Summary
Overview
Work History
Education
Skills
certificate course
Languages
Timeline
Generic
ABDUL SALAM ANEEZE

ABDUL SALAM ANEEZE

Al-Zahra,Kingdom of Saudi Arabia

Summary

Highly skilled professional with extensive expertise in AutoCAD, Primavera P6, and Microsoft Office. Demonstrates comprehensive knowledge of construction legislation, earthworks, and infrastructure development. Proficient in interpreting construction drawings and ensuring material procurement efficiency. Adept at staff supervision, planning and organising tasks, and maintaining safety regulations on site. Experienced in client relationship management, building site supervision, project planning, and progress updates. Committed to quality assurance and effective equipment operation and maintenance.

Overview

17
17
years of professional experience

Work History

Site Manager

Siemens LTD
03.2024 - 04.2025
  • RMU installation
  • LV SWGR installation
  • Power transformer installation
  • Auxiliary transformer installation
  • Indoor/outdoor lighting system installation
  • Fire alarm/ firefighting system installation
  • UPS system installation
  • Auxiliary AC/ DC DB installation
  • MV, Power and control cable installation
  • Bus duct installation
  • Commissioning of E-House

Site Manager

Quality and Excellence company.
12.2021 - 04.2023
  • 115kV GIS Installation including LCC panels and GIB
  • Power transformer installation (50/67MVA), 13.8KV NGR
  • Station service transformers (13.8kV/400V)
  • 13.8kv SWGR installation
  • 13.8kv Capacitor bank installation
  • Cable Tray installation
  • Installation of Control & Protection panels, AC/DC panels, Batteries, chargers, SAS and Communication panels, DDC panels
  • Grounding System installation/ complete mesh with equipment grounding including testing
  • Shielding/lightening and indoor/ outdoor Lighting Works with lighting pole & LCLMs including laying and termination of THHN wires
  • Laying of Control & power LV cable with glanding & termination between all equipment including HVAC including cable tagging and ferruling with materials
  • Laying and termination of all AC/DC cables between all equipment including cable tagging and ferruling
  • Installation of all kind of conduits, junction boxes, indoor/ outdoor receptacles and disconnect switches
  • Laying of Fiber optic cable and its termination
  • Laying of MV cable and termination
  • Comply all site safety requirements
  • Plan, schedule and assign workers (foreman, technician and helpers) to complete the activities
  • Prepare/arrange materials and equipment’s to complete the activities
  • Forecast activities
  • Writing reports and keeping on top of prepare work
  • Answer enquiries from potential project partners
  • Mediate on-site conflict
  • Prepare, submit bi-daily and weekly reports
  • Ensure all changes to specification, work scope and drawing are documented

Site Manager

Quality and Excellence company.
11.2020 - 12.2021
  • Installation of 115kV Gas Insulated Switchgear with LCC and GIB's
  • Installation 50/67MVA Power Transformer including all accessories and station service transformer
  • Installation of 13.8 KV Indoor Metal clad switchgears
  • Installation of 108kV Surge Arrestor with surge counter
  • Installation of 115 & 13.8kV Relay, Metering panels, RTCC, ABTS, ACCS, Line Protection Panels, Common Alarm Panel, Bus Bar Protection Panel, Bus coupler protection panel and Bus section protection panel, Transformer Protection Panels, Capacitor Bank Protection Panels, UV-UF Panels, 13.8kV Revenue metering panels, Syncro Check Panels & Synch trolley
  • Installation of SAS system
  • Installation of grounding system(grounding mesh, precast grounding and equipment grounding)
  • HV, MV, LV power and control cable laying, termination and testing including hi-pot test
  • Installation of AC Distribution board, DC Distribution Board, Power Panels, Lighting Panels and DC Panel (AC-DC System)
  • Installation of Battery, Battery charger and Battery Monitoring Panel
  • Shielding/lightening and indoor/ outdoor Lighting Works with lighting pole & LCLMs including laying and termination of THHN wires
  • Comply all site safety requirements
  • Plan, schedule and assign workers (foreman, technician and helpers) to complete the activities
  • Prepare/arrange materials and equipment’s to complete the activities
  • Forecast activities
  • Writing reports and keeping on top of prepare work
  • Answer enquiries from potential project partners
  • Mediate on-site conflict
  • Prepare, submit bi-daily and weekly reports
  • Ensure all changes to specification, work scope and drawing are documented

Site Manager

Quality and Excellence company.
01.2020 - 11.2020
  • Coordinate with SEC team to allocate work permits and locations
  • Collection of new smart meter form SEC warehouse
  • Replace existing energy meter with new smart meter and commission successfully as per work permit, location and account number
  • Return back to the existing energy meter to SEC warehouse with all documents
  • Coordinating with field supervisor and update the project status
  • Supervising and overseeing the direction of project
  • Ensure safety procedure following at site
  • Plan, schedule and assign workers (foreman, technician and helpers) to complete the activities
  • Prepare/arrange materials and equipment’s to complete the activities
  • Forecast activities
  • Writing reports and keeping on top of prepare work
  • Answer enquiries from potential project partners
  • Mediate on-site conflict
  • Prepare, submit bi-daily and weekly reports
  • Ensure all changes to specification, work scope and drawing are documented

Site Manager

Siemens Ltd
07.2018 - 01.2019
  • Remove all existing 13.8kv metal clad switchgear from the plant existing substation
  • Remove all control and LV power cables from the existing switchgear
  • Shifting all existing panels and cable to SEC power plant warehouse
  • Installation of new 13.8KV SIEMENS NX air switchgears
  • Installation of new MV bus duct for interconnection of the switchgear
  • Installation of new DCP panels for controls and communication
  • LV power and control, communication cable laying and termination
  • Testing and commissioning of new switchgears including bus duct and DCP panels
  • Training of SIEMENS NX AIR switchgear operation and maintenance
  • Prepare, submit bi-daily and weekly reports
  • Comply all plant safety requirements
  • Ensure all changes to specification, work scope and drawing are documented
  • Submit all as-built documents to SEC power plant

Site Manager

Siemens Ltd
08.2017 - 07.2018
  • Oversee daily operation
  • Installation 50/67MVA Power Transformer including all accessories, NGR and station service transformer
  • Installation of 33 KV 8DA10 SF6 switchgears
  • Installation of 13.8 KV NXPLUS C switchgears
  • Installation of 33 & 13.8kV Relay, Metering panels, RTCC, ABTS, Line Protection Panels, Common Alarm Panel, Bus Bar Protection Panel, Bus coupler protection panel and Bus section protection panel, Transformer Protection Panels, UV-UF Panels, 13.8kV Revenue metering panels
  • Installation of complete SAS system including monitors
  • Installation of grounding mesh and equipment grounding system
  • MV, LV power and control, communication cable laying, termination and testing
  • Installation of AC Distribution board-DC Distribution Board, Power Panels, Lighting Panels and DC Panel (AC-DC System)
  • Installation of Battery, Battery charger and Battery Monitoring Panel
  • Shielding/lightening and indoor/ outdoor Lighting Works with lighting pole including laying and termination of THHN wires
  • Installation of HVAC systems
  • Installation of fire alarm and firefighting systems
  • Coordination of testing and commissioning of the systems
  • Installation of all communication systems including fiber optic cables
  • Comply all safety requirement as per SEC five star
  • Plan, schedule and assign workers (foreman, technician and helpers) to complete the activities
  • Prepare/arrange materials and equipment’s to complete the activities
  • Forecast activities
  • Writing reports and keeping on top of prepare work
  • Answer enquiries from potential project partners
  • Mediate on-site conflict
  • Prepare, submit bi-daily and weekly reports
  • Ensure all changes to specification, work scope and drawing are documented

Electrical Supervisor

Siemens Ltd
10.2016 - 07.2017
  • Installation of Drive Panels
  • Installation of 7MVA transformer
  • Power cable and control cable Laying and termination in transformer side, Drive side and Motor side
  • Motor Installation monitoring
  • Civil Works monitoring

Electrical Supervisor

Siemens Ltd
03.2016 - 08.2016
  • Installation of Drives and communication panels
  • Power cable, control cable and communication cables laying and termination in Drives panel side and Motor side and communication panels
  • Trouble shooting in power, drives and communication side also

Electrical Supervisor

Siemens Ltd
04.2015 - 02.2016
  • Project Coordination and documentation
  • Civil Work Monitoring
  • 34.5kv SF6 Switchgear Installation
  • 34.5kv Bus Duct Installation
  • 13.8kv SF6 Switchgear installation
  • 7.MV Cable laying and termination
  • HV Cable Laying
  • Control and communication cable laying and termination

Electrical Supervisor

Siemens Ltd
09.2013 - 12.2014
  • Installation of MV and LV Switchgears
  • Installation 25MVa and Lighting transformers
  • Bus Ducts Installation and MV & LV cable laying
  • Lighting panels and power factor panel’s installation
  • Civil Works monitoring

Electrical Supervisor

Siemens LTD
09.2012 - 08.2013
  • Installation of MV switchgears, relay and control panels
  • Erection of capacitor bank and reactors with structural
  • MV and control cable laying and termination

Electrical Supervisor

Siemens Ltd
04.2012 - 08.2012
  • LV Switchgear installation
  • Bus duct installation
  • Lighting Transformer installation
  • Coordination of testing and commissioning and documentation

Document controller and Coordinator

Siemens Ltd
01.2010 - 02.2012
  • Coordinate all activities related to the Document materials
  • Control procedure, including technical documents, drawings, and commercial correspondence
  • Input document data into the standard registers ensuring that the information is accurate and up to date
  • Generate the various document control reports as required
  • Typing of site documents, and follow up of all the site needs
  • Makes sure that controlled copies of latest approved documents and drawings are given to the appropriate staff, subcontractors and suppliers as applicable
  • Maintain updated records of all approved documents and drawings and their distribution clearly
  • Maintain the documents and drawings in the Document Control office under safe custody without any damage or deterioration with easy traceability
  • Maintain the files and control logs as required by the project

Document Controller

Siemens Ltd
06.2008 - 10.2009
  • Listing out the Documents and documenting the project details
  • Explaining the Project Plan to internal execution team
  • Describing all possible document flow structure in the tbits application
  • Submission of documents and creating Transmittal through Robotic Document Control
  • Describing and creating the Acknowledge letters for the clients through Robotic Document Control
  • Tracking the pending documents through weekly progress reports
  • Export of As-Built files in the customer required format
  • Sign-off from the customers with clear specifications of retention of Archives

Education

Diploma - Electronic and communication Engineering

Technical Board of Karnataka

Bachelor of Science - Computer science

Kerala university
India

Pre-degree - science group

Kerala university
Thiruvananthapuram
08.1993 -

Skills

  • AutoCAD
  • Primavera P6
  • Microsoft office
  • Construction legislation knowledge
  • Primavera expertise
  • Earthworks experience
  • Infrastructure development knowledge
  • Construction drawings interpretation
  • Proficient in cad software
  • Material procurement efficiency
  • Staff supervision capability
  • Planning and organising tasks
  • Safety regulations knowledge
  • Construction equipment
  • Client Relationship Management
  • Building site supervision
  • Project planning and progress updates
  • Equipment operation
  • Equipment Maintenance
  • Quality Assurance

certificate course

  • IOSH Managing Safely
  • Fire management
  • Incident Investigation
  • Risk Assessment
  • First Aid

Languages

English
Fluent
Hindi
Advanced
Malayalam
Native

Timeline

Site Manager

Siemens LTD
03.2024 - 04.2025

Site Manager

Quality and Excellence company.
12.2021 - 04.2023

Site Manager

Quality and Excellence company.
11.2020 - 12.2021

Site Manager

Quality and Excellence company.
01.2020 - 11.2020

Site Manager

Siemens Ltd
07.2018 - 01.2019

Site Manager

Siemens Ltd
08.2017 - 07.2018

Electrical Supervisor

Siemens Ltd
10.2016 - 07.2017

Electrical Supervisor

Siemens Ltd
03.2016 - 08.2016

Electrical Supervisor

Siemens Ltd
04.2015 - 02.2016

Electrical Supervisor

Siemens Ltd
09.2013 - 12.2014

Electrical Supervisor

Siemens LTD
09.2012 - 08.2013

Electrical Supervisor

Siemens Ltd
04.2012 - 08.2012

Document controller and Coordinator

Siemens Ltd
01.2010 - 02.2012

Document Controller

Siemens Ltd
06.2008 - 10.2009

Pre-degree - science group

Kerala university
08.1993 -

Diploma - Electronic and communication Engineering

Technical Board of Karnataka

Bachelor of Science - Computer science

Kerala university
ABDUL SALAM ANEEZE