Civil Engineer with over 15 years of experience in various fields, including Forensic Delay Analysis, Claim Preparation, Project Control, Planning, Scheduling, Project Management, Construction, and Infrastructure. I have developed a specialized expertise in Project Control, Delay Analysis, Claims, and Contracts. My professional skills are particularly strong in planning and scheduling software, and I have extensive experience in utilizing these tools. I am also highly skilled in preparing management presentations and reports, showcasing my ability to effectively communicate project information and status. Cost control is another area of my expertise, where I have a proven track record of managing project budget, expenses and optimizing costs. Additionally, I am familiar with Quantity Surveying and Shop Drawing processes, allowing me to contribute effectively in these areas. Throughout my career, I have gained significant experience in construction field operations and site management, successfully overseeing multiple projects concurrently.
Project Diriyah Square — Package 1C, Western Ring Road Gyratory / Tunnels Under WRR
Contract Value : 1.2 billion SAR
Project Scope :
The Package 1C comprises concrete structural works for a gyratory, utility and carriageway tunnels. These tunnels are located in various positions around WRR.
The scope also includes construction of a “Hero's Deck Bridge” that is located over an existing structure, as well as MEP works required to reinstate existing WRR to its original condition. Furthermore, there are additional MEP works that are embedded within concrete structure inside tunnels adding further complexity to scope.
Responsibilities
Manage and follow up planning team and ensuring all Reports deliver in time and with the required quality.
Project: Appointed for All company project "Managed over 50 Projects"
Project : Modernization of Signalling System (Technical Building)
Project: Appointed on All company projects
Project : Modernization of Signalling System (Technical Building)
Project : NWC Water Projects Jeddah, Al Swaed, Quiza, Hanaky water Project.
Dammam and Makkah Silos Project:
Managing, Supervising and review all shop drawing and monitor activities on site including:
Working at following Projects:
✓ AL- Ayaat Water Station Project "102000 m3/day"
✓ AL-Amerya Technology College Project
✓ Military Factory 81th Project
✓ Qaliob Sanitary project (Infrastructure Sewer Project)
Duties and Responsibility:
Engineering Skills
Computer Skills