Overview
Work History
Education
Skills
Websites
Personal Information
Timeline
Generic

Ahmed Sallam

Overview

16
16
years of professional experience

Work History

Civil Technical Support Engineer

Dorsch Holding Company
08.2023 - Current
  • Preparing RFP Design – Bid – Build / or / Design and Build.
  • Preparing BOQ, QTO, Cost Estimate, Breakdown, Method of Measurements, for + 500 projects, within portfolio NWC Budget.
  • Reviewing Design with the Value Engineering team.
  • Coordinating with internal and external stakeholders.
  • Revising Contractor Invoices / Variation order.

Senior Civil Technical Support Engineer

AAW & Partners Consulting Engineers
12.2019 - 07.2023
  • Design Review for Urgent project in Makkah city (36 Sewer, 47 water).
  • Design Review for 3Rd Ring Water transmission lines (2 Phases).
  • Design Review for (18-C-1) 4th Ring Water transmission Makkah city.
  • Design Review for Projects Coastal cities in Jeddah (18 Sewer, 1 water).
  • Submit & Revising RFP Package, BOQ, QTO, Cost Estimate (72 Sewer, 35 water).
  • Preparing the RFP package for the local master plan, urgent projects in Makkah (36 Sewer, 47 water).
  • Revising the Capital investment plan project & Hydraulic model (Sewer, water) Existing & future & GIS (Sewer, water) Existing & future.

Senior Quantity Surveyor & Cost Estimator

AAW & Partners Consulting Engineers
01.2020 - 05.2020
  • Preparing & Submitting addendums on IFB documents (Form of Proposal, MTO, Pay item Description, Cost Estimate…) according to Master format.
  • Royal commission Jubail

Civil Technical Manager Engineer

Salem Saleh Alharth
01.2018 - 11.2019
  • Revising and Preparing shop Drawing (Gravity network & Pressure lines & pumps stations) & submitting shop.
  • Managing with site co-workers the material stock to resupply.
  • Identify the limit of wastage percent.
  • Preparing & submitting the updated BOQ according to the Shop drawings.
  • Preparing Actual Cost breakdown, submitting monthly invoices, Taking off Quantities.
  • Preparing Method of statements of implementation.
  • Solve Site clashes with other utilities.
  • Submitting the schedule (quarterly update, manpower, equipment histogram).
  • Monthly Reporting the (Schedule Variance, Cost Variance).
  • Preparing Update schedule baseline.
  • Monitoring productivity rates on sites and submitting reports for management.

Civil Technical Support Engineer

Abdul Allah Abdul Mohsen Al-Khodari Company
12.2010 - 12.2017
  • Prepared Various types of tenders Proposals (Lift station, Gravity lines (sewer, storm), Water (Main lines & Transmission lines, STP, RO, WTP, Reservoirs, Elevated tanks, Construction buildings “various types of uses” … etc.)
  • Preparing Estimating & Valuations for BOQ (Material, Manpower, and Equipment).
  • Preparing Budget summary for Project proposal.
  • Getting Quotation for different suppliers.
  • Create a pricing database of the common and some rare items.
  • Risk Analysis.
  • Negotiations with subcontractors.
  • Carrying out site visits and surveys.
  • Carrying out Variation Orders & Updating documents & Submitting EOT.
  • Submitting finalized budget with other departments.
  • Recording prices as price list in the sequence of Master list standard.
  • Al-Khobar

Site Engineer

Dar WA Emaar
12.2010 - 12.2017
  • For Groups of Villas in Al-MOROOJ 12 VILLA and Villas in Al-DOHA 26 VILLA.
  • Supervising Projects: including in-house sub-contractors.
  • Setting out Project works in accordance with Drawings & specifications.
  • Revising Quantities Takeoff, Subcontractor Invoices.
  • Revising in design stage Structure analysis.

Civil Technical Support Engineer

FAROK ABD AL_WAHAB COMPANY
08.2009 - 01.2010
  • Preparing shop drawings, client monthly presentations, and Variation orders.
  • Matching the As-built drawing with the tender.
  • Cairo, Egypt

Education

Civil Engineering - undefined

Benha University
09.2009

Skills

  • 3D Civil
  • AutoCAD
  • Rivet
  • SAP
  • Primavera
  • Communication Management
  • Problem-solving
  • GIS
  • CANDY ESTIMATE & EVALUATION PROGRAM
  • Office programs
  • Project management
  • Sewer gems
  • Water gems
  • Planning and Scheduling
  • Cost Control

Personal Information

Title: Senior Cost Estimator Engineer

Timeline

Civil Technical Support Engineer

Dorsch Holding Company
08.2023 - Current

Senior Quantity Surveyor & Cost Estimator

AAW & Partners Consulting Engineers
01.2020 - 05.2020

Senior Civil Technical Support Engineer

AAW & Partners Consulting Engineers
12.2019 - 07.2023

Civil Technical Manager Engineer

Salem Saleh Alharth
01.2018 - 11.2019

Civil Technical Support Engineer

Abdul Allah Abdul Mohsen Al-Khodari Company
12.2010 - 12.2017

Site Engineer

Dar WA Emaar
12.2010 - 12.2017

Civil Technical Support Engineer

FAROK ABD AL_WAHAB COMPANY
08.2009 - 01.2010

Civil Engineering - undefined

Benha University
Ahmed Sallam