Summary
Overview
Work history
Education
Skills
Certification
Languages
Accomplishments
Timeline
ProjectManager
Ahmed Hussein  Abdallah

Ahmed Hussein Abdallah

Tabuk, Olaya, ,Egypt

Summary

Hardworking service management professional with extensive experience in project mangement and leadership. Skilled in business planning and organisation to maintain smooth daily operations. Leads by example to motivate high-achieving, dedicated service teams.

Overview

19
19
years of professional experience
5
5
years of post-secondary education
1
1
Certification

Work history

Project manager

civil works company
Al Hufuf, Eastern Province
01.2008 - Current
  • Civil Works company to operate and maintain sewage plants and water in Saudi Arabia
  • Description:
  • Operation and maintenance of all types of plants and water and sewage pumping stations and sewage treatment
  • Responsibilities that the company has hired me as follows:
  • Rehabilitation and repair stations clean drinking water
  • Follow safety procedures and safety tools for different sections
  • Working as a project manager for water operation and maintenance at various stages, including production wells, tanks, and distribution networks for citizens
  • Preparing and reviewing preventive and corrective maintenance plans, work orders, and work permits to complete maintenance plans with the highest performance rate
  • Achieving performance indicators (K.P.I) to ensure saving energy and water consumption
  • Preparing a standard operating procedure plan (SOP) for all stations in the project
  • Work on the operation and maintenance of plants and water wells, Alhassa, The project contains a main pumping station in the Abu Ghanimia area, consisting of two separate stations, each station with a ground water tank of 120,000 cubic meters with their own lifting pumps, whose flow rate reaches 1200 liters / second and thus covers the needs of the Alhassa region
  • Rehabilitation and repair of lift stations
  • Rehabilitation of sewage treatment plants
  • The action and implementation of drinking water lines
  • Action and implementation of waste water networks
  • Work on the operation and maintenance of plants and water wells, AL-HAhsa
  • For example: -
  • Maintenance of submersible water pumps and motor, Grundfos - k.s.b - Hayward - Hitachi)
  • Acted as single point of contact for stakeholders.
  • Devised activity and service plans to meet customer requirements.
  • Facilitated communication and collaboration across departments.
  • Maintained excellent health and safety standards for continued compliance.
  • Organised continuous facilities cleaning, minimising risk and maintaining professional appearance.
  • Forged working relationships with suppliers and negotiated purchasing conditions.
  • Kept appropriate stock levels to meet operational needs.
  • Executed data-driven sales and marketing strategies to boost revenue.
  • Tracked expenses and business outgoings to remain within cashflow targets.

Mechanical engineer

Eco - Tec
Dimiatt, Egypt
07.2006 - 05.2008
  • Eco-tec company to operate and maintain sewage plants and water
  • Description:
  • Operation and maintenance of all types of plants and water and sewage pumping stations and sewage treatment
  • Rehabilitation and repair stations clean drinking water
  • Follow safety procedures and safety tools for different sections
  • Maintaining hydraulic pumps and reviewing all hydraulic cycles
  • Applying safety first with its various rules (5s)
  • Rehabilitation and repair of lift stations.
  • Rehabilitation of sewage treatment plants
  • Operation and maintenance of the treatment plant to the bilateral sewage with capacity of 60,000 cubic meters
  • Collaborated with engineering team to complete projects.
  • Specified system components and directed product modifications for conformance with engineering design and performance specifications.
  • Built complete system designs for [Type] applications using accurate data and iterative processes.
  • Applied mechanical knowledge to optimise equipment components for durability, cost, or ease of production.

Mechanical engineer

Factory for the manufacture of packaging machines
6th of October City, Egypt
01.2005 - 05.2006
  • factory for the manufacture of packaging machines in 6th of October City
  • Helped manufacturing teams resolve issues during transition from design phase through ongoing production.
  • Worked with SolidWorks and AutoCAD to draft assemblies, models and technical drawings.
  • Developed mechanical product prototype components, assemblies and tooling.
  • Applied mechanical knowledge to optimise equipment components for durability, cost, or ease of production.
  • Inspected completed equipment for compliance with codes, design specifications and quality standards.
  • Description:
  • The factory produces all kinds of manufactures all types of packaging machines
  • Responsibilities that the factory has hired me as follows:
  • Sort and Production supervision
  • Calculating production costs
  • Maintenance air condition(chiller and pumps inside the system)

Education

Engineer's degree - Mechanical Dept.

El-Mansoura
Egypt
09.1999 - 06.2004

B.Sc - Engineering, Mechanical

Mansourah University

Skills

  • Computer skills:
  • Good user for
  • Windows and MS office (Word - Excel-…etc)
  • Good user for internet applications
  • Good user for CAD programs (AutoCAD)
  • Good user for statistical software package
  • Other skills:
  • Project planning and development
  • Analyzing and describing problems, collecting their algorithms, and proposing the optimal solution
  • Good relation with universities stuff
  • Organizing and supervising meeting, seminars, conferences, workshops and training courses
  • Staff Management
  • Project Management
  • Analytical problem solving
  • Business process re-engineering

Certification

Attended the training course in ISO 9000 and Q.S. 9000 Cairo. Attended the training course in hydrogen sulifide (H2S) Training by centre (HATC)Saudi arabiaLanguages

Languages

English
Intermediate
Arabic
Fluent

Accomplishments

  • Completed the [Operation and maintenance of water in Al-Ahsa] Project on time and SR[60000000] under budget.
  • Improved customer satisfaction ratings by 85% by Service Quality Improved.
  • Completed the [operating and maintaining rain stations and networks in Al-Hofuf and Al-Mubarraz] Project on time and S.R 35000000 under budget.
  • Achieved [Profit] through effectively helping with project management].


Timeline

Project manager

civil works company
01.2008 - Current

Mechanical engineer

Eco - Tec
07.2006 - 05.2008

Mechanical engineer

Factory for the manufacture of packaging machines
01.2005 - 05.2006

Engineer's degree - Mechanical Dept.

El-Mansoura
09.1999 - 06.2004

B.Sc - Engineering, Mechanical

Mansourah University
Ahmed Hussein Abdallah