fitters and welders on what jobs they were to do.
Installation of CS piping System
Installation of GRP piping System
Installation of HDPE piping System
Installation of UPVC piping System
Education
Secondary School Certificate -
Doulodpur High School
Chittagong, Bangladesh
01.2025
Piping Foreman -
Umluj, KSA
01.2025
Skills
Safety Awareness
Dedicated to Job
Good Communication Skills
Hard Working
Acceptance Change
Follow-up
Polite and Team work
Good Behavior with seniors and juniors
Punctuality
Quality of work
Challenging and good Performance on Jobsite
Disclaimer
I hereby certify that all the information above is true and correct to the best of my knowledge.