Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Software
Timeline
Generic
Abdur Rahman

Abdur Rahman

Electrical Engineer, Inspector
Lahore

Summary

To join dynamic and growth-oriented organization dedicated to excellence in engineering, construction and technical fields where I can exert my efforts towards the achievement of organizational goals. CAREER SUMMARY: A hardworking, creative and dedicated engineering and technical professional have more than 16 years of experience included 12 years in Saudi Arabia & Qatar with various multinational organizations. I have served as Electrical Engineer, E & I Superintendent, Site manager in a Construction field and also having the great experience in Construction Consultancy as an Engineer & QC.

Overview

17
17
years of professional experience
5
5
years of post-secondary education
6
6
Certifications
1
1
Language

Work History

Electrical Engineer

KING’s College Hospital Project
Jeddah
2022.04 - Current
  • My responsibilities include;
  • Ensuring All Electrical Construction Activities, Testing, Pre-com, QC acceptance & Turnover
  • Nursing Calling System Installation
  • Structured cabling System
  • LV, MV cabling
  • Lightning and grounding system
  • Lighting, Design & Installation
  • Shop drawings reviewing & As-Builts
  • CCTV Installation and configuration with vendor
  • HVAC System Installation and controller fixing
  • Firefighting System Installation
  • Transformer Installation
  • Switchgear Installation with stand-by Power
  • Emergency Generator’s and UPS system installation
  • Keep records for equipment showing type, model number, date of installation, and extent of service
  • MDB’s, SMDB’s, motors, transformer, lighting fixtures or other equipment into position and completes circuits, according to diagram specifications
  • Fire alarm devices installation
  • Cable tray, cable trunking, ladder tray installtion
  • Fastens fixtures, switches and outlet boxes in positions
  • Runs wire through conduit and makes connections to complete circuits
  • Inspections and track records of all MRI
  • Material Approvals as per Project specifications
  • As-built and hand over packages review and submissions

Consultant Electrical Engineer

TRACTEBEL Engie / SWCC Desalination Projects, Arabia
Makkah Regin
2019.10 - 2022.03
  • Ensuring All Electrical Construction Activities, Testing, Pre-com, QC acceptance & Turnover of below mention systems
  • Provide leadership to the General Contractor in the construction of the project through technical expertise and diplomatic persuasion
  • Witness contractor’s quality control inspections to ensure that the permanent works are constructed according to the applicable codes, standards, and approved drawings and specifications
  • Witnesses all testing, pre-commissioning, commissioning, and start-up activities to assure contractors’ compliance with the approved plans and procedures
  • Reviews tests results generated by the independent test agencies and approves those complying with the specification requirements
  • Identifies and makes recommendation to electrical design issues during construction
  • Identifies and reports on discrepancies in original design or in contract documents which necessitate contract modifications
  • Reviews contractor’s electrical shop and as-built drawings of below systems
  • HV & MV systems including HV GIS, Power transformers, service transformers and MV switchgears
  • HV, MV and low voltage Cables
  • Protection and control systems
  • LV system including AC & DC utilities
  • Cathodic protection for tanks and pipe lines
  • VSD for high power rated motors
  • MV & LV Motors
  • Capacitor banks for power compensation
  • Lighting and small power for different buildings
  • UPS system for the essential loads
  • Emergency generator system
  • HVAC systems
  • Earthing and lightning system.

Electrical Engineer & Admin

Wilcare Hospital & Lab
Lahore
2019.01 - 2019.09
  • My responsibilities include;
  • Ensuring All Electrical Construction Activities, Testing, Pre-com, QC acceptance & Turnover
  • Nursing Calling System Installation
  • Lighting Design & Installation
  • Recreation Hall Design and Installation of Equipment
  • CCTV Installation and configuration with vendor
  • HVAC System Installation and controller fixing
  • Fixing of All testing Equipment with Vendors (X Ray Machines, PCR Machines, Blood Bank Storage etc.)
  • Firefighting System Installation
  • Mattel detector Walk through Gate Installation
  • Transformer Installation
  • Switchgear Installation with stand-by Power
  • Solar System Installation with Vendor and synchronization with UPS system
  • Keep records for equipment showing type, model number, date of installation, and extent of service
  • Motors, transformer, lighting fixtures or other equipment into position and completes circuits, according to diagram specifications
  • Cuts and shapes conduit with hand tools and fastens it in place with brackets
  • Fastens fixtures, switches and outlet boxes in positions
  • Runs wire through conduit and makes connections to complete circuits
  • Inspections and track records of all MRI
  • Material Approvals as per Project specifications
  • As-builts and hand over packages review and submissions

Lead Engineer Electrical

First Sendan Contracting Co. W.L.L
Doha
2017.03 - 2018.12
  • Working in Qatar Rail Metro Project (Red Line) as Lead Engineer (DEPOT Yard & AG Stations)
  • My responsibilities include;
  • Ensuring All Electrical Construction Activities, Testing, Pre-com, QC acceptance & Turnover
  • Pro-actively manages the Construction/Installation activities with subsystems (Building Works, Track Works, DC Positive/Negative Jumpers, Power Supply), and the external interfaces with MHI Partner, third parties and Customer
  • Accelerate synergies between subsystems
  • Drive and Support Subsystems teams to deliver as per Project Planning
  • Manage Subcontractors and ensure the completion of the works as per the agreed planning
  • Coordinate with Sourcing, procurement and Supply chain to get Material and Services on time
  • For the Installation Schedule
  • Work closely with planning to implement the construction activities as per the Project Planning
  • Track Material Deliveries and ensure Method Statement are in place to Install the specified
  • Systems
  • Prepares and monitors the execution of installation activities, reports the progress and
  • Permanently focuses on the construction delivery
  • Represent First Sendan Construction teams during Construction meeting with MHI
  • Ensure the Handover of the installation to T&C teams as per the needed requirements
  • Manpower hiring and off hiring as per project plan and requirements
  • Ensures the EHS respect (Zero deviation), report and anticipate issues.

Site Manager

SIPCHEM IPC
2016.11 - 2017.02
  • My responsibilities include;
  • Ensuring All E&I Construction Activities, Testing, Pre-com, QC acceptances
  • Site In charge

Site Manager

SADARA PO
2014.03 - 2016.11

Sendan International Company
Jubail
2013.08 - 2014.03
  • Worked in SAMAPCO PORT FACILITY Project (SAMAPCO) as Site In-Charge
  • My responsibilities include;
  • Ensuring that work in being carried out as per specification & approved drawing
  • Co-ordination with client for the quality matter including Construction changes
  • Responsible for checking, verifying and Review the Construction drawings
  • Installation of switchgears 34.5KV, 4.16KV, 480V & MCC
  • Installation of Power Transformer 5MVA, 34.5kv/4.16kv
  • Installation of Power Transformer 2000KVA, 4.16kv/0.48kv
  • Installation of UPS panel with Battery Back-up panel
  • Installation of Control room and marshaling cabinets
  • Installation of all field Instrumentation and cable pulling, termination and loop checking
  • Prepare work progress reports on daily and weekly basis
  • Prepare work progress invoice on monthly basis and submit to Client
  • Supervise coordinate and schedule the activities of related apprentices, helpers and labors
  • Preparation one day, two weeks look ahead schedule
  • Trouble shooting and maintenance of installed electrical equipment and apparatus
  • Resolve work problems and recommend work measures to improve productivity
  • Take a work order from client
  • Established field inspection & Testing Procedures for E & I works
  • Estimation and Engineering of Electrical& Instrument Scope of work
  • E&I Site In charge

Sendan International Company
Jubail
2012.02 - 2013.09
  • Worked in Sadara Tank Farm Project (TSF), Dow Project as an E & I Site In-Charge.

Electrical Superintendent

Sendan International Company
Jubail
2010.03 - 2013.07
  • Worked in Tasnee tie-in Project (SAMCO AA) as an E & I Site In-Charge
  • My responsibilities include;
  • Ensuring that work in being carried out as per specification & approved drawing
  • Co-ordination with client for the quality matter including Construction changes
  • Responsible for checking, verifying and Review the Construction drawings
  • Prepare work progress reports on daily and weekly basis
  • Supervise coordinate and schedule the activities of related apprentices, helpers and labors
  • Preparation one day, two weeks look ahead schedule
  • Trouble shooting and maintenance of installed electrical equipment and apparatus
  • Resolve work problems and recommend work measures to improve productivity
  • Take a work order from client
  • Established field inspection & Testing Procedures for E & I works
  • Estimation and Engineering of Electrical Scope of work
  • E&I Site In charge

SPEC,IMI Engineering & Construction
2006.03 - 2010.01
  • At below projects…
  • Chachar Gas Field, Kashmor, Sindh &
  • DEWAN Salsabi Gas Field Project, DEWAN Petroleum, near Dhodak Plant Tunsah Sheriff
  • And
  • HASEEB Gas Field Project, HICORBEX Petroleum, near Shakar Pur, Sindh

Education

Associate of Science - Electronics Technology

Punjab Board Of Technical Education Lahore
Lahore, Pakistan
2003.03 - 2006.03

High School Diploma -

GTTI
Lahore
2005.02 - 2007.02

High School Diploma -

Pakistan Industrial Technical Assistance Centre
Lahore
2010.02 - 2010.03

QMS Lead Auditor Course - ISO 9001:2015 QMS Auditor/Lead Auditor Training Co

SGS Academy
Lahore, Pakistan
2001.04 -

Skills

Ability to understand and adopt organization’s culture.undefined

Accomplishments


  • Certificates of Attendance: Almana General Hospitals,Al Khobar,KSA,Course of Basic First Aid,Heart Saver CPR & AED
  • Electrical Wire and Cable, Fast Cable Pakistan,Discuss basic types of wires and cables,Discuss about the capacity, load and usage of the different type of wires and cables,Production of wires and cables,Importance of wires and cables in our technology
  • General Awareness of ISO 9001:2008(March 2010)
  • SADARA Training Program,All basics Life critical trainings attended successfully

Certification

6 Months certificate in Course of Computer Application March, 2006

Software

Aconex

Timeline

Electrical Engineer

KING’s College Hospital Project
2022.04 - Current

Consultant Electrical Engineer

TRACTEBEL Engie / SWCC Desalination Projects, Arabia
2019.10 - 2022.03

Electrical Engineer & Admin

Wilcare Hospital & Lab
2019.01 - 2019.09

Lead Engineer Electrical

First Sendan Contracting Co. W.L.L
2017.03 - 2018.12

Site Manager

SIPCHEM IPC
2016.11 - 2017.02

Site Manager

SADARA PO
2014.03 - 2016.11

Sendan International Company
2013.08 - 2014.03

Sendan International Company
2012.02 - 2013.09

Electrical Superintendent

Sendan International Company
2010.03 - 2013.07

High School Diploma -

Pakistan Industrial Technical Assistance Centre
2010.02 - 2010.03

SPEC,IMI Engineering & Construction
2006.03 - 2010.01

High School Diploma -

GTTI
2005.02 - 2007.02

Associate of Science - Electronics Technology

Punjab Board Of Technical Education Lahore
2003.03 - 2006.03

QMS Lead Auditor Course - ISO 9001:2015 QMS Auditor/Lead Auditor Training Co

SGS Academy
2001.04 -
6 Months certificate in Course of Computer Application March, 2006
1 Months certificate in AutoCAD Electrical March, 2010
ISO 9001:2015 QMS Lead Auditor Course / SGS March, 2017

Cost of Poor Quality Reduction Program

5S Implementation Program

Lock Out / Tag Out - Life Critical Training

Abdur RahmanElectrical Engineer, Inspector