Amit Kumar Singh

Delhi

Summary

An engineering professional with 5 years of experience in Construction Industry which Includes Infra projects, underground Metro and Railway Projects in NATM. Streamlining operations, administering site operations from planning to execution

working well under pressure and meeting strict deadlines.

Overview

5
5
years of professional experience

Work History

Tunnel Planning Engineer

Samsung C&T
01.2024 - Current


  • Maintaining accurate records of all phases of tunnel construction and Time cycle is crucial for project documentation and future reference. prepare comprehensive reports detailing project progress, technical challenges, deviations from plans, and lessons learned for continuous improvement.
  • Collaboration with various stakeholders including geologists, structural engineers, construction teams, and project managers . Resolve technical issues, and ensure smooth execution of the project according to the established plans.
  • Participated in weekly progress meetings, providing updates on schedule adherence, resource allocation, and overall project health.
  • Reviewed design documents and coordinated revisions as to meet changing client requirements or construction constraints.
  • Maintained excellent communication with clients, providing regular updates on project status and addressing concerns promptly.
  • Developed customized reports for stakeholders, presenting key performance indicators that informed decision making.
  • Monitored project progress, identifying potential risks and implementing corrective actions to mitigate their impact.
  • Responsible for making RESS, Cycle Time, DPR
  • Daily Shift review meeting, weekly cycle time and progress meeting to the client
  • Tunneling using NATM (Drill & Blast) method. ensuring all support fix properly (Excavation, Sealing Shotcrete, Rib/LG, Responsible for face drilling, charging, blasting, mucking, Installation of primary and secondary support. Canopy Tubes/SDA/Swellex Bolts/CT bolts and much more

Tunnel Engineer

AECOM
09.2022 - 01.2024
  • Analyzing the baseline program and monitoring the progress accordingly
  • Also, analyzing the monthly and weekly programs and sharing suggestions for changes if required
  • Supervision of drilling and blasting and associated works such as vibration monitoring, optimization of drilling pattern etc
  • Checking of blasting proposal submitted by contractor for approval
  • Estimation of quantities of various tunnel activities
  • Monitoring/supervision of tunnel activities as per approved drawing, approved MS and Contract Agreement
  • Monitoring/supervision of structural activities such as Piling (for ROB), Open excavation, RCC Retaining Wall, pipe culvert as per approved drawing and Method Statement to ensure work safety, quality and progress
  • Worked with foreign Expat and acted as a medium for language related Issues
  • Discussing site related issues with Manager
  • Coordination with design department regarding design related issues
  • RFI receiving and closing after scrutiny of proper attached documents
  • Worked on PMIS (project management Information system) for entry of actual tunnel support
  • Ensure that proper materials are being used as per standard specifications
  • Identify and analyze between final drawing and as built drawings
  • Preparing minutes of meeting, Daily Progress Report
  • Analyzing delays due to machinery breakdowns, less manpower, etc.

Site Engineer

J.Kumar Infraprojects Ltd.
06.2019 - 09.2022
  • Tunnel advancement with drilling and blasting method
  • Making all arrangements required for the drilling and blasting works
  • Analyzing various technical aspects of drilling and blasting such as powder factor, vibrations during blast, MIC, etc
  • Being used for NATM tunnels
  • Involved in Site Planning, analyzing the programs and scheduling the work accordingly
  • Monitoring/supervision of tunnel activities and other structural activities such as Piling, deep excavation, utility diversion, etc
  • As per approved drawing and method statement to ensure work safety, quality, and progress
  • Making Daily Progress Report, analyzing delays due to machinery breakdowns etc
  • Reviewed construction work against technical designs and drawings to assess compliance
  • Coordinated and facilitated onsite consultant, regulatory and client representative inspections
  • Communicated with project accounting about monthly subcontractor billings and pay applications
  • Monitored materials inventory and requested items for restocking for each job.

Education

B. Tech - Civil Engineering

Dr. A.P.J Abdul Kalam Technical University

Senior Secondary School - Indraprastha Convent

Delhi (C.B.S.E.)

Skills

  • AutoCAD 2D

  • Microsoft Excel

  • Microsoft Word

  • Microsoft PowerPoint

  • Good Communication Skills

  • Excellent technical skills

  • Project Coordination

  • Construction Methods

  • Safety Regulations

  • Scheduling Techniques

  • File Maintenance

  • Presentation Skills

Accomplishments

  • Received “Outstanding” rating as an annual performance review by Project Manager for the FY21.
  • Received “Best PMC in Tunneling” award by the Client-RVNL for achieving fastest progress in tunneling.

Additional Information - Project Details

  • INDIAN RAILWAY PROJECT - UTTRAKHAND, AECOM, Tilani Yard - Railway yard will be constructed for storing, sorting, or loading and unloading railroad cars and locomotives. Construction involves works like: Slope protection using rockbolts / anchors, wiremesh & shotcrete. Protecting embankments by constructing retaining walls, either RRM wall, gabions wall or RCC wall. Construction of piles for Road Over Bridge construction. Box culvert was constructed for draining out the water towards the river. Tunnels - The total tunnelling was 18km by NATM. There were mainly two tunnels: Main Tunnel and Escape Tunnel (09 Km each). Main Tunnel included Triple Track section merging to Double track and then into single-track section. It also included Firefighting section whereas Escape tunnel included Electrical rooms. Cross Passages were constructed at every 375m c/c along with Layby sections in Escape Tunnel. One Adit was construction to facilitate the tunneling process.



  • Mumbai Metro Rail Corp. Project (Maharashtra), J.Kumar Infraprojects Ltd., NATM Scissor Crossover - A Crossover was constructed to allow trains to switch the tracks. It is India's first underground crossover constructed by excavating TBM bored tunnels. Construction work involved: Tunnel sections of different heights, widths and lengths were constructed. Waterproofing works: Membranes at Invert were installed while Sprayed waterproofing at Overt was done. SFRS/SFRC was used as a secondary lining support in heading & benching. Concrete lining was done to support invert. Headwalls were casted with concrete at all transition zones. NATM Subway - A 200m long tunnel was constructed as an entry and exit passage for the public. Construction work involved: Drilling and blasting method was used for face advancement for rock class I & II. Lattice Girder, wiremesh, shotcrete, Rockbolt (GFRP & SN) and spiling bars were used as primary support. Waterproofing was done with geotextile and PVC membrane. Concrete lining was used as a final support. Cross-passage - Total 08 nos. of Cross passages were constructed for emergency exits. Construction involved: Steel rings were used for temporary support of TBM tunnels. Lattice Girder, wiremesh, shotcrete and forepoles were used as primary support for the Cross-Passage. Concrete lining was used as a final support. Permanent steel ring was installed to support the TBM rings.

Timeline

Tunnel Planning Engineer

Samsung C&T
01.2024 - Current

Tunnel Engineer

AECOM
09.2022 - 01.2024

Site Engineer

J.Kumar Infraprojects Ltd.
06.2019 - 09.2022

B. Tech - Civil Engineering

Dr. A.P.J Abdul Kalam Technical University

Senior Secondary School - Indraprastha Convent

Delhi (C.B.S.E.)
Amit Kumar Singh