Civil Site Engineer with 8+ years of GCC experience in large-scale airport and infrastructure projects in Qatar and Saudi Arabia. UPDA/MMUP registered engineer with strong expertise in structural works, architectural finishes, shop drawing implementation, QA/QC inspections, and compliance with QCS and SBC standards. Experienced in coordinating with consultants, subcontractors, and MEP teams to ensure timely execution in accordance with IFC drawings, method statements, and project specifications.
Overview
10
10
years of professional experience
1
1
Certification
Work history
Civil Engineer
TAV Construction
Jeddah, Saudi arabia
2025.06 - 2026.02
Rehabilitation of King Abdulaziz International Airport (KAIA) – South Terminal, Jeddah
Supervised and executed structural and architectural works within the South Terminal expansion, ensuring compliance with IFC drawings and project specifications.
Produced detailed daily and weekly progress reports, effectively keeping consultants, clients, and stakeholders informed.
Coordinated closely with architects and design consultants to resolve drawing discrepancies and ensure design accuracy on site.
Managed and monitored site activities, improving workflow efficiency and maintaining alignment with construction schedules.
Proactively identified and resolved on-site technical issues to mitigate delays and prevent contractual disputes.
Oversaw Quality Control (QC) inspections for civil and finishing works, ensuring adherence to project standards and airport authority requirements.
Conducted regular risk assessments and implemented corrective actions to enhance site safety and comply with HSE regulations.
Coordinated contractors, subcontractors, and labor teams to ensure timely completion of assigned works.
Optimized resource allocation by sourcing cost-effective materials and managing manpower in line with project constraints.
Ensured proper execution of terminal interior finishes, including gypsum works, stone cladding, GRG installations, ceiling systems, and partition works.
Monitored MEP coordination interfaces to avoid clashes and ensure smooth integration within terminal operational areas.
Assisted in preparing RFIs, RFCs, method statements, and material submittals for consultant approval.
Civil Engineer
TEPE AKFEN, TAV Construction
Doha, Qatar
2020.06 - 2025.01
Managed structural and architectural site implementation for Hamad International Airport Passenger Terminal expansion project, valued at over $500 million
Coordinated with MEP and security teams to integrate access control and security systems, ensuring seamless functionality
Supervised installation of steel structures, reinforced concrete, and architectural elements, ensuring compliance with quality and project specifications
Generated weekly progress reports and prepared detailed method statements to support project documentation
Ensured site safety by implementing rigorous health and safety protocols.
Facilitated adherence to project timelines, promoting timely task completion.
Enhanced efficiency through systematic site inspections and proactive maintenance.
Facilitated construction activities to align with established project plans.
Conducted soil tests, resulting in stable and secure foundations.
Liaised with architects for accurate implementation of blueprints.
Prepared detailed reports to communicate progress to stakeholders.
Used advanced surveying technology, ensuring precise measurements and alignments.
Delivered projects within deadline by efficiently managing resources and personnel.
Resolved technical issues for seamless operations on the construction site.
Facilitated training programmes for new staff members enhancing their skill sets and productivity.
Dealt with subcontractors negotiating favourable terms and conditions for contracts.
Implemented innovative engineering solutions improving overall performance of constructions works on site.
Monitored supply chain management reducing delays in delivery of essential materials.
Supervised site work to verify quality and safety standards ahead of sign off.
Carried out construction works in accordance with Qatar Construction Specifications (QCS).
Coordinated inspection requests (IR) and material inspection requests (MIR)
Conducted snagging and de-snagging prior to consultant inspections
Reviewed shop drawings prior to site execution
Ensured compliance with FIDIC contract requirements
Prepared handover documentation and as-built drawings
Site Engineer
AL FOWRIYA Trading and Contracting Company
Doha, Qatar
2017.12 - 2020.06
Coordinated excavation and construction schedules for Caustic Soda Project, KLJQ Refinery, MIC Qatar, optimizing resource utilization
Managed over 70 skilled workers on-site, maintaining efficient workflows and adherence to design requirements
Supervised the assembly and installation of reinforced concrete structures and coordinated with consultants on technical issues
Coordinated construction activities to ensure alignment with project plans.
Harnessed strong data analysis and modelling to deliver complex engineering calculations.
Completed complex technical surveys for large-scale developments.
Carried out diligent site surveys and research to predict and quickly resolve possible issues.
Project Engineer
PMK Construction Pvt Ltd
Trivandrum, India
2016.05 - 2017.10
Directed structural and architectural works for KIMS Medical City Hospital, including pile driving, concrete pouring, and formwork installations
Ensured accuracy in rebar schedules and compliance with project specifications
Participated in regular training programmes to stay abreast of industry trends and advancements in technology.
Captured project outputs for ongoing analysis and progress monitoring.
Evaluated risk indexes to meet data and process audit needs.
Identified and rectified quality issues, minimising operational disruption.