A self-result driven, self-motivated, proactive and well experienced Senior Civil Engineer with an in-depth understanding in a line of Construction and Project Management. Well presented with excellent communication skills and having a commercial approach to solving a problem. Hands-on and always wanting to be actively involved in all aspect of the project life cycle to assist in ensuring the safety during project execution, deliver to the highest quality, within budget and be completed on time. Having a strong leadership with a proven track record of thriving under pressure and pursue new challenging situations. Looking forward for making a significant contribution with a prestigious company that offers opportunities of progression. Over 30 years of total professional experienced in Construction and Project Management. With extensive experienced in infrastructure projects such as Metro Rail, Expressway, Interchange, Roads, Bridges. Experienced in Construction of High & Medium Rise Buildings, Site Development, Landscaping, Drainage System, Intelligent Traffic Systems (ITS) and Sewage Treatment Plant (STP). A licensed Civil Engineer with master's degree in construction management, accredited Materials Engineer, registered member of Philippine Institute of Civil Engineers (PICE) and Saudi Council of Engineers (SCE).
Overview
32
32
years of professional experience
Work History
ASSISTANT RESIDENT ENGINEER
SYSTRA
Riyadh
08.2014 - Current
Company Overview: www.systra.com
Lead and provide technical guidance to a multidisciplinary team of inspectors during the inspection of work such as diversion of affected utilities along the alignment, construction of piers & pier heads, erection of viaduct using launching girders (LG), construction of elevated stations, landscaping, reconstruction of roads and Intelligent Traffic Systems (ITS)
Assist the Resident Engineer (RE) in overseeing the construction activities and ensuring compliance with project specifications, drawings, and contract documents
Collaborate with Resident Engineer to eliminate any hazards associated with the work that may adversely affect the environment, safety and health of employees
Ensures to maintain the safe work practices in compliance with the site-specific safety procedures
Ensures to maintain first-level quality assurance to confirm that an installation of all works within their discipline are in accordance with the plans and specifications
Review the design drawings, shop drawings, Method of Statements (MS), Inspection Test Plan (ITP) and materials approval as well as the Temporary Traffic Control Plan (TTCP), ensures that these are already approved prior to commencing of works
Lead the construction inspectors, ensures that the tests and inspections are performed, witnessed and documented in accordance with approved procedures
Ensures to raise a Non-Conformance Report (NCR) to the Contractor for every defective works and non-compliance of an approved documents as required prior to commencing of works
Lead the review of as built drawings and checking of changes from the previous approved shop drawing and ensure that Field Change Request (FCR) were submitted with an approved by designer
PROJECT MANAGER
MAKATI DEVELOPMENT CORPORATION
Metro Manila
07.2012 - 08.2014
Company Overview: www.mdc.com.ph
Manage and control the overall construction of the project to ensure the safety, expected quality, projected budget and to follow the approved construction schedule
Manage to a multidisciplinary team of engineers and inspectors in varying field of expertise
Prepare project execution plan of the project and construction schedule with cash flow and S-curve
Ensures to follow the approved design drawings and specifications during implementation by sub-contractor
Assess and monitor the performance of the sub-contractors and ensure to follow the industry standard
Attend weekly Project Technical Group (PTG) meeting with project proponent and consultants to update the issues and discuss the deliverable in the project
Conduct and preside over the weekly Construction Coordination Meeting (CCM) and follow up meeting with sub-contractors to resolve the various issues and concerns in the project
Address critical issues that may arise during the construction
Prepare correspondences and minutes of the meeting
Lead the team during pre-bid for sub-contractors and suppliers
Evaluate the performance of the staff
PROJECT MANAGER
ESCA INCORPORATED
Metro Manila
11.2005 - 07.2012
Company Overview: www.escaengineers.com
Manage and control the overall construction of the project to ensure the safety, expected quality, projected budget and to follow the approved construction schedule
Manage to a multidisciplinary team of engineers and inspectors in varying field of expertise
Prepare general construction schedule as consolidated schedules from main contractor and trade contractors
Ensures to follow an approved Method Statement (MS), Inspection Test Plan (ITP), Design Drawings and Specifications during the implementation by main contractor and trade contractors (e.g
Structural, Architectural, Mechanical, Electrical, Plumbing and Fire Protection)
Implement the systems and procedures of the proper management of the project
Assess the performance of the main contractor and trade contractors
Address potential issues that may arise during the construction
Lead the preparation of bid documents and evaluation of submitted financial and technical bids from bidders
Prepare bid recommendations to the owner prior the final negotiation to bidders
Assist to Owner for awarding of contract to winning bidders for Contract packages
Conduct and preside over the weekly Project Technical Group (PTG) meeting and other important meetings
Update and report regularly to Vice President for Operation about the status of the project
PROJECT MANAGER
TOLEDO CONSTRUCTION CORPORATION
Metro Manila
09.2002 - 11.2005
Company Overview: www.tcc.com.ph
In-charge in construction and rehabilitation of pavement and drainage line
Coordinate with QC Engineer for the sampling of concrete, coring and Field Density Testing (FDT)
Coordinate with survey team for checking of elevations and alignments
Coordinate with project consultant for inspection of work
Prepare daily and weekly accomplishment reports
Prepare weekly and monthly look ahead work schedule
Monitor the work accomplishments based on construction schedule
Attend weekly coordination and safety meeting at the site.
FIELD ENGINEER
HANJIN HEAVY INDUSTRIES & CONST. CO. LTD.
Metro Manila
08.2000 - 09.2002
Company Overview: www.hhic-holdings.com
In-charge in bored piling operation, construction of piers and pier heads
In-charge in erection of viaduct using Launching Girder (LG) and post tensioning
Issue Site Instructions (SI) to sub-contractor
Prepare weekly work schedule and Request for Information (RFI)
Coordinate with survey team for the checking of alignments, and elevations
Coordinate with QC Engineers and Project Inspectors for Inspection of work
Prepare and submit the daily and accomplishment reports
Attend weekly coordination and safety meeting at the site
PROJECT ENGINEER
FF CRUZ & CO. INC.
Metro Manila
06.1998 - 08.2000
Company Overview: www.ffcruz.com.ph
In-charge in bored piling operation, construction of piers, pier heads, erection of AASTO girders and construction of deck slab
In-charge in micro piling works operation, construction of pile coping beam, construction of slab, sidewalk and retaining walls
Issue Site Instruction (SI) to sub-contractor
Prepare Request for Information (RFI)
Coordinate with survey team for checking of alignment and elevations
Coordinate with QC Engineers and project inspector for the inspection of work
Prepares daily and weekly accomplishment reports
Attend weekly coordination and safety meeting at the site
SITE ENGINEER
PT HUTAMA KARYA
Metro Manila
07.1996 - 05.1998
Company Overview: www.hutamakarya.com
In-charge in bored piling operation, construction of piers and pier heads and deck slabs
Coordinate with survey team for the checking of alignments, and elevations
Issue Site Instructions (SI) to sub-contractors
Coordinate with QC Engineers and Project Inspectors for Inspection of work
Ensures to follow the construction schedule, approved plans and specifications
Conduct site verification of accomplishment and change orders (CO) claims of sub-contractor
Prepare daily and weekly accomplishment report
Attend weekly coordination and safety meeting at the site
FIELD ENGINEER
FILSYSTEMS INC. (FF CRUZ JR.)
Metro Manila
05.1993 - 06.1996
Company Overview: www.filsystemsjr.com
In-charge in structural works such as formworks, installation of reinforcing steel bars and concreting
In-charge in masonry works, tile works, and painting works
Prepare quantity take off and cost estimates
Monitor the accomplishment based on construction schedule
Coordinate with project inspector for the inspection of work
Ensures to follow the approved plans and specifications
Attend weekly coordination and safety meeting at site
Prepares daily accomplishment report and weekly schedule
Education
Master of Science - Construction Management
Polytechnic University of The Philippines
10.2010
Bachelor of Science - Civil Engineering
University of Sto. Tomas - Legazpi
03.1993
Skills
Quality assurance
Project scheduling
Safety compliance
Technical drawing review
Inspection coordination
Utility management
Contract administration
Cost control
Team leadership
Effective communication
Problem solving
Risk assessment
Stakeholder engagement
Time management
Proficiency in concrete construction
Quality control
Cost estimation
Budget administration
Team collaboration
Cost estimates
Engineering support
Materials testing
Construction management
Trainings And Seminars Attended
Project Construction Management Seminar, Architectural Centre Club, Makati City, 2008
Basic Occupational Safety and Health (BOSH) Training, Pasig City, 2011-2012
Quality Management Systems Awareness, Riyadh, Saudi Arabia, 2015
Environmental Safety, Health, and Risk Program (ESHARP) Workshop, Riyadh, Saudi Arabia, 2016
The Code of Ethics, Riyadh, Saudi Arabia, 2018
The Environmental Approach in Action, Riyadh, Saudi Arabia, 2020