Experienced Technical Office Manager recognised for strategic leadership and streamlined operations. Enhanced team productivity and optimised workflow processes, resulting in significant cost savings and improved project delivery times. Proven ability to manage complex projects, fostering collaborative and innovative work environment.
Position: Technical Office and Procurement Manager for Mechanical Department from 2020 to present.
Duties and Responsibilities:
Permanent segregation of Hajj & Umrah – Jeddah Airport.
Dr. Suliman Al-Habib medical group Al-Ahadeer medical center -
Riyadh.
Dr. Suliman Al-Habib medical group Al-Narjis medical center -
Riyadh.
AQUAT ( Albaik) 2119 Factory Project - Jeddah.
Souq 7 Project - Central Park - Jeddah.
Souq7 Project, Buildings (102, 103, 104) - Jeddah.
Souq7 Project, Building (94, 95, 96) - Jeddah.
Tahlia Retail Mall - Jeddah.
Fit-Out Interior Finishes TAHAKOM Head Quarter - Riyadh.
SIGMAC Mall - Jeddah.
Renovation Of International Extended Care Center (IEC) - Jeddah.
Empire Cinemas Al Othaim Mall - Riyadh.
Reel Cinema @ Granda Centre - Riyadh.
MBC Group - Al Narjis Studio Complex RFP - Phase 1 - Riyadh.
MUVI Cinema Al-Ahsaa Mall – Ahsaa.
MUVI Cinema Al-Jubail Mall – Jubail.
MUVI Cinema Al-Khaleej Mall – Riyadh.
MUVI Cinema Al-Nakheel Mall – Riyadh.
MUVI Cinema Aziz Mall – Jeddah.
MUVI Cinema Haifaa Mall – Jeddah.
MUVI Cinema Mall Of Dhahran – Dammam.
MUVI Cinema Boulevard University – Riyadh.
MUVI Cinema Atelier La Vie - Jeddah.
MUVI Cinema Salam Mall - Riyadh.
MUVI Cinema Unayza Boulevard - Unayza.
Octo City Jeddah Park - Jeddah.
AMC Cinemas Garden Mall - Hail.
AMC Cinemas Tabouk Boulevard - Tabuk.
Position: Technical Office Support and Execution Projects Manager in western area from 2016 to 2020
Duties and Responsibilities:
Alfarouk Trading Real Offices Project - Jeddah.
Sidra Mall - Riyadh.
Emirates NBD bank - jeddah.
VOX Cinemas Red Sea mall @ Jeddah.
Aljazeera Bank head quarter @ Jeddah.
Abercrombie & Fitch - Jeddah.
Hollister & All Saints - Jeddah.
Holiday Inn Hotel Extension - Jeddah.
Al-Hamra Hotel Renovation - Jeddah.
Empire Cinema Al-Andalus Mall - Jeddah.
Empire Cinema Al-Rashid Mall - Abha.
Cinepolis Cinema Massarah Plaza - Jeddah.
Samra Ibn Jandab School - Abha.
Primary School 10 - Abha.
Mohammed Ibn Serein School - Abha.
Mutawasetat Al-Yaqin School - Abha.
Project: King Abdullah Bin Abdul Aziz, Custodian of the Two Holy Mosques Project for Madinah Central Utility Complex & Utility Tunnels (CUC1).
Consultant: Dar Al-handasah (shair and partners).
Duties and Responsibilities:
Project: Al Wuqaisy Commercial Building (Hotel) – plot no. 5008
Markaziya (central area) eastern side of AL haram Alnabawy.
Consultant: Abdurazak Hakeem Consulting Engineer.
Duties and Responsibilities:
Project : Car Parking Project – Islamic University.
Consultant: Sohail Hefzy Consulting Engineer.
Duties and Responsibilities:
Project : Albustan Complex Mixed Use Development that includes (Novotel hotel, Office building, Three apartments building and five basements).
Main contractor: Alhabtoor Lighton Group.
Main consultant: The Cox Group (COX).
Project manager: Canadian Project Managers (CPM).
Duties and Responsibilities:
York AHUs, FAHUs, PCUs, FCUs and VAV boxes.
Jet Fans (nu air-UK), ventilation Fans (Penn-USA).
ETS room connected to Tabreed (district cooling system) that
includes Heat Exchanger (4 units with combined capacity 8000 TR),
chilled water pump (8 units-220GPM each) and pressurization
pumps (1800 litter capacity each unit).
Chilled water pipes network.
Air distribution system.
Black steel kitchen exhaust duct for apartment kitchen and kitchen
hoods.
BMS. (Johnson control).
Fire Fighting network (dry and wet systems).
Review of drawings (tender, shop, coordination and as-built
drawings) based on Specification and consultant’s requirements.
Installation of HVAC chilled water system system (York chillers,
Air Handlin units and Fan coil units).
Energy Transfer Station that includes chillers (3 units with combined
capacity 580 TR), chilled water pump (10 units with different
capacities) and cooling towers (3 units with 725 TR capacities).
Chilled water pipes network.
Fire fighting network (wet system & dry system).
Preparing calculation for the systems, shop drawing and technical
material submittal.
Installation of HVAC DX systems required for the building.
Installation of Fire Fighting (wet system & dry system).
Installation of Plumbing systems (water supply & drainage).
Preparing calculation for the systems, shop drawing and technical
material submittal.
Studying and Estimating of mechanical works for the following tender projects:
HAP software certified from CARRIER company