Summary
Overview
Work history
Education
Skills
LANGUAGES
Timeline
Generic
Afzal Ahmad

Afzal Ahmad

Riyadh,Saudi Arabia

Summary

A Competent ELV Project Engineer with a Comprehensive Knowledge of designing, developing, and maintaining ELV systems and components to required specifications, focusing on economy, safety, reliability, quality and sustainability. A Consistent track record of successfully completing projects from concept and detail of design through to implementation, testing and handover.

Overview

8
8
years of professional experience
4031
4031
years of post-secondary education

Work history

Project engineer

KTC International
Riyadh
2025.10 - Current
  • Managed end-to-end project execution, ensuring delivery within scope, time, and budget
  • Coordinated with cross-functional teams including design, procurement, and construction
  • Reviewed and approved engineering drawings, specifications, and technical documents
  • Monitored project progress and prepared regular status and performance reports
  • Ensured compliance with safety standards, quality requirements, and regulatory codes
  • Identified project risks and implemented effective mitigation strategies
  • Liaised with clients, consultants, contractors, and stakeholders to ensure alignment
  • Supported procurement processes including vendor evaluation and material submittals
  • Conducted site inspections and resolved technical issues in a timely manner
  • Optimized resource allocation to improve efficiency and reduce project costs
  • Assisted in project planning, scheduling, and cost estimation
  • Maintained project documentation and ensured proper record keeping

Senior Technical Engineer

Consolidated Engineering Systems Co
Riyadh, Saudi Arabia
2025.02 - 2025.10
  • Design and review ELV systems including CCTV, Access Control, Fire Alarm, Public Address, IPTV, Intercom, Structured Cabling.
  • Prepare system architecture diagrams, single-line diagrams (SLD), layouts, schematics, and riser diagrams.
  • Ensure designs comply with local and international standards
  • Perform system load calculations, device placement, and network topologies
  • Lead and coordinate ELV activities from concept to commissioning.
  • Prepare and monitor project schedules related to ELV systems.
  • Coordinate with clients, consultants, main contractors, and subcontractors.
  • Track project progress, identify delays, and implement corrective measures.
  • Ensure timely procurement and delivery of ELV materials and equipment.
  • Oversee site installation activities and ensure compliance with approved designs and safety standards.
  • Supervise testing, commissioning, and handover of ELV systems.
  • Conduct site inspections, attend coordination meetings, and resolve on-site technical issues.
  • Verify as-built drawings and documentation.
  • Provide technical support to project teams and junior engineers.
  • Prepare method statements, material submittals, compliance statements, and O&M manuals.
  • Conduct system demonstrations and training for end-users or facility teams.
  • Ensure all ELV installations meet quality and regulatory standards.
  • Carry out internal audits and site quality checks.
  • Coordinate third-party inspections and approvals.
  • Lead and mentor a team of ELV engineers and technicians.
  • Assign tasks, review work, and provide technical guidance.
  • Project: Oberoi Hotel and Branded Villas, Diriyah

ELV engineer

Detecon Al Saudia Co. Ltd (Detasad)
Riyadh
2023.02 - 2025.01
  • Working as ELV and Security System Engineer.
  • Support Site team to follow design and providing Solutions on site.
  • Installation and Configurations of CCTV (Dahua, Hikvision).
  • Installation and Configuration on Access Control system (Dahua).
  • Installation and Configuration of Arm Gate Barriers (Optima).
  • Installation and Configuration of ANPR and Video Intercom (Dahua).
  • Installation and Configuration of Half Height Turnstiles (Dahua, Hikvision).
  • Installation and Configuration of Full Height Turnstiles (Optima, Alfalak).
  • Installation and Configuration of Public Address System (Amperes).
  • Installation and Configuration of Disable Toilet Alarm System (Intercall).
  • Installation of Fire Alarm system (Edward).
  • Installation and Configurations of Dahua Embedded Storage Servers.
  • Installation and Configurations of Dahua Intelligent Video Surveillance Servers.
  • Installation of Dahua Digital Surveillance system for CMS and VMS.
  • Installation and Configuration of DSS Client Management Software.
  • Configuration of AI Events and Alarms.
  • Testing and Commissioning of Security systems with clients.
  • Installation and Configuration on RTLS (Sanitor).
  • Installation and Configuration of QMS (Wavetec).
  • Installation and Configuration of NCS (Hillrom).
  • Installation and Configuration of AV system (Huawei Idea Hub).
  • Installation of Triple Play System.
  • Implementation of Neom standards for all Low Current Systems.
  • Coordinate with Client Walk down and clear the Snags List.
  • OSP and ISP work to Complete Network Connectivity.
  • Prepared red Line drawings for all ELV and ICT works.
  • Prepare Cable Identification Lists.
  • Prepare and submit summary reports of conditions in buildings and recommend actions to be taken.
  • Promptly Respond to emergencies.
  • Coordination between Various Services of MEP.
  • Site surveys and inspections with client.
  • Implementation of work as per IFC drawings.
  • Coordinate with other departments of consultants and contractors for interface requirements.
  • Project: Neom Residential Communities (NRC 11,13,17,19 & 26)

Site Engineer

Saudi Services for Electro mechanics work co
Yanbu
2019.03 - 2023.01
  • Handling overall site responsibilities
  • Installation of CCTV & Security system.
  • Worked on OSP and ISP.
  • Installation of access control system
  • Installation operation of IPPS (In plant paging system) & laying of different cables
  • Installation operation & maintenance of siren system.
  • Implementation of work as per IFC drawings
  • Coordinate with Aramco inspection department for implementation of Aramco standards.
  • Coordinate with Client Walk down and clear the Punch List Items
  • Raising RFI for inspection with the work task is completed.
  • Experienced in the review of IWP (Installation Works Package) documents, IFC (Issued for Construction) Documents, Shop Drawings
  • Preparation of maintenance schedule and monthly report.
  • Guide the Engineers to adhere the safety standards and quality standards at work site
  • Manage and control the site activities to achieve the works as per contract schedule.
  • Attend Progress Meeting and co-ordination meeting with contractor and client
  • Guide the design team to prepare the design documents in accordance with employer’s requirements.
  • Very good in implementing and practicing high safety standards and quality standards at construction sites as per international norms and law of the country.
  • Preparation of Daily Activity Report to client and higher management
  • Prepared red Line drawings for all electrical works.
  • Coordination between Various Services of MEP
  • Promotes a safe work environment and provides leadership implementing Zero Accident philosophy.
  • Ensure that the Design meets all relevant Codes and Standards.
  • Project: Yanbu Distribution Hub

Site Engineer

Pakistan Telecommunication Co. Limited (PTCL)
Islamabad
2018.01 - 2019.01
  • Installation, Operations and maintenance of CCTV (Multi-vendor).
  • Installation, Operations and maintenance of Telephony systems.
  • Operations and maintenance of Fire Alarm systems Installation.
  • Operations and maintenance of speaker system Site survey & Sit Implementation as per design Installing cable tray and Laying of different cables.
  • Preparation of Daily Activity Report to client and higher management.
  • Coordinate with Client Walk down and clear the Punch List Items.
  • Prepared red Line drawings for all electrical works.
  • Making notes in site observation book if found any violation at site.
  • Making the inspections for installation of cable trays, trunks and cable ladders as per approved shop drawings and project specifications.
  • Raise (RFIs/WIR) Work inspection request for site work, when the task is completed and ready for inspection.
  • Follow up and update the Site Walk reports
  • Promptly Respond to emergencies.
  • Assign works to technical teams and follow up on work completion
  • Effectively managing 10 full-time staff, including team leaders and technicians, to maintain all facilities-related works/repairs.
  • Prepare and submit summary reports of conditions in buildings and recommend actions to be taken.

Education

DAE - Telecommunication

Punjab Board of Technical Education
Rawaloindi (Pak)
11.2012

Bachelor of Science - Telecommunication

Peshawar (Pakistan)
09.2018

Skills

  • Leadership
  • Problem Solving
  • Creative thinking
  • Organization & Time management
  • Communication Skills
  • Decision making capacity

LANGUAGES

English
Urdu
Arabic

Timeline

Project engineer

KTC International
2025.10 - Current

Senior Technical Engineer

Consolidated Engineering Systems Co
2025.02 - 2025.10

ELV engineer

Detecon Al Saudia Co. Ltd (Detasad)
2023.02 - 2025.01

Site Engineer

Saudi Services for Electro mechanics work co
2019.03 - 2023.01

Site Engineer

Pakistan Telecommunication Co. Limited (PTCL)
2018.01 - 2019.01

DAE - Telecommunication

Punjab Board of Technical Education

Bachelor of Science - Telecommunication

Afzal Ahmad