Summary
Overview
Work History
Education
Skills
Software
Timeline
KEY Responsibilities as Pre-Commissioning
PERSONAL DETAILS
KEY ACCOUNTABILITIES
DECLARATION
Generic
Abid Jamal

Abid Jamal

Mechanical Engineer
Riyadh,01

Summary

A result-oriented professional with 10 Years of experience in Metro & Construction projects, Supervision & Planning, Coordination, Material Take-off, QA-QC activities, material handling & managing manpower with proper safety measures.

Overview

4
4
Languages
11
11
years of professional experience

Work History

Mechanical Engineer

Saudi Anion Contracting Company
Riyadh, Riyadh Region
12.2022 - Current
  • Implemented mechanical systems for construction projects, ensuring compliance with industry standards.
  • Collaborated with cross-functional teams to streamline project timelines and improve engineering processes.
  • Conducted root cause analysis for design failures, implementing corrective actions to prevent recurrence.

Mechanical Engineer

Vyan Tech Private Limited
Gurgaon
02.2022 - 12.2022
  • Conducted detailed load calculations to ensure accurate equipment sizing and system design.
  • Designed and optimized HVAC systems to enhance energy efficiency and performance.
  • Led cross-functional teams in the implementation of advanced HVAC technologies and solutions.

Mechanical Engineer

KG Tech Arabia
Riyadh
12.2019 - 12.2021
  • Collaborated with multidisciplinary teams to develop innovative engineering solutions.
  • Led projects from concept through execution, ensuring compliance with industry standards.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.

HVAC Engineer

Saicon Systems Private Limited
Gurgaon
03.2017 - 12.2019
  • Competition Commission of India (CCI)

HVAC Engineer

Air Excel
New Delhi
06.2015 - 03.2017
  • Red Carpet Grand Hospitality Private Limited

Education

Bachelor of Engineering - Mechanical

Uttar Pradesh Technical University (UPTU)
Uttar Pradesh
01-2015

Skills

Mechanical Design

Project Management

Project scheduling

Software

AutoCAD

Revit MEP

HAP

Timeline

Mechanical Engineer

Saudi Anion Contracting Company
12.2022 - Current

Mechanical Engineer

Vyan Tech Private Limited
02.2022 - 12.2022

Mechanical Engineer

KG Tech Arabia
12.2019 - 12.2021

HVAC Engineer

Saicon Systems Private Limited
03.2017 - 12.2019

HVAC Engineer

Air Excel
06.2015 - 03.2017

Bachelor of Engineering - Mechanical

Uttar Pradesh Technical University (UPTU)

KEY Responsibilities as Pre-Commissioning

  • Preparing Schedule for IRN Walkdown for all Stages
  • Monitor the status of IRN & Pre-Comm
  • Preparing Pre-comm WIR for all system package
  • Preparing Punch Closure Reports Prior to Approval of Energization
  • Prepare Installation Acceptance Test (IAT), Function Test Report (FTR), inspection Test Report (ITR)
  • Prepare Startup Test Report (STR) & Commissioning Log Sheet
  • Arrange & Prepare all Package Submissions & Handing over documentation

PERSONAL DETAILS

  • Date of Birth: Dec. 18, 1994
  • Nationality: Indian
  • Marital Status: Married
  • Faith: Islam
  • Languages Known: English, Hindi, Urdu & Arabic
  • Iqama Number: 2541995342

KEY ACCOUNTABILITIES

  • Installation of Chiller (Water Cooled & Air Cooled), Cooling Tower, Primary & Secondary Pumps, Axial Fan, Inline fan, VRF/ VRV System, Air Handling Unit (AHU), Fan Coil Unit (FCU), Window, Split Air-conditioning, Air Filter, Supply Fan, Exhaust, Self-Inertial Filter, Bleed Fan & Fresh Air Fan, HVAC Ducts, Grill, Diffuser, Pressure Testing of refrigerant & chilled water pipes.
  • Installation of Fire pump, Jockey Pump, Circulating Pump, Fire Pipes, Hydrostatic Testing of pipes, Zone Control Valve, sprinkler (Pendent, Up-right, sidewall, extended), Fire hose cabinet, Valve & Accessories.
  • Installation of Domestic water system pipes (UPVC, CPVC, PPR), Lifting Pump, Booster Pump, Circulating Pump, Electronic Trap Primer, GRP (Glass Reinforced Plastic) Tank. and Plumbing Accessories.
  • Installation, Testing & Commissioning of Sewer, Waste & Vent Pipe With all plumbing accessories such as Western WC, Eastern WC, Flush Valve, Wash basin mixer, Faucet ablution mixer, Water heater, Water Cooler, Shower tray etc.
  • Installation of Manhole, Inspection Chamber, Gully Trap, Floor Drain, Floor cleanout, Wall Cleanout, Sump Pump etc.
  • Installation of FM200 System accessories such as FM200 cylinder, pipes, nozzle, smoke detector, abort switch, manual pull station, bell, strobe light etc.
  • Installation of Compressed Air System such as Compressor, after cooler, dryer, receiver, and its accessories.
  • Responsible in Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all Mechanical and related works prior to execution.
  • Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
  • Manages directly and provide engineering and technical supports to all the Mechanical work groups at site.
  • Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
  • Cooperate with warehouse to determine which parts should be ordered for stock.
  • Measurement of items erected at site, preparation of variation & approval.
  • Monitoring of all MEP related works at site as per approved drawings and methods and safety rules.
  • Reporting – Daily, Weekly, Monthly progress Report (DPR, WPR, MPR) & Other any customized reports for Project/construction managers
  • Daily monitoring of all construction activities and raise inspections in timely manner
  • Prepare all logs related to all work activities
  • Review all Issued for Construction Drawings (IFC) & coordinate with Design Team for preparation of Shop Drawing as per site feasibility
  • Inhouse inspection of all Incoming Material as per specification and raise Material Inspection Request (MIR) for approval prior to Installation
  • Submit and follow up for Material Approval from consultant/Client representative
  • Review Inspection Test Plan (ITP), Method of Statement (MST), Job Hazard Analysis (JHA) & Construction work Package (CWP) for respective shop drawings to ensure the smooth running of the project
  • Prepare Site Planning as per Open front & feasibility
  • Manpower distributions in order to achieve planned Targets
  • Internal inspections for executed works and reporting to concern team for rectification if required to as certain standards of Quality & safety
  • Conduct welding Visual Inspection (VT) with welding inspector & consultant
  • Prepare Work Inspection Request (WIR) for all executed work within their respective disciplines
  • Preparation and Submittal for (RFI) & coordination with concern department & client
  • Participate in Client/ Management & sub-Contractor’s meetings to resolve project issues
  • Communicating effectively with co-workers, clients, consultants, contractors & sub-contractors as well as PMCs & other Building Services

DECLARATION

I hereby declare that information given above is true to the best of my knowledge and bear the responsibility for the correctness of the above-mentioned particulars. 

Place: Riyadh, Saudi Arabia 

Date: __________ 

Abid Jamal

Abid JamalMechanical Engineer