An ambitious Electrical Engineer and diligent in his work. I have Solid experience on Construction, Installation and Witness testing & Commissioning at various projects, also interested in maintenance management. I would like to utilize my experience to contribute to the success of the organization. I am seeking a role that allows for professional growth and provides opportunities to collaborate with a dynamic team in a stimulating work environment. My objective is to make a significant impact and contribute to the company's goals while continuously expanding my knowledge and skills.
Overview
7
7
years of professional experience
1
1
Certification
Work history
Electrical Engineer
Fichtner Consulting Engineers
Shuqaiq-4 SWRO Plant
07.2022 - Current
Supervising all site activities, materials as per standard, project specifications, documents, quality procedure and HSE policies
Review and reply to contractor's submittals such as Method statement, MIR, ITP, SAT procedure, handing over procedure
Conducting site inspections, installations, and witness testing & commissioning of all electrical equipment such as (GIS, Transformers, MV SWGR, VFD etc.) for final approval prior to energize the site
Meeting with client and converting MOM to actionable planned
Conducting weekly meetings at site with contractor to discuss the site progress and advise them to execute project within the approved budgetary limits, and monitor the actual expenditure against budgets, equipment's demands, manpower control, safety, and quality issues
Witnessing SAS interfacing signal verification with approved standard of SEC
Witnessing Switch Gear interlock verification with approved parameters
Witnessing Transformer GIS, and switchgear trip signal
Coordination with operation department to verify and reset the master alarm and trip alarms during up normal situation
Verify all Relay final settings before energization of all systems
Coordinate with project teams including Civil & Mechanical to complete all relevant activities to avoid any delay for electrical works
Plan and analyze the priority of activities and ensure timely completion of tasks as per baseline schedule
Maintaining site documents, drawings, reports, and O&M manuals for handover process
Resolving any unexpected technical difficulties and other problems that may arise.
Electrical Inspector
Poyry Consulting Engineers
Shuqaiq Phase-3 Water Transmission System
10.2021 - 07.2022
Conduct inspections according to project specifications and IFC drawings
Conduct daily inspections as per the daily Request for Inspection (RFI) schedule for site construction activities and material received at the site
Responsible to issue Non- Conformance Report (NCR) if the work is not performed according to specifications and standards
Check receiving, storage & handling of construction materials ensuring whether they are complying with Specifications, also checking that executions are based on the latest revisions of drawings
Inspect electrical Installation of grounding system and check the continuity & earthing resistance test
Inspect electrical Installation of Cable ladder for each level such as (MV, LV) Cables
Inspection of electrical installations and witnesses of tests of MV/LV Switchgear with consideration all cubicles to be at same level for bus bar connection
Inspection of electrical installations and witnesses of tests of MV Variable frequency drive (VFD)
Inspection of electrical installations and witnesses of tests of three Power Transformers 132KV/13.8KV
Inspection for Cable Pulling and Termination for HV/MV Cables
Witness Cable Continuity Test, Insulation Resistance test for HV/MV/LV cables and Hi-pot Test for MV/HV Cables
Inspection of electrical installations and witnesses of tests of Distribution Transformers 13.8KV/0.4KV
Inspect electrical Installation of DC Batteries and UPS system
Installation of grounding system embedded in slab, connected to structure, connected to panels and outer main grid
Installation of Cable ladder for each level such as (MV, LV) Cables
Installation of MV/LV Switchgear with consideration all cubicles to be at same level for bus bar connection
Installation of Power Transformers 132KV/13.8KV amt it is parts such as radiators, conservator tank
MV/LV Cable pulling inside the basement through the underground HDPE conduits to cable ladder with consideration of putting lubricant through manholes to avoid damaging the cables
Installation of Distribution Transformers 13.8KV/0.4KV
Installation of DC Batteries and UPS system
Lighting and small power cable laying coming from Rigid metallic tube (RGS) to the lighting cable tray.
Trainee Electrical Engineer, shuqaiq
SWCC
Shuqaiq Phase-1 Desalination Plant
06.2017 - 08.2017
Maintenance, supervision, and operation for following:
Generators
MV/ LV Motors
Power and Auxiliary Transformers
UPS system
Cathodic Protection
Relays and Protection Circuits.
Education
Bachelor's Degree - Electrical Engineering
Jazan University
Skills
Expert knowledge of Electrical Engineering and awareness towards safety measures and quality parameters
High dedication to working under deadline and pressure
Project Management and Construction Management
Maintenance Management
Communication Skills
Microsoft Office
Ability to Work in a Team
Certification
MV Switchgears & Modular Power Systems from SCE
Digitalization in Power Distribution Boards from SCE
Maintenance Management Professional from SCE
Effective Management of Operation and Maintenance in Buildings from SCE
Project Coordinator (1,200 MW Bundelkhand Solar Power Project) at Fichtner Consulting Engineers (India) Private Ltd.Project Coordinator (1,200 MW Bundelkhand Solar Power Project) at Fichtner Consulting Engineers (India) Private Ltd.