Summary
Overview
Work History
Education
Skills
Civil Site Engineer
Languages
Timeline
Generic

ABDUL RASHEED KHAN

Tabuk,Saudi Arabia

Summary

Experienced in construction execution with a strong focus on power projects, substations, Overhead transmission lines, Building construction projects and solar PV installations. Demonstrates expertise in AutoCAD and BIM (Revit) for efficient project design and execution. Skilled in cost management, procurement, and subcontractor management to ensure project success. Adept at leading teams and coordinating complex operations, with a proven track record in communication and method statements. Career goals include advancing sustainable energy solutions through innovative construction practices.

Overview

16
16
years of professional experience

Work History

Senior Engineer Civil

Larsen & Toubro Saudi Arabia LLC
Tabuk, Saudi Arabia
09.2023 - 03.2025
  • Company Overview: 2.97GW PV Solar Project, NEOM GREEN HYDROGEN PROJECT
  • Camp Construction designed by Gulf Consult
  • Internal Roads
  • MVPS (Skid/ICR) Foundations
  • Sub-Contractors and supervisors team lead
  • SCADA (Main Control Building)

Role:

  • Reconciliation of materials received at assigned areas of work
  • Implemented safety protocols, enhancing workplace conditions.
  • Coordinated subcontractor activities, ensuring alignment with overall project goals.
  • Undertook risk assessments for potential hazards onsite.
  • Supervised construction crews to maintain quality control on site.
  • Interpreted blueprints accurately to deliver high-quality construction output.
  • Led team of skilled workers for efficient project completion.

Civil Supervisor

Pakitex boards (Pvt) Ltd
Karachi, Pakistan
06.2016 - 08.2023
  • Company Overview: Industrial Group Civil Work Department.
  • 7.0 MW green field PV Solar Project
  • 1.59MW brown field PV Solar Project (Installation with brackets on roof
  • Substation Project for Gas fired Plant
  • Pre-Engineered buildings delivered by Kirby Building systems
  • R.CC Buildings for industrial units from excavation to commissioning

Role:

  • Trackers installation and inspection as per checklist
  • Handled client concerns promptly and professionally, leading to increased satisfaction rates.
  • Inspection of ramming posts with laser beam
  • Utilized CAD software to review and understand project blueprints better.
  • Coordinated subcontractor activities for smooth operations on site.
  • Fostered positive relationships with clients through transparent progress updates.
  • Improved communication on site with the introduction of daily briefings.
  • Maintained high standards of workmanship through rigorous quality control checks.
  • Performed routine inspections of solar installations to ensure safe operation.

Site Engineer

Technology Windows Enterprises (pvt) Ltd.
Rawalpindi, Pakistan
05.2014 - 05.2016
  • PHYSICAL PROTECTION EXTERIOR LABS
  • Fencing of the Project & installation of different fences samples (Welded mesh, galvanized chain link, PVC coated chain link)
  • Control building construction (R.C.C G+2)

Role:

  • Organised regular meetings for clear communication of expectations and progress updates.
  • Scheduled daily tasks to streamline workflow.
  • Liaised regularly with clients to provide status updates and gather feedback.
  • Conducted regular inspections, ensuring adherence to quality standards.
  • Conducted site quality inspections to guarantee work was in conformance of with project specifications.
  • Maintained site compliance by verifying constant conformance with health and safety regulations, risk assessments and audits.

QC Inspector

SAPAC Saudi Pan Kingdom Company
Tabuk, KSA
05.2013 - 04.2014
  • 1.65KM Bridge
  • Pre-cast Factory

Role:

  • Piling Inspection & WIRs to client for Approvals
  • Pre-cast Members inspections and specimen testing
  • MIRs for all received materials
  • QC Documentation and record keeping
  • Pre-Stressed members inspections and Testing
  • Ensured product quality by conducting thorough inspections on assembly line.
  • Complied with ISO standards whilst performing all QC inspections.
  • Improved efficiency with meticulous documentation of inspection results.

Site Engineer

Banu Mukhtar Contracting
Karachi, Pakistan
04.2012 - 03.2013
  • SUPPARCO Facility (Space & Upper atmosphere research commission)
  • Main Building R.C.C building G+3
  • Transmission Substation 765/500/220/132kV
  • Overhead Transmission line 132kv 168KM (JV with AW Engineering)

Role:

  • Contributed technical expertise at team meetings, fostering understanding and knowledge sharing among staff members.
  • Adhered strictly to industry standards throughout all installation processes.
  • Trained personnel in the use of specialist equipment, reducing incident rates.
  • Coordinated installation teams, enhancing project completion rates.
  • Conducted site surveys for accurate project planning and execution.
  • Promoted safe working culture within teams, lowering workplace accidents.
  • Supervised day-to-day site activities and task completion to meet project requirements and deadlines.
  • Managed contractors and inspected work quality to meet project goals.

QC Inspector

IZHAR CONSTRUCTION PVT LTD
Jauharabad, Pakistan
03.2011 - 03.2012
  • 50MW Nuclear Power Plant
  • Main Building (Biological shield block, calandria & Vessel chambers)
  • Substation building 220/66KV
  • Overhead and Underground tanks
  • 120 meters high chimney with slip farming method
  • OHTL (Piling for transmission line 21CKM)

Role:

  • Assisted in calibration of lab equipment for optimal performance.
  • Executed routine sampling of products; maintained high standards of output quality.
  • Performed administrative duties, facilitating smooth operation within the QC department.
  • Assisted senior staff in analysis of data, ensuring informed decision-making processes.
  • Facilitated day-to-day quality inspections and maintained related documentation.

Civil Supervisor

Banu Mukhtar Contracting
Karachi, Pakistan
06.2008 - 03.2011
  • Maritime Technological Complex
  • Marine structures (Jetties and Bolards)
  • Substation 66kv/11kv
  • Fencing 13.25Km (Heavy duty Chain-link Fence)
  • Piling for Transmission Line 7.0 CKM

Role:

  • Supervised ongoing construction works, verifying against specifications.
  • Kept site areas clear of obstructions to limit risk.
  • Organised material supplies to facilitate smooth construction works.
  • Updated work progress records for continued project monitoring.
  • Maintained site health and safety compliance for safe, secure working environments.
  • Maintained accurate records of inventory to avoid delays in production.

Education

Diploma Of Associate Engineer - (Civil Engineering)

KRL Institute Of Technology, Kahuta
Pakistan
08.2005 - 07.2008

Skills

  • AutoCAD
  • BIM (Revit)
  • MS Office
  • Communication
  • Method Statements
  • Team leading
  • Coordination
  • Cost Management
  • Construction Management
  • Procurement for Project
  • Subcontractor Management
  • Power projects
  • Substations
  • Fencing
  • Solar PV
  • OHTL

Civil Site Engineer

16 Years Experience

Languages

English
Arabic
Urdu

Timeline

Senior Engineer Civil

Larsen & Toubro Saudi Arabia LLC
09.2023 - 03.2025

Civil Supervisor

Pakitex boards (Pvt) Ltd
06.2016 - 08.2023

Site Engineer

Technology Windows Enterprises (pvt) Ltd.
05.2014 - 05.2016

QC Inspector

SAPAC Saudi Pan Kingdom Company
05.2013 - 04.2014

Site Engineer

Banu Mukhtar Contracting
04.2012 - 03.2013

QC Inspector

IZHAR CONSTRUCTION PVT LTD
03.2011 - 03.2012

Civil Supervisor

Banu Mukhtar Contracting
06.2008 - 03.2011

Diploma Of Associate Engineer - (Civil Engineering)

KRL Institute Of Technology, Kahuta
08.2005 - 07.2008
ABDUL RASHEED KHAN