Summary
Overview
Work History
Education
Skills
Electrical & Computer Hardware Engineer
Certification
Timeline
Ali  Raza

Ali Raza

Team Leader

Summary

PROFESSIONAL SUMARY


More Than 7 Years In Railway Industry Only In Signaling Equipments, Rolling Stock and stations . Experienced Team Leader and Senior Maintenance Engineer with a demonstrated history of working in the railroad manufacture industry. Skilled in Building Maintenance, Electrical Troubleshooting, Maintenance & Repair, Maintenance, Installation , Testing and Commissioning and Troubleshooting. Strong operations And Installation.

Professional back ground With 7 Years Experience In Railway Industry.

Love To Work In Different System And Environment To Explore More Hidden Talent Inside Myself. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

7
7
years of professional experience
7
7
Certifications

Work History

TEAM LEADER

Xrail
HERMAIN HIGH SPEED RAILWAY MADINAH
11.2022 - Current
  • Responsible for all preventive and corrective actions for all equipment on stations and track.
  • Weekly and Monthly progress meeting with client.
  • Make sure all preventive activities are going as per plan.
  • Make sure all corrective actions inside building, on track and on stations are done in given time frame.
  • Established open and professional relationships with team members to achieve quick resolutions for various issues.
  • Built strong relationships with main contractor through positive attitude and attentive response.
  • Mentored and guided employees to foster proper completion of assigned duties.
  • Worked with team to identify areas of improvement and devised solutions based on findings.
  • Communicated KPIs outlined in annual plan to inform employees of expectations and deliverables.
  • Reviewed, implemented and updated company records related to team activities for future reference.
  • Held weekly team meetings to inform team members on company news and updates.
  • Developed and updated tracking spreadsheets for process monitoring and reporting.
  • Generated reports detailing findings and recommendations.

SENIOR MAINTENANCE ENGINEER

Xrail
HERMAIN HIGH SPEED RAILWAY MADINAH
11.2019 - 11.2022
  • Carrying out real time troubleshooting of faults on System software's, railway station,Technical buildings & track side.
    Working on the communication Computers i.e. LOC, LEC, GDI, ICE A, ICE B, JRU, JRUR, MAS &MASR.
  • Responsible for BOCC (Backup Operating Control Center) which involve working on CFE(Communication Front End), GIS (Graphic Interface Server), HMI, EIS & IIS Server, CTC Server, CEC Server, MAS-C.
  • Coordinate with the Client regarding daily faults & it's updates.
  • Preparing daily shift reports, incident reports and maintain maintenance records of all activities.
  • Responsible for inventory & spare parts management. Preparing & updating replenishment reports.
  • Responsible for the preventive & corrective maintenance of all equipments on stations including sign boards, schedule boards, direction board, lights, decorated lights, announcements, help desk.
  • Responsible for the preventive & corrective maintenance of point machines (Thales L826H). Point machines maintenance includes adjustments of the detection bars, installation, changing oil,replacement of the terminal boards inside point machine, air removal, Greasing etc.
  • Responsible for the P & C maintenance of Thales axle ZP 30H and Siemens axle counters installed ontrack side.
  • Responsible for the P & C maintenance of track side signals. Signal maintenance includes adjustments of the voltage and current values for the different aspects, installation, repairing or replacement of the faulty component.
  • Responsible for P & C maintenance of Eurobalise & performed programming through TPG.
  • Responsible for the Preventive & Corrective maintenance for the following cubicles,
    Westrace 2.0 cubicle
    RBC (Radio Block Centre) Cubicle
    ACE (Axle Counter Evaluator) Cubicle
    PDC (Power Distribution Cubicle)
    Auxiliary Cubicle
    Communication Cubicle
    Cable Rack
  • Cleaned and lubricated parts to keep equipment operating at peak performance.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.

INSTALLATION SUPERVISOR

Alstom
RIYADH METRO LINE 4, 5 ,6
11.2016 - 10.2019
  • Supervise the fiber optics cable termination and testing (single mode, multi mode, 1 core, 2 core, 4 core, 32 core) on stations for sign boards, help desk, direction boards, schedule boards, between signalling rooms, between the OCC and other buildings.
  • Supervise the coper cable termination (2 pair, 4 pair,16 pair, 28 pair, 3 core, 2 core, power cable, 1 quad, 4quad, 7 quad) between track and signaling room for every equipments (signal, point machine, axle counter). On stations for sign boards, help desk, direction boards, schedule boards.
  • Mechanical fixation and termination of all equipment on stations (lights, sign board, help desk, schedule board, direction board etc)
  • Mechanical fixation and termination of track side equipments (point machine, beacon, shunting signal,axle counter).
  • Supervise the cable laying, grounding.
  • Supervise the Sensor installation.
  • Supervise the termination of cables according to the drawing.
  • Do the cable continuity test of cables for fiber optics and coper cable.
  • Make the ITR (Inspection test report) reports of all the cables, equipments on track and in stations.
  • Prepare all the documents necessary for site.
  • Attend weekly and monthly meeting with client.
  • Supervise the Cable termination according to the drawing.
  • Completed visits before, during and after installations to assess quality and performance.
  • Coordinated materials warehouse person, documentation and testing for installations.
  • Scheduled timelines of operations and work teams.
  • Oversaw internal, external and consultant work related to installations.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Managed efficient teams of up to 40 employees.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Created and maintained daily and weekly reports for upper management.

ROLLING STOCK ENGINEER

2A GROUP
JAMEAH NORA UNIVERSITY METRO RIYADH
05.2016 - 11.2016
  • Resolved problems, improved operations and provided exceptional service.
  • Demonstrated strong organizational and time management skills while managing multiple projects.
  • Paid attention to detail while completing assignments.
  • Skilled at working independently and collaboratively in a team environment.
  • Learned and adapted quickly to new technology and software applications.
  • performing several tasks of preventive maintenance in all sub-system of the train bogie,tractionbox,auxiliary converter,battery box,brakes,Air generation unit,Hvac,doors,gangway,automatic and semipermanent couplers.
  • dynamic storage activities taking mileage,downloading logs and events,driving the train.
  • troubleshooting of all subsystems of the train, Train Control and Monitoring System,Public Announcements and Public Information System and CCTV,traction and brake system,Hvac,doors,
    Event recorder,data communication system TCMS and ATC.
  • Perform software updates and troubleshooting.
  • Operation Control center support by analyzing all Incorrect output Status on DDU

Education

Bachelor of Science - Computer Engineering

UNIVERSITY OF ENGINEERING AND TECHNOLOGY LAHORE, LAHORE, PAKISTAN
08.2012 - 2016.05

Skills

    Maintenance Management

undefined

Electrical & Computer Hardware Engineer

This is computer engineering which includes hardware development and software development.

Certification

Electrical & Computer Hardware Engineer

Timeline

Hermain HSR and signalling introduction

11-2023

Haramain HSR signals

11-2023

Haramain HSR Westrace 2.0 interlocking

11-2023

Haramain HSR ERTMS L2

11-2023

Haramain HSR L826H PM

11-2023

Haramain HSR AZ LM axle counters with Zp30H

11-2023
TEAM LEADER - Xrail
11.2022 - Current
SENIOR MAINTENANCE ENGINEER - Xrail
11.2019 - 11.2022

Electrical & Computer Hardware Engineer

10-2019
INSTALLATION SUPERVISOR - Alstom
11.2016 - 10.2019
ROLLING STOCK ENGINEER - 2A GROUP
05.2016 - 11.2016
UNIVERSITY OF ENGINEERING AND TECHNOLOGY LAHORE - Bachelor of Science, Computer Engineering
08.2012 - 2016.05
Ali RazaTeam Leader