Senior Civil Engineer Professional with 18+ years' international experience (Egypt & KSA) in construction management and technical operations. Expertise spanning residential, industrial, stations, and landscape projects.
Qualified for Technical Office Manager, Commercial Manager and Deputy Manager positions.
Seeking a challenging role in a progressive organization where my expertise can be leveraged to achieve exceptional results in civil and construction engineering

Overview

19
19
years of professional experience

Work history

Tech. Manager

SSBC (MBL)
Jeddah, KSA
2025.03 - 2026.02
  • Project Name: Central Oceanarium by JCD – Jeddah-KSA
  • Main Contractor by MBL
  • Client & Consulted by JCD (90 Million SAR for Skeleton)
  • Landmark mega structure (25,000 m²) with 2 basements + 7 pavilions
  • Managed concrete works for complex structural elements including (Raft foundation 1.5m thickness, Structural Walls 1.5m width & Double-height columns and walls (up to 8.5m)
  • Utilized Doka formwork system for all concrete elements (rafts, walls, slabs, columns)
  • Implemented rebar construction using both epoxy-coated and black steel reinforcement

Tech. Office Manager

Concrete plus
Cairo, Egypt
2024.01 - 2025.02
  • Project Name: Cairo Gate by Emmar Misr - Zaid
  • Main Contractor by Concrete plus
  • Consulted by Archimid
  • This project consists of 143 Villas with infra & Landscape package.
  • Make all str concrete, internal & external finishes works for Villas.
  • Steel Str. works for building sax restaurant.
  • Landscape works (Irrigation, Pump room Tanks, Fountains, Plaza Area, Side walks – etc.)

Tech. office manager

Alexandria Construction (T.M.G)
New Capital, Egypt
2016.07 - 2023.12
  • Project Name: Ministries District Cluster 15A&16A - New Capital
  • Main Contractor by Alexandria Construction (T.M.G)
  • Consulted by Dar Al-Handasa
  • This project consists of Two Ministries each one have 2 building consist of 2 Basement, 1 Ground & 7 typical floors that ties together with bridge
  • All work had been done by preparing shoring formwork & scaffolding for all structure Elements (Raft, walls, columns &slabs).
  • Steel Str. works for building Arcades (2nd floors) & G building Bridge (6th-7th & roof floor)
  • Landscape works (Irrigation, Pump room Tanks, Fountains, Plaza Area, Side walks – etc.)
  • Project Name: Knowledge city Project– New Capital
  • Main Contractor by Alexandria Construction (T.M.G)
  • Consulted by ECG
  • Project Fences, Gates, Geotechnical works & Landscape works
  • Project Name: Ministries District Services (SI04) Project– New Capital
  • Main Contractor by Alexandria Construction (T.M.G)
  • Consulted by Moharram Bakhom
  • This project consists of Mall, Police Station, Mosque & Ambulance
  • Str & Arch items for Buildings and Landscape
  • Project Name: CELIA Sales Tent– New Capital
  • Main Contractor by Alexandria Construction (T.M.G)
  • This project consists of Utility building, Sales Tent, Fountains, Fences & Gates
  • Str & Arch items for Buildings and Landscape

Senior Technical office Engineer

Saudi Bin Ladin Group (S.B.G)
Makkah
2015.06 - 2016.06
  • Project Name: Abraj Kudai – Makkah
  • Consulted by Dar Al-Handasa
  • Client: Saudi Ministry of Finance
  • This project is Mega structure consists of 12 high rising Towers (50&80 floors) this Towers planned to be the biggest hotel in the world.
  • Work done by using Doka formwork system (Raft, wall, Slab & Columns) specially Cores done by hydraulic system & using coupler connection system for steel.

Saudi Bin Ladin Group (S.B.G)
Makkah
2014.06 - 2015.06
  • Project Name: Security Building Plot 2 - Makkah
  • Consulted by Dar Al-Handasa
  • Client: Saudi Ministry of Finance
  • This project is related to 3rd expansion of Holly Haram Project and consists of security tower (25 floors) this Tower one of four towers around new expansion.

Saudi Bin Ladin Group (S.B.G)
Makkah
2012.08 - 2014.06
  • Project Name: Haramain High Speed Railway (Makah Station)
  • Consulted by Dar Al-Handasa
  • Client: Saudi Railways Organization
  • This project links the holy cities of Makkah and Madinah via Jeddah & King Abdullah Economic City consists of two terminus & two through station.
  • The station includes different zones as short, long stay car park, basement, concourse & platform.
  • All work had been done by preparing PERI & GHI shoring & scaffolding for all structure Elements (Foundations, walls, columns & slabs).
  • Basement columns & slab had been cast using white concrete.

Site Operator Engineer

Saudi Bin Ladin Group (S.B.G)
Makkah
2011.06 - 2012.08
  • Project Name: Central Utility Complex (C.U.C) – Makkah
  • Consulted by Dar Al-Handasa
  • Client: Saudi Ministry of Finance
  • This project is related to 3rd expansion of Holly Haram Project and consists of different buildings as generator, chiller, office area & fire fighting.
  • All work had been done by preparing GHI shoring & scaffolding for all structure Elements (Raft, walls, columns & slabs).
  • Including water tank works.

Scaffolding and formwork engineer

Arab Contractor Company
2011.01 - 2011.06
  • Scaffolding and formwork engineer at construction and specialized works sector in the Arab Contractor Company.

Site engineer

Arab Cont. Company
Cairo
2010.01 - 2011.01
  • Project Name: Panorama green mountain Residence – Cairo
  • Main contractor by Arab Cont. Company
  • Consulted by Moharram Bakhom
  • Client: the Arab contractors for investments (355 Million EGP)

Site engineer

Arab Cont. Company
Cairo
2008.11 - 2010.01
  • Project Name: Contract No. 16/2 (Waste water treatment plant) in El-Gabal El-Asfar - Cairo
  • Main contractor by Arab Cont. Company
  • Consulted by Degrament and ACE (Mohram Bakhom)
  • Client: Egyptian Ministry of Irrigation (500 Million EGP)
  • This project is Mega waste water treatment consists of different zones as (Screening, primary sedimentation tank (PST), distribution tanks, Aeration tank, final clarifier tank (FCT), Chlorine tank & Official buildings)
  • All work had been done by preparing PERI shoring & scaffolding for all structure Elements (Raft, walls, columns & slabs). Including water tank works.

Site engineer

Arab Cont. Company
6th October city
2007.08 - 2008.11
  • Project Name: House Family governmental project to youth housing - 6th October city
  • Main contractor by Arab Cont. Company
  • Consulted by ACE (Mohram Bakhom)
  • Client: Egyptian Ministry of Housing
  • This project is housing project which consist of 8 areas. Project includes 5 construction systems (concrete walls, bearing walls, cafore, flat slab and traditional system).

Education

B.Sc. - Civil Engineering

Zagazig University
Egypt
/2002 - /2007

Skills

  • Language skills:
  • Arabic: Native Language
  • English: Good (B2 Level) - Good written and verbal communication skills
  • Computer skills:
  • AutoCAD (2D & 3D)
  • ASD (Str Detailing)
  • Autodesk Revit (BIM)
  • Microsoft Office Suite (Word, Excel, PowerPoint, Outlook)
  • Oddo & Unifire software
  • Time and deadline management
  • Decision-Making confidence

General Information

  • Date of Birth: 2/4/1985
  • Nationality: Egyptian
  • Marital status: Married
  • Phone No.: 0546933772 & +201007927131
  • Email address: ahmed.gadd85@gmail.com
  • Address: Alshrouk District - KAEC - KSA

Personal Skills

  • Leadership & Collaboration
  • Rapid Learning & Adaptability
  • Resilience Under Pressure
  • PMP Certification
  • Organizational Management

Work Skills

  • I have the ability to:
  • 1- Managed procurement and project documentation via Odoo & Unifire, handling POs, invoices, and tracking all technical/commercial submissions.
  • 2- Managing the full lifecycle of tender submissions, from analysis to delivery of both technical and commercial proposals.
  • 3- Negotiating & contracting with subcontractors while ensuring their terms are fully aligned with the main client contract.
  • 4- Cash flow management (Prepare interim payment applications, Certificate Managing payments to subcontractors and suppliers).
  • 5- Claims management (Prepare VOs, Escalation, Addendum & Contract Amendments).
  • 6- Coordinate between different departments & Easley handle many technical issues.
  • 7- Submit perfect technical support to Site.
  • 8- Monitoring & controlling material store & steel workshop.
  • 9- Prepare all project technical submissions (PQ, MS, MAT, MIR, SCR, RFI…etc).
  • 10- Prepare different Shop Dwg, As-built Dwg.
  • 11- Make quantities survey (Q.S) for all project elements.
  • 12- Prepare project reports (daily, weekly & monthly).
  • 13- Plan general work layout.
  • 14- Create time schedules.
  • 15- Check different works for consultant approval.
  • 16- Prepare shoring and scaffolding drawings for site erection & carry out different shoring and scaffolding works at site.

Languages

Arabic
Native
English
Upper intermediate (B2)
German
Elementary (A2)

Affiliations

  • Running & Hand ball

Timeline

Tech. Manager

SSBC (MBL)
2025.03 - 2026.02

Tech. Office Manager

Concrete plus
2024.01 - 2025.02

Tech. office manager

Alexandria Construction (T.M.G)
2016.07 - 2023.12

Senior Technical office Engineer

Saudi Bin Ladin Group (S.B.G)
2015.06 - 2016.06

Saudi Bin Ladin Group (S.B.G)
2014.06 - 2015.06

Saudi Bin Ladin Group (S.B.G)
2012.08 - 2014.06

Site Operator Engineer

Saudi Bin Ladin Group (S.B.G)
2011.06 - 2012.08

Scaffolding and formwork engineer

Arab Contractor Company
2011.01 - 2011.06

Site engineer

Arab Cont. Company
2010.01 - 2011.01

Site engineer

Arab Cont. Company
2008.11 - 2010.01

Site engineer

Arab Cont. Company
2007.08 - 2008.11

B.Sc. - Civil Engineering

Zagazig University
/2002 - /2007
Ahmed Mohamed Gad