Ensure efficient and seamless flow of information and communication within Scope & Planning Division personnel as well as with other Turnaround Divisions, as necessary.
providing input for planning and scheduling for critical rotating and static equipment's.
Tracking all back locks upcoming overdue and planned job.
Close look on spare parts availability and material movement.
Attending Daily Weekly and monthly meeting with operation, process, inspection, reliability, Warehouse and T&I department.
Engaged in major Satorp T&I as an Area lead.
Mechanical supervisor
Sadara Chemical Company on behalf SRACO and SEPAM
Al Jubayl, Eastern Province KSA
01.2016 - 07.2022
Successfully Completed Mechanical Pre-Commissioning, Commissioning. Utilities, Mix Feed cracker Unit of (Sadara) a joint venture project Dow and Saudi Aramco. It has 26 major production units. It is the world largest integrated chemical complex in Al Jubail Industrial City, Saudi Arabia
Work closely with the plant operation, safety department for all kind of Mechanical PM/CM activities.
Review procedures, data sheet, jobs steps, P&ID,LOTO and isolation plans before jobs execution
performing PM /CM on all static and rotating equipment's
Engaged in shutdown on major overhauling of Exchangers, Furnace, boilers, distillation column, Drums inspection.
Filling and verifying PM/Cm checklist and handover to QC
Fabrication supervisor
Reliance Industries Limited
Jamnagar, India
06.2013 - 12.2015
Worked as Pipe fabrication Supervisor on behalf of Nirman India and Chatterjee Engineering from 2023 - 2015
Responsible for supervising shop personnel related to piping fabrication & assembly required for successful completion of project.
Performing welding joints check with SMAW,GTAW,FCAW after fit-up pass.
To offer for inspection on various steps of welding.
Continuous monitoring of welding machine voltage, electrode oven temperature as per code and standards for ASME 13.3.
Making lots for NDT inspection as per NDT test and handover to clint after the final approval inspection report.
Tracking of all welding tools inspection due dates and workers KPI