Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
RESPONSIBILITIES DURING PROJECT
Generic
ABID HUSSAIN

ABID HUSSAIN

Makkah

Summary

Dynamic construction professional with nearly 13 years of comprehensive experience in managing and executing diverse projects, including maintenance, fabrication, and engineering initiatives across oil refineries, gas plants, cement plants, and storage tanks. Proven expertise in project management, safety compliance, and quality control ensures successful delivery of high-stakes projects. Strong communication and collaboration skills foster teamwork and drive project success. In-depth knowledge of construction processes and resource allocation strategies enhances operational efficiency and project outcomes.

Overview

14
14
years of professional experience
1
1
Certification

Work History

Site Engineer

Metscco Heavy Steel Industries Co. Ltd.
10.2023 - Current
  • Projects:
  • Crude Oil Storage Tank Dia 106 mtr x 20 mtr Height. Client Aramco Waseea Riyadh.
  • Sour Water Storage Tanks Dia 15 mtr x 18 mtr Height. Client Aramco Berri Gas Plant Jubail
  • Water Storage Tanks Dia 106 mtr x 20 mtr Height. Client WTCCO Jeddah
  • Water Storage Tanks Dia 106 mtr x 20 mtr Height. Client WTCCO Makkah

Project Engineer

Ravi Green Engineering (Pvt.) Ltd.
04.2022 - 08.2023
  • Project: Parco PS-1 Korangi Karachi (Tank Refurbishment Project)
  • Major scope:
  • Bottom replacement of crude oil tank.
  • Sandblasting and painting of bottom underside.
  • Removal of contaminated sand and backfilling of new sand.
  • Roles & Responsibilities:
  • Being a Project Engineer Mechanical at Ravi Green, I was responsible for project execution, procurement, fabrication, execution at site. Moreover, setting the targets and monitoring and controlling against planned were also my core expertise.
  • Project: Total Parco Oil Storage Depot (Shutdown)
  • Major scope:
  • Modification and fabrication of MO Gas Pipe line.
  • MO Gas tank sand blasting and painting.
  • MO Gas tank cleaning repairing and painting

Planning Engineer

Style Factory for Steel Engineering W.L.L
11.2021 - 03.2022
  • Major scope:
  • Fabrication of Steel Structure, Fabrication steel Precast Mould, Fabrication of Tanks
  • Roles & Responsibilities:
  • Being a Planning engineer at Steel engineering, I was responsible for daily, weekly, monthly Progress report and planning of workshop fabrication, Bill of material, Material Procurement, Documentation, Quantity surveying and Invoice was also my core expertise.

Project Engineer

Ravi Green Engineering (Pvt.) Ltd.
02.2018 - 09.2021
  • Major scope:
  • Maintenance of Furnace Oil Tank (945-TK-27), Replacement of 5th Shell Course, Bottom Plates, Steam Coils and hydro testing.
  • Installation of Aluminium Doom Roof and Leak test of roof.
  • Replacement of bottom and steam coils of Asphalt Tank 1020 Tk5 and hydro testing.
  • Repair of Tank 930 Tk2 including Replacement of Roof, Roof Structure, 4th & 5th Shell Course including external & internal surface sandblasting and painting work.
  • Fabrication and Installation of leak Deduction System with Flow meter. Shutdown 2019.
  • Replacement of bottom and steam coils of Asphalt Tank 1020 Tk6 and hydro testing.
  • Ravi Green workshop Lahore:
  • Procurement, Fabrication, Testing of pig receiver & pig launcher for OGDCL Pakistan.

Site engineer

Zealcon Engineering Lahore
09.2016 - 02.2018
  • Major scope:
  • Fabrication and Erection of Structure
  • Fabrication and Erection Ducts
  • Fabrication of Calciner, Cyclones, Stacks, Cement mill, Raw mill, Grinding mills.
  • Roles & Responsibilities:
  • Grinding mill and Coal Mill Ducts, Material Calculation, Estimation etc.
  • Interaction with client to resolve various issues related to Production as well site aspects.
  • Review of Production documentation and Supervision of all fabrication
  • The QA/QC submittals of the subcontractors and ensures safety and quality standards of the client.
  • Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning Control Fabrication daily progress.

Assist Planning Engineer

FABCON Design & Engineering Lahore
03.2016 - 09.2016
  • Major scope:
  • Fabrication of Fire tube boiler and Deaerator.
  • Fabrication of Juice Heater.
  • Fabrication of structure, Plate form, overhead Bridge, Emergency stair etc. of Multan metro bus.
  • Roles & Responsibilities:
  • Planning, Monitoring, Reporting, and Expediting Construction Activities (Mechanical)

Project Co-ordinator

Descon Engineering (LMW) Lahore
01.2014 - 03.2016
  • Major Scope:
  • Fabrication of fire tube boiler economizer, deaerator and plate form for Coca Cola Beverage Lahore
  • Fabrication of WHR Boiler
  • Fabrication of Pipe Spools & Pipe support for K-Electric
  • Fabrication of water tube boiler, economizer and deaerator for Pakistan Refinery Ltd Karachi.
  • Fabrication of bagasse fire water tube boiler, economizer, Stack, ducting and structure for AL Moiz Sugar Mill Ltd. Pakistan

Maintenance Supervisor

Adam Sugar Mill Pvt Ltd.
07.2012 - 01.2014
  • Major Scope:
  • Fabrication and erection of steel structure.
  • Erection of sugar mill equipment
  • During season work as boiler operator at high pressure boiler 125 TPH water tube.

Education

DAE Mechanical -

Govt. College of Technology
Faisalabad, Pakistan

Bachelor Mechanical Technology -

University of NCBA&E
Lahore, Pakistan

Skills

  • Primavera P6
  • Auto Cad
  • ERP
  • MS Office
  • SAP
  • Auto Desk Inventor
  • Excellent written and verbal communication & interpersonal Skills
  • Power of decision making
  • Ability to lead
  • Problem solver
  • Goal oriented, self-motivated, hard worker with supporting background & educational capabilities
  • Safety awareness
  • Technical expertise
  • Cost control
  • Operations management
  • Project coordination
  • Construction management
  • Equipment installation

Certification

Project Management Professional PMP certificate No. 4168538 Expire Date: 2028-08-07.

Boiler Engineer “C” Class from Govt. of Punjab Boiler Examination Board Lahore Pakistan.

Languages

English
Urdu

Timeline

Site Engineer

Metscco Heavy Steel Industries Co. Ltd.
10.2023 - Current

Project Engineer

Ravi Green Engineering (Pvt.) Ltd.
04.2022 - 08.2023

Planning Engineer

Style Factory for Steel Engineering W.L.L
11.2021 - 03.2022

Project Engineer

Ravi Green Engineering (Pvt.) Ltd.
02.2018 - 09.2021

Site engineer

Zealcon Engineering Lahore
09.2016 - 02.2018

Assist Planning Engineer

FABCON Design & Engineering Lahore
03.2016 - 09.2016

Project Co-ordinator

Descon Engineering (LMW) Lahore
01.2014 - 03.2016

Maintenance Supervisor

Adam Sugar Mill Pvt Ltd.
07.2012 - 01.2014

DAE Mechanical -

Govt. College of Technology

Bachelor Mechanical Technology -

University of NCBA&E

RESPONSIBILITIES DURING PROJECT

  • Responsible to coordinate with engineering, Procurement and fabrication department to achieve the site execution target
  • Formulate detailed and optimized schedules (Level III,) including client and Sub-Contractor to minimize down time.
  • Progressing Reporting DPR & WPR
  • Highlighting areas of concerns to enable the senior management to take timely action.
  • Plan, coordinate and conduct comprehensive scope studies for scope clarification.
  • Prepare work breakdown structure coherent with execution team including weightage of different activities.
  • Prioritize the work as per work requirement.
  • Assist lead planning to validate work lists including Material, Resources, Services and other items.
  • Coordination with management in technical issues to meet project milestones dates.
  • Establishes communications with Design team to resolve field problems.
  • Performs inspection of all equipment installation work in progress on a continuing basis.
  • Executes field take-off from design drawings and provides input to the quantity tracking system.
  • Identify short coming in current methods process and procedures.
  • Scope identification in line with contractual requirements.
  • Preparation of planning package/Scope for projects.
  • Assisted execution team in applying maintenance procedures of static equipment’s (Heat Ex-changer, Distillation Columns, and Fire Heaters, reactors, Vessels, Tanks.
  • Preparing method statements, job safety analysis and blind lists, work packages, method statement in projects.
ABID HUSSAIN