Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic
AMIR TAIR

AMIR TAIR

MEP PROJECT MANAGER
ALKHOBAR,SAUDI ARABIA

Summary

MEP PROJECT MANAGER Accomplished construction projects leader (MEP ) ering over 18 years of experience at construction projects management. Driving to finishing mechanical projects with proven expertise in achieving projects safely ,on time and with the required quality level of clients

Overview

21
21
years of professional experience
5
5
years of post-secondary education

Work History

MECHANICAL CONSTRUCTION MANAGER (MEP )

Critical Engineering Company
Alkhobar, Saudi Arabia
08.2020 - Current
  • Control , monitoring and coordinating all erection , installation and test & commissioning activities
  • Preparing and submitting all work inspection test report (WIRs)
  • Reviewing construction procedure ( MS , testing , commissioning procedures )
  • Review and analysis all MEP drawing materials , schedules/program of work
  • Preparing weekly and monthly progress report
  • Preparing As built drawing
  • Day to day monitoring work and planning entire work
  • Identi cation of subcontractors and suppliers
  • Attending all testing and commissioning of MEP services
  • Monitored company inventory to keep stock levels and databases updated.
  • Devoted special emphasis to punctuality and worked to maintain outstanding attendance record.
  • Delivered services to customer locations within specific timeframes.
  • Worked within applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Exceeded goals through effective task prioritization and great work ethic.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Maintained energy and enthusiasm in fast-paced environment.
  • Received and processed stock into inventory management system.
  • Collaborated with team members to achieve target results.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Conducted research, gathered information from multiple sources and presented results.
  • Improved operations through consistent hard work and dedication.
  • Developed team communications and information for meetings.
  • Carried out day-to-day duties accurately and efficiently.
  • Handled 100 calls per day to address customer inquiries and concerns.
  • Prepared variety of different written communications, reports and documents.
  • Worked with customers to understand needs and provide excellent service.
  • Actively listened to customers' requests, confirming full understanding before addressing concerns.
  • Resolved problems, improved operations and provided exceptional service.
  • Saved $100000 by implementing cost-saving initiatives that addressed long-standing problems.

MEP Projects Manager ( HVAC , Firefighting , Plumb

NASSER ABDULLAH ALDUBAYYAN CO
Dammam, Saudi Arabia
07.2015 - 06.2020
  • Management all the faces of the projects
  • Ensure that project workforce are in the formalization of their respective procedures as de ned in the Project plan
  • Get a new project for the company
  • Choose all subcontractors according to the budget
  • Supervising on progress of projects
  • Interfacing with the client and consultant for solving any concerns
  • Delivering the projects as per clients requirements
  • King Abdulaziz Center for World Cultur (Ithra)
  • Jubail Industrial college
  • Royal Buildings hotels Sharma ( NEOM)
  • Ajyal Villas project at Dahran
  • Alula touriesm camp
  • National Guard Airport in Riyadh
  • Measured, threaded and cut materials to correct angles.
  • Installed valves, hangers, supports and flanges inside piping systems.
  • Provided emergency services to install and repair toilets, water heaters, appliances and showers to maintain [Number]% customer satisfaction ratings.
  • Interpreted blueprints to determine locations, quantities and sizes of materials required.
  • Filled pipe systems with water and air to determine location of leaks.
  • Inspected sewers and piping systems to assess quality and condition.
  • Complied with state plumbing codes throughout duration of each project.
  • Repaired plumbing systems, components and equipment.
  • Reviewed blueprints and project specifications to determine correct plumbing solutions.
  • Implemented maintenance and repair for fixtures, water mains, natural gas, fire systems and backflow preventers.
  • Managed job site hazards by accurately locating biohazards, low-grade radiation and chemicals.
  • Worked with certified pipe welders by providing accurate pipe preparation and fitting.
  • Prepared detailed records of all project tasks from start to finish.
  • Offered guidance and training to junior team members.
  • Independently worked on projects, while offering process coordination and cooperation with other teams.
  • Operated ground microphones and listening discs to locate hidden water line leaks.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Obtained precise results by performing accurate hydrotesting.
  • Inspected structures to avoid any obstruction and delays throughout project.
  • Secured rising mains and boiler piping to structural supports in new construction and remodeling projects.
  • Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
  • Expanded trade knowledge by networking with colleagues and participating in courses and seminars.
  • Trained and supervised all incoming employees.
  • Read blueprints to determine appropriate materials and procedures for each project.
  • Requisitioned tools and equipment to select type and size of pipes needed for projects.
  • Kept detailed job records using EXCEL SHEETS to maintain up-to-date filing system.

Projects Manager for ( Insulation ,Painting & PFP

ISAM KABBANI CONSTRUCTION CO
Dammam, Saudi Arabia
05.2011 - 06.2015
  • Scope of work
  • Carried Out Projects, for ( Insulation ,Painting ),
  • Scope of work
  • Carried Out Projects
  • Operated power sprayers and hand tools to prepare and paint large areas.
  • Painted surfaces using brushes, spray guns and paint rollers.
  • Protected surfaces from damage and spills by using drop cloths prior to and during painting.
  • Prepared surfaces and surrounding areas for painting using sandpaper, tape and other materials.
  • Prepared trim, walls and ceilings for painting by cleaning, smoothing and priming.
  • Moved painted items to drying racks and finished coated surfaces by baking painted items in oven.
  • Selected proper amount and type of thinners and accelerant to be used for specific jobs.
  • Bid on projects, prepped sites and completed projects in line with customer specifications and requirements.
  • Mixed and matched paints according to customer specifications.
  • Consulted with clients to discuss commission ideas and style preferences to create mutually agreeable project parameters.
  • Worked holidays and weekends depending on shifting needs of project.
  • Painted lines for parking lot stalls and safety lines on curves in road.
  • Climbed scaffolding, staging, ladders and planks to reach work area surfaces and observed safety protocols to prevent falls.
  • Painted indoor areas such as hallways, bathrooms and lobbies.
  • Obtained correct dimensions and specifications by properly measuring areas.
  • Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
  • Repaired wall holes and scrapes.
  • Applied putty, wood filler, spackling and caulks to prep uneven surfaces and fill in holes.
  • Calculated accurate amounts of materials and estimated time for planned jobs.
  • Interacted with clients to report progress and verify timetable for completed work.
  • Trained new staff on initial setup routines and continual work monitoring procedures.
  • Primed and sealed surfaces to best support paint coats.
  • Achieved optimal adherence by washing, treating and sanding surfaces.
  • Applied caulk, putty and plaster to walls using correct techniques to achieve professional finishes.
  • Performed regular preventive maintenance on tools and equipment to support best quality of work.
  • Corrected surface imperfections by filling cracks, holes and joints.
  • Applied paint with cloth, brush, sponge and fingers to create special effects.
  • Conducted final work check to assess quality and make corrections if necessary.

QA/QC Manager for ( Insulation ,Painting )

ISAM KABBANI CONSTRUCTION CO.
Dammam, Saudi Arabia
04.2007 - 05.2011
  • Scope of work
  • Management all the faces of the projects
  • Get a new project for the company
  • Choose all subcontractors according to the budget
  • Supervising on progress of projects
  • Interfacing with the client and consultant for solving any concerns
  • Delivering the projects as per clients requirements
  • Abo Ali Gas plant at Abo Ali jubail - maintenance ( Aramco )
  • Hadeed Factory extension - construction ( SABIC )
  • Ibn Sina plant - maintenance ( SABIC )
  • Khurasanya Gas Plant - construction ( Aramco )
  • Wasit Gas palnt - construction ( Aramco )
  • Yanbu Export Re nery - construction ( Aramco )
  • Yanbu power palnt (stage 3) - construction ( Aramco )
  • Petro Rabigh phase one ( petro rabigh )
  • Alkhafji joint Operation ( KJO)
  • Jubail Export Re nery ( Satrop )

Quality Engineering Manager

QUICK TEL
CAIRO, EGYPT
05.2005 - 04.2007
  • Preparing process plan for assy lines
  • Preparing working guide according to standards and speci cations
  • Preparing the inspection criteria and test plan as per standards
  • Follow up process capability
  • Led problem-solving activities to quickly identify and permanently resolve quality and productivity issues.
  • Developed traceability documentation to aid in investigating faults and defects.
  • Facilitated process improvements to successfully decrease errors.
  • Escalated concerns about project and process quality, referring discovered issues to engineering manager for correction.
  • Participated in multi-disciplinary defect reviews to discern and address root causes.
  • Executed operational audits and assessed company operations, compliance and other associated risks.

Maintenance Engineer

LG Electronic
ISMAILIA, EGYPT
01.2001 - 05.2005
  • Make the annual maintenance plan for Factory
  • Reporting about maintenance situation improvement
  • Make maintenance oriented system to decrease repairing time
  • Follow up lines Maintenance
  • Increase lines capability during improve M/Cs performance
  • Line up new models and lines stop rate
  • Developed process improvements to increase reliability and equipment performance.
  • Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.
  • Actualized strategic plans and managed equipment, lifecycles and processes.
  • Conducted cost estimates and performed preventive maintenance [Type] items.
  • Adjusted machine settings to maximize performance and equipment longevity.
  • Positively engaged with customers and maintained professional appearance as company representative.
  • Continuously adhered to strict regulations as well as detailed instructions, guidelines and specifications.

Education

Bachelor of Science - Mechanical Engineering Technology

SUEZ CANAL UNIVERSITY
PORT SAID
10.1994 - 06.1999

Skills

ENGLISH AND ARABIC

undefined

Accomplishments

  • May 15, 1976
  • Nationality
  • EGYPT
  • Experience
  • MECHANICAL CONSTRUCTION MANAGER (MEP )
  • Critical Engineering Company
  • Construction of Inochem plant for Inorganic Chemical Industries
  • Scop of work
  • MEP projects manager ( HVAC , Fire ghting , Plumbing & Infrastructure networks)
  • NASSER ABDULLAH ALDUBAYYAN CO
  • Scope Of Work
  • Carried Out projects
  • Client : Aramco
  • Scope of work : HVAC construction , Mechanical test & commissioning
  • Client : Royal Commissioning
  • Scope of Work : HVAC construction
  • Main contractor : Baytor
  • Scope of work : HVAC , Plumbing and electrical construction
  • Client : Aramco
  • Scope of work : MEP construction and infrastructure
  • Main contractor : Nesma Holding Company
  • Client : Royal commissioning
  • Scope of work : HVAC construction
  • Main contractor : Nesma Holding company
  • Scope of work : installation of Fire ghting network
  • Projects manager for ( Insulation ,Painting & Passive Fireprotection), Advanced
  • ARABIC
  • Advanced
  • Certi cations &
  • Courses 2021 : Project Management professional ( PMP work shop ) 2018 : Diploma at Executive Management 2013 : NSC OSHA training 2005 : Certi ed lead auditor ISO 9001-2000 certi ed from BSI 2004 : 6 sigma activity " Black Belt " ( LGE ) 2003 : Top global management ( LG Learning .center , Korea ) 2003 : 6 sigma activity " Orang , Green & Black Belt " ( LGE ) 2002 : On job training for production & maintenace activities ( 5S , lean manufacturing , KPI ,
  • TDR )

Timeline

MECHANICAL CONSTRUCTION MANAGER (MEP )

Critical Engineering Company
08.2020 - Current

MEP Projects Manager ( HVAC , Firefighting , Plumb

NASSER ABDULLAH ALDUBAYYAN CO
07.2015 - 06.2020

Projects Manager for ( Insulation ,Painting & PFP

ISAM KABBANI CONSTRUCTION CO
05.2011 - 06.2015

QA/QC Manager for ( Insulation ,Painting )

ISAM KABBANI CONSTRUCTION CO.
04.2007 - 05.2011

Quality Engineering Manager

QUICK TEL
05.2005 - 04.2007

Maintenance Engineer

LG Electronic
01.2001 - 05.2005

Bachelor of Science - Mechanical Engineering Technology

SUEZ CANAL UNIVERSITY
10.1994 - 06.1999
AMIR TAIRMEP PROJECT MANAGER