Summary
Overview
Work History
Education
Accomplishments
Timeline
Generic
AHMAD JUNED

AHMAD JUNED

Summary

  • All MS
  • Ce packages: MS-word, MS-Excel, Power-point, Experience of functioning in Computerized Environment in addition to SAP for subcontract management. Cost x for quantity takeo as well as Auto cad for QS activities
  • A Team Leader and Motivator: I am a Post Graduate Engineer having experience in a variety of Procurement activities. Pre- Tender and Post Tender stage of works. Procurement is my main eld of experience others are Value Engineering, variation claim and Contract management. In building infrastructure works Role demands planning, budgeting, and mobilization of sta on time within budget. My career includes being a successful team leader of Procurement management and consultancy services, costing, and claiming for any variation from contract documents. All types of contract handling such as lump sum, design-build contract, re- measurement contract.

Overview

16
16
years of professional experience
6
6
years of post-secondary education

Work History

Sr Quantity Surveyor / Cost Engineer

Riyadh KSA, Parsons
Jeddah
11.2021 - Current
  • A0371b/
  • OBJECTIVE To provide good economic, e cient timely, latest technology with good modular, readily adaptable, time tested solution in compliance to worlds latest accredited standards, code of practice, aesthetic, safe and free from risk of obsolescence to the best of customers satisfaction.

Sr Cost Engineer

Corderoy International, Riyadh KSA
04.2020 - 11.2021

Quantity Surveyor

Shapoorji Pallonji ME LLC
Riyadh
10.2018 - 04.2020

QS / Costing Engineer

Larsen and Toubro Ltd
Riyadh
02.2014 - 10.2018

Quantity Surveyor

Advance Vision Co
, Delhi
08.2009 - 02.2014

Site Engineer

Rites Ltd
03.2007 - 07.2009

Sr Commercial Specialist

  • IQAMA STATUS- TRANSFERABLE VISA

Education

Master Degree - Engineering

Aligarh India
07.2005 - 10.2007

Bachelor Degree - Engineering

Z.H College , A.M.U Aligarh
07.2000 - 08.2004

undefined

A.M.U Aligarh

Accomplishments

  • PROJECTS 1
  • KAFD Project -Riyadh KSA 2
  • Makkah Third Expansion project
  • 3
  • Marriott hotel projects 5-star Hotel services
  • Riyadh 4
  • Riyadh Metro Project: Line-1 and Line-2
  • 5
  • Princess Noora University Monorail Project
  • India 6
  • Delhi Metro Rail Corporation
  • CERTIFICATIONS & COURSES Saudi Council of Engineers Member since 2012
  • Plans contract activities, including pre-award schedules.
  • Recommends new and revised policies and procedures.
  • Advises appropriate Manager on contractual matters and is the principal advisor at the Project level about the strategy for, and the conduct and recording of contract pre-award negotiations
  • Respond to all post-contract contractual correspondence and actively lead and mediate in any disputes with contractors/consultants
  • Assist / Lead in the management of claims and contractual responses.
  • Reviews work of Contract Administrators for correctness and policy and procedural compliance
  • Participates in the selection, training, and evaluation of personnel.
  • Assists in presentations to senior management
  • Fit-out works in high- rise buildings for
  • Ces and residential
  • Pre-Contract and Post-Contract works.
  • Advising Employer on Contractual and Commercial matters.
  • Meeting with Client on weekly basis for project progress updates.
  • Preparation of monthly valuation reports for the progress of the project and ensured necessary cost control on the project
  • Progress billing, veri cation & reconciliation of interim payment certi cates, variation review, claim for abortive works done & cash ow analysis
  • Material Management & Inventory Cost Control.
  • Maintaining current cost control databases, reviewing proposed schedule changes with construction personnel, client, and contractors, and being able to ensure and perform e ective cost control functions for all ongoing projects
  • Assisted varied functions such as preparing cost estimates, forecasting the budget, reporting on the present costs, and interpreting the nancial risks that were involved in the project
  • Assisted the Project Contracts Manager in various assignments & audits e ectively to organize the project assets and liabilities
  • Pre-contract Assessment (Preparation of BOQ, Analysis of General conditions of contract, Comparative statements, Material submittals.)
  • Ability to interpret drawings and BOQ breakdown, Tender evaluation, and all as per Contractual Measures
  • Sub-Contractors & Consultants Interim Payment and Final
  • Settlement
  • Identify and value Variations, transferring these sums to Valuations.
  • Rate Analysis requirements for estimates, Variations & Claims.
  • Preparation of periodic Project Status Report & Variation Log.
  • Evaluation of Bidder quotations and preparation of comparison statement
  • Develops standard operating procedures for the procurements and ensures that QDP follows them so there is operational consistency across the program
  • Facilitates forming partnerships with key stakeholders and organizations impacted by the program
  • Responsible for internal procurement among our team (including subcontractors and sub-consultants)
  • Responsible for external procurements, including all major contracts that will include reaching out to contractors and suppliers, facilitating express of interest discussions, coordination with QIC Procurement, conducting tender evaluations, and shortlisting a preferred contract award
  • Responsible for working closely with QIC and delivery partners to ensure the best program procurement decisions, including local authorities and key third parties
  • Reports procurement challenges and issues to the Senior
  • Procurement Manager and develops appropriate resolutions/mitigations as necessary
  • Maintains clear and concise work standards and goals; provides training and development; completes performance evaluations, conducts employee counseling, and takes corrective action as necessary
  • Responsible to control and monitor project total expenditure including verifying and checking invoices and claims from suppliers, vendors, and subcontractors to ensure that all project expenditures are captured and properly recorded
  • Quantity takes
  • From drawings and estimation for precontract tender
  • Perform technical and commercial review of EPCI long-time tenders (subcontractors quotations) for the preparation of Service agreements
  • Calculating monthly forecasts for billing and giving targets to the site team
  • Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion of the project work
  • Meeting with the client for variation and claim and approval.
  • Weekly meeting and circulation of MOM for points discussed and agreed upon
  • Preparation of Interim payment certi cate and taking its approval from the client
  • Perform project costing-related reporting to the team and management review monthly to ensure that expenditures are kept within the project budget
  • Value Engineering and cost saving for
  • Employer
  • The material takes
  • For Tendering, Costing, and Procurement purposes
  • Preparing and sending Inquiries to suppliers.
  • Preparation of pre-award Request for Proposal, veri cation of the accuracy of bid packages, and participation in the pre-award evaluation/negotiation process including a functional role as Bid
  • Evaluation Team Lead
  • Coordination with di erent subcontractors for allotting subcontract work, especially electromechanical contractors
  • Preparation of monthly valuation reports for the progress of the project and ensured necessary cost control on the project
  • Progress billing, veri cation & reconciliation of interim payment certi cates, variation review, claim for abortive works done & cash ow analysis
  • Material Management & Inventory Cost Control.
  • Maintaining current cost control databases, reviewing proposed schedule changes with construction personnel, client, and contractors, and being able to ensure and perform e ective cost control functions for all ongoing projects
  • Assisted varied functions such as preparing cost estimates, forecasting the budget, reporting on the present costs, and interpreting the nancial risks that were involved in the project
  • Assisted the Project Contracts Manager in various assignments & audits e ectively to organize the project assets and liabilities
  • Pre-contract Assessment (Preparation of BOQ, Analysis of General conditions of contract, Comparative statements, Material submittals.)
  • Ability to interpret drawings and BOQ breakdown, Tender evaluation, and all as per Contractual Measures
  • Sub-Contractors & Consultants Interim Payment and Final
  • Settlement
  • Sub-Contractors & Consultants Interim Payment and Final
  • Settlement
  • Identify and value Variations, transferring these sums to Valuations.
  • Rate Analysis requirements for estimates, Variations & Claims.
  • Preparation of periodic Project Status Report & Variation Log.
  • Evaluation of Bidder quotations and preparation of comparison statement
  • Project track construction and system installation work.
  • System construction and coordination with track and MEP work.
  • Coordination with di erent subcontractors for allotting subcontract work
  • Sub-Contractors & Consultants Interim Payment and Final
  • Settlement
  • Identify and value Variations, transferring these sums to Valuations.
  • Rate Analysis requirements for estimates, Variations & Claims.
  • Preparation of periodic Project Status Report & Variation Log.
  • Evaluation of Bidder quotations and preparation of comparison statement
  • Project track construction and system installation work.
  • Coordination with di erent subcontractors for allotting subcontract work, especially electromechanical contractors
  • Preparation of monthly valuation reports for the progress of the project and ensured necessary cost control on the project
  • Progress billing, veri cation & reconciliation of interim payment certi cates, variation review, claim for abortive works done & cash ow analysis
  • Material Management & Inventory Cost Control.
  • Maintaining current cost control databases, reviewing proposed schedule changes with construction personnel, client, and contractors, and being able to ensure and perform e ective cost control functions for all ongoing projects
  • Assisted varied functions such as preparing cost estimates, forecasting the budget, reporting on the present costs, and interpreting the nancial risks that were involved in the project
  • Assisted the Project Contracts Manager in various assignments & audits e ectively to organize the project assets and liabilities
  • Pre-contract Assessment (Preparation of BOQ, Analysis of General conditions of contract, Comparative statements, Material submittals.)
  • Ability to interpret drawings and BOQ breakdown, Tender evaluation, and all as per Contractual Measures
  • Sub-Contractors & Consultants Interim Payment and Final
  • Settlement
  • Site Inspection of work completed by Contractor
  • Rate Analysis requirements for estimates, Variations & Claims.
  • Preparation of periodic Project Status Report & Variation Log.
  • Evaluation of Bidder quotations and preparation of comparison statement
  • Project track construction and system installation work.
  • System construction and coordination with track and MEP work.
  • Coordination with di erent subcontractors for allotting subcontract work

Timeline

Sr Quantity Surveyor / Cost Engineer

Riyadh KSA, Parsons
11.2021 - Current

Sr Cost Engineer

Corderoy International, Riyadh KSA
04.2020 - 11.2021

Quantity Surveyor

Shapoorji Pallonji ME LLC
10.2018 - 04.2020

QS / Costing Engineer

Larsen and Toubro Ltd
02.2014 - 10.2018

Quantity Surveyor

Advance Vision Co
08.2009 - 02.2014

Site Engineer

Rites Ltd
03.2007 - 07.2009

Master Degree - Engineering

Aligarh India
07.2005 - 10.2007

Bachelor Degree - Engineering

Z.H College , A.M.U Aligarh
07.2000 - 08.2004

Sr Commercial Specialist

undefined

A.M.U Aligarh
AHMAD JUNED