Under Following Project Completed with Al Bawani Co Ltd.
- King Faisal Hospital Takhasusi - Riyadh
- Arga Palace Clinic - Riyadh
- Driya Place - Riyadh
- Private Palace -Sharma Tabuk
- Alfa Dewan- Riyadh
- Mina Place - Macca
- Private Aviation , Private Terminal- Riyadh
- Neom Hospital - Sharma Neom
Responsibilities:
- Checked design compliance with project specifications and standards requirements.
- Review, planned and directed System installation of HVAC, plumbing , Fire Fighting , Medical Gas , Pneumatic Tube and Reverse Osmosis other mechanical systems.
- Suggested cost saving proposals on make-versus-buy analysis or alternative sourcing.
- Communicated project requirements and areas for improvement in design review meetings.
- Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
- Checked design compliance with product specifications and standards requirements.
- Designed, planned and directed upgrades to HVAC, plumbing and other mechanical systems.
- Created parts for machining, sheet metal fabrication and injection molding.
- Managed construction administration and value engineering processes.
- Follow up Daily Progress , and Quality of Work
- Assign target to Colleagues Engineers, Supervisors
- Assisted drafters in developing Mechanical of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software.
- Utilized job-related software to produce outline designs.