Summary
Overview
Work History
Education
Skills
Certification
Languages
Affiliations
Timeline
Generic
Ahmed Elsahn

Ahmed Elsahn

Riyadh,Saudi Arabia

Summary

Organized Office Manager with noted experience in administrative management. Prioritize projects and multitask effectively to achieve project goals. Methodical and detail-oriented team player with expertise in team leadership.

achieving management professional possessing excellent communication, organizational and analytical capabilities.

Overview

21
21
years of professional experience
1
1
Certification

Work History

Technical Projects Manager ,Corporate, PMP, LEED

BEC ARABIA CONSTRUCTION Co. KSA BRANCH
Riyadh , Saudi Arebia
01.2016 - Current

Project Accomplished:

  • KAP2E , & KAP5 , Design and implementation of security facilities for the Ministry of Interior. MOI,

Projects Budget : 5Bil SR

Client : MOI

Position : Technical Project Manager

  • NEOM - Outer Region

Livability Hub, Design and built complex of cafes and restaurants in the as per Neom Procedures.

Project Budget : 150M SR.

Position : Technical Project Manager

  • Hilton, Hampton, Design and built,

Project Budget : 250M SR.

Position : Technical Project Manager

  • AMALA , RedSea, Built and procure the Staff Village of Redsea team.

Project Budget : 1.6bil SR.

Position : Technical Project Manager.

  • Sindalah Island , Built and procure 3 clusters with Neom , Aecom, Jacops

Project Budget : 3bil SR.

Position : Technical Projects Manager.

  • WAVEII Schools , Design and Built 60 schools with TBC,

Project Budget : 1.5bil SR.

Position : Technical Project Manager.

  • Medical Center 28M & 29M, MOI. Madinah & Makkah.

Project Budget : 1.5bil SR.

Position : Technical Project Manager.

Responsibilities:

  • Managing technical departments of all company projects included 75 employees , Engineers, Draftsman, Specialists item with continuous follow up and mentoring for to achieve all goals.
  • Follow up and solve sites issues related to local authority such as (Civil defense approval, Ministry of Environment to approve treatment plants, Hydrological study and flood mitigation , Security study for the security facility projects. Environmental Study,
  • Proficient in utilizing Building Information Modeling (BIM) technology to streamline decision-making processes throughout all stages of construction. Experienced in leveraging BIM models to develop comprehensive designs tailored to meet client specifications and project requirements. Demonstrated track record of successfully managing multiple projects, overseeing their progression from initial design phases to the final As-built stage." (NEOM, AMALA ,ALULA, KAP2,5).
  • "Proficient in generating and managing Follow-up & Coordination Drawings, including Design, Shop Drawings, and Composite Drawings, ensuring alignment with project specifications and standards. Skilled in conducting regular design meetings and workshops with consultants, designers, subcontractors, and clients to address pending issues promptly, proactively mitigate potential delays, and maintain project momentum. Utilized various project management methodologies to effectively manage scopes and deadlines, resulting in timely project delivery and cost savings. Enhanced project outcomes through diligent implementation of cost controls and rigorous budget management. Facilitated technical and client meetings, fostering transparent communication channels and strengthening stakeholder relationships to drive project success."

Head Of Architectural

SAUDI BINLADIN GROUP
Riyadh , Saudi Arebia
05.2013 - 01.2016
  • Projects, KAP3, SBI. (South Boarder)
  • Leadership and Team Management
  • Provide leadership and direction to the architectural team, guiding them in achieving project goals and objectives.
  • Mentor and develop team members, fostering a collaborative and high-performance work environment.
  • Delegate tasks effectively, leveraging team strengths and expertise.
  • Following up developed design starting from Design concept up to detailed design to the IFC and Shop drawings,
  • Following up Coordination issues of design stage and site activities.


Senior Architecture Design Engineer

The Associated Engineering Partnership "TAEP Office
Kuwait , Kuwait
01.2006 - 04.2013
  • Carrying out the Design for several projects such as : (AMIRI Terminal Building Airport in Kuwait , Khittan Stadium. Kuwait Committee for Women's Affairs Kuwait )
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Maintained excellent attendance record, consistently arriving to work on time.
  • Collaborated with team members to achieve the design results.
  • Participated in team-building activities to enhance working relationships.

Architecture Design Engineer

Misr Consulting Engineers"
Cairo , Egypt
06.2003 - 01.2005
  • Carrying out Design for several projects
  • Develop design stages based on Standard cods.
  • Initiate working detailed design included interior design.


Education

Bachelor of Arts - Architectural Engineering

Helwan University
Cairo
04.2001 - /2003

Skills

  • Ul>
  • Staff Management
  • P>Design Section
  • P>AutoCad 2D, 3D
  • P>PhotoShop
  • P>BIM Revit
  • P>Word, Excel, & PowerPoint
  • Contract management
  • Strategic planning
  • Key stakeholder engagement

Certification

  • Project Management Professional (PMP)
  • BIM Revit
  • LEED V4 GA

Languages

Arabic
Native
English
Fluent

Affiliations

  • Football,
  • Swimming

Timeline

Technical Projects Manager ,Corporate, PMP, LEED

BEC ARABIA CONSTRUCTION Co. KSA BRANCH
01.2016 - Current

Head Of Architectural

SAUDI BINLADIN GROUP
05.2013 - 01.2016

Senior Architecture Design Engineer

The Associated Engineering Partnership "TAEP Office
01.2006 - 04.2013

Architecture Design Engineer

Misr Consulting Engineers"
06.2003 - 01.2005

Bachelor of Arts - Architectural Engineering

Helwan University
04.2001 - /2003
  • Project Management Professional (PMP)
  • BIM Revit
  • LEED V4 GA
Ahmed Elsahn