Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Abdullah Saeed Almrri

Abdullah Saeed Almrri

Madina

Summary

An Mechanical Maintenance Engineer with a Bachelor Degree In Mechanical Engineering Technology. I have 2+ experience in Maintenance , Utilities , and Facilities field . Excellent background in Reporting, Identifie issues, analyzed information and provided solutions to problems , calculation of equipment operating efficiency per month with expertise in asset management , and maintain it . As well as familiarity with Maximo ,SAP, Microsoft Office, and MS Project.

Overview

2
2
years of professional experience
3
3
Certifications
1
1
Language

Work History

Mechanical Maintenance Engineer

King Faisal Specialist Hospital and Research Centre
03.2021 - Current
  • Planned Preventive Maintenance for Chillers Units : 1
  • Check the condenser coils if found any debris remove and clean the coils with appropriate chemical Coil cleaner
  • 2
  • Check the moisture indicating sight glass and charge freon if needed 3
  • Check all refrigerant joints and repair if any leakage of freon 4
  • Check oil sensor , cooler sensor , compressor motor temperature sensor operation 5
  • Check the water flow switch operation and clean the steam strips 6
  • Check suction and discharge pressure of Rerigerants with gas manifold guage and compare with readings on display module so that proper operational confirmation of each pressure tranducer 7
  • Check and locate position of the atmospheric temperature sensor away from heating components
  • Inorder to get accurate atmospheric temperature
  • 8
  • Check all setpoint paremeters in display module and compare with actual If applicable 9
  • Check the cooler heater operation , voltage , ampare, and tighen the jack connections 10
  • Check the pressure gauges in chilled water inlet and outlet
  • If malfunctioned or damage replace
  • Planned Preventive Maintenance for Boilers Units : 1
  • Inspect burner 2
  • Inspect for flue gas leak 3
  • Inspect for hot spots 4
  • Check cams 5
  • Check for tight closing of fuel valve 6
  • Check fuel and air linkage 7
  • Submission the Service report for each visit 8
  • Check indicating lights and alarms
  • 9
  • Check operating and limit controls
  • 10
  • Check safety and interlock controls
  • Planned Preventive Maintenance for 3 Boilers Feed Pumps , 3 Diesel Pumps , 8 Secondary Pumps , 5
  • Primary Pumps, 6 Domestic Pumps , 6 Treated Pumps , and 4 Housing Pumps : 1
  • Carry out visual check of unit to ensure it is functioning correctly
  • 2
  • Inspect unit for undue noise , vibration and corrosion
  • 3
  • Check for water leaks
  • 4
  • Clean pumps externally with an air blower / cloth
  • 5
  • Check for any leakage in oil and gas system repaired as required and top upon completion of remedial works
  • 6
  • Check and record suction and discharge pressure
  • 7
  • Record Suction Chilled Water Pressure
  • 8
  • Record Discharge Chilled Water Pressure
  • Planned Preventive Maintenance for Generators Units : 1
  • To inspect the machines and check for any leaks and calibrate them
  • 2
  • To test the operation of the oil heaters and check the operation of the lubrication circuit and ensure that there is no leakage in it
  • 3
  • To check the water cooling circuit and making sure that there is no leakage in it
  • 4
  • To inspect the fuel circuit and making sure that there is no leakage in it
  • 5
  • To test the work of the distribution boards and ensure that they work normally
  • 6
  • To inspecting the movement belts , couplings , chairs and rotating parts and ensuring that they are in good condition
  • 7
  • To test the battery charger to ensure that it is working properly and normally
  • 8
  • To check the water level in the batteries and the concentration of the solution To perform machine vibration test
  • 9
  • To perform machine vibration test
  • 10
  • To ensure that the impurities are darined from the outside air tanks
  • 11
  • To operate the generator on load , recording , inspection and comparing the generator readings 12
  • (pressure and cylinder temperature )
  • 13
  • To test the work of all pumps and ensure their suitability to operate normally 14
  • To inspect the exhaust circuit and making sure that there are no leaks in it or in the flexible joints
  • 15
  • To inspect the ventilation ducts of the machine and making sure that they are clean
  • 16
  • To check the external oil coolers and making sure that all cooling fans are working in good condition
  • 17
  • To test all protection and alarm devices in the electrical circuit and ensure their safety and suitability for work
  • 18
  • To inspect the distribution cables as well as all their connections and ensuring their safety
  • 19
  • Inspecting the distribution boards as well as all their connections and ensuring their safety
  • 20
  • It is necessary to conduct calibration work for the entire system
  • 21
  • To operate the generator on load for four hours , taking into account that the disconnection and connection are done automatically
  • 22
  • To inspect the axle chairs pulleys and water pumps
  • 23
  • To check the water filters and cleaning the water cooling circuit completely clean
  • 24
  • To inspect the air filters and cleaning the air circuit
  • 25
  • To inspect of all connections and coils of basic generators
  • 26
  • To measure the resistance of the generator windings and ensure that they comply with the manufacturer's instructions
  • 27
  • To test and calibrate all measuring devices in the distribution panels according to the manufacturer's instructions
  • 28
  • To inspect the main fuel tank and ensure its safety and validity
  • 29
  • To check the generator protections against overspending
  • 30
  • To check the generator protections against the high temperature of the cooling water
  • 31
  • Inspect and test the voltage regulator , calibrate the gauges , check the cable end connections and generator main contactors , and remove any carbon buildup
  • 32
  • Inspect the fuel pumps , turbocharger , speed governor and adjust when needed .

Education

Bachelor’s degree - Mechanical Engineering

Jeddah College Of Technology

Skills

1 Leadership & Team Buildingundefined

Certification

OSHA Academy Safety and Health Training

Timeline

Mechanical Maintenance Engineer

King Faisal Specialist Hospital and Research Centre
03.2021 - Current

Bachelor’s degree - Mechanical Engineering

Jeddah College Of Technology
Abdullah Saeed Almrri