Highly motivated and disciplined professional with exceptional multi-tasking skills. Energetic and efficient, consistently demonstrating responsibility and punctuality in all tasks. Committed to leveraging these strengths to achieve career goals and contribute effectively to team success.
Experienced project manager with focus on delivering complex projects within scope, time, and budget. Proven capability to lead cross-functional teams, streamline processes, and drive project success through strong communication and problem-solving skills. Adept at managing stakeholder expectations and mitigating risks to ensure project alignment with business objectives.
Will be furnished on demand
1. RTR cross-country 26” pipeline laminated joint 110 km, location Juffran,
2. RTR cross-country threaded joints 105 km, Gulf Excellent Aramco 2023,
3. Right of way - around 200km in the desert with 80 Construction equipment at peak, Gulf Excellent Aramco 2023,
5. Advanced petrochemicals plant Jubail-2 Civil works (Client Alrushaid/Samsung) Al Rushied APCO 2022.
6. Mechanical works Desalination plant Al khober (Client Acciona/SWCC) Acciona SWCC 2022,
7. ROW works 22m wide, 100km from Rastanura - pipeline projects (Client: Sinopec/Aramco) Sinopec Aramco 2022,
8. Anchor foundations & Well heads Civil works at Haradh gas pipelines (CPP/Aramco) CPP Aramco 2022,
9. Fabrication of 2- LPPT/ 2-HPPT/ Vessels for Aramco 7 meter Dia Degassing vessel for Aramco Juaymah plant GSCC Aramco 2021,
10. 35 Meter long stainless-steel Column Fabrication and replacement at Yanbu refinery GSW Aramco 2018,
11. 22 Heat Exchangers fabrication and replacement at SADAF GSW Sharq 2018,
12. Tank’s fabrication and erection at Riyadh power plant Vessel, (60 Meter Dia)- P13 GSW SEC 2016,
13. Pipeline automatic welding (56 km -48” CS cross-country pipeline project at Jizan Refinery with automatic welding) - GSW Hanwah Aramco 2016,
14. 80 no. chemical injection skids manufacturing GSW Aramco 2016,
15. 9 Meter Dia cladded spooling fabrication (Transfer line) for Jizan Refinery, GSW Hanwah/Aramco 2017,
16. Sadara off-plot pipelines - 17 Off plot pipelines cumulative length 285 Km running through the corridors to different third parties and port, including multidiscipline work. This is a basically group of 7 projects (SADARA & Sabic 6 plants +Port tank Farm) Total MHRs: 4 Million - AYTB Sadara 2013-2015