Review quality of all materials at site and ensure compliance to all project specifications and quality and collaborate with department for all material procurement and maintain quality of materials. Manage all work methods, maintain knowledge of all quality assurance standards, monitor the continuous application of all quality assurance processes, and recommend corrective actions for all processes. • Responsible for the inspection of materials delivered at site
· Preparation and implementation of QA/QC policies and procedures
· Managers in reviewing the contractor’s specific quality plans and produce recommendations
Ensure timely and effective resolution for QA or QC issues, in coordination with Construction.
· Ensure the conformance of the materials given from its Mill Certificate and Certificate of Conformance
· . Ensure the proper documentation of the materials arrived.
· Responsible for checking the condition and storage Materials
· . Responsible for checking the condition, calibration and adequacy of equipment being used.
· Monitor the all type of civil ongoing works on site daily bases.
· Prepare the Inspection and test plan(ITP).
To review IFC drawings prior to implementation.
· Conduct internal inspection among all activities and record inspection finding I the internal inspection logbook, follow up with the construction to ensure that the activities complying with the requirement.
· To coordinate, control and monitor all civil quality Control Inspection activities at the projectsite.
· Verification according to IFC Drawing for reinforcement detail of column footings
· Technical supervision of different types of concreting work. Preparing completion report submitting for approval.
· To perform QA/QC engineering inspection on reinforcement cement concrete frame structure Work, monitor during and after work execution conforming to international standards. Making Non-Conformance Report (NCR) on contractor
· To visit, conduct monthly inspection on approved ready-mix concrete and batching plants, and consolidate information to generate monthly status report. Making of weekly and monthly progress report of the project., •
· Excavation work as per standards
· Quality control of work Execution
· Checking of plumping and level for all the work
· Coordination with Saudi Aramco PMT and Inspection Unit regarding facility / material inspection, QA/QC records and submittal.
· Conduct testing and monitoring to ensure compliance with applicable Specifications, Standards, approved QA/QC Plans and Inspection and Test Plan.
· Daily monitoring and inspect all site work. Checking layout of foundation materials, being used as per approved material sheets.
· Quality control inspecting for all concrete foundation Manager/Consultant/DepartmentHead
· Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.
· Carry out inspection and checking for all quality related procedures in the site and ensure activity at the site are as per approved method statement and inspection test plan.
· Coordinate with the contractor’s representative and Site Engineer in charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.
· Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction, SI.
Responsible for the quality and workmanship of every activity, with thorough knowledge of all phases of engineering construction relating to civil, architectural, and structural disciplines interfacing with the multidisciplinary operations.
· Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.
· Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP.
· Liaise with Contractors quality Engineer for submission of material submittals to Consultant.
§ Responsible for the coordination, planning, monitoring and control for all the project activities from the Initial stage up to closing out.
§ Ensure a safe working environment.
§ Reviews all project correspondences received from contractor and action them by giving appropriate Instructions to his subordinate.
§ Ensure that his project is progressing according to the approved planning program in collaboration with
§ The planning department. (Follow up: planning, technical, production, delivery, erection).
§ Oversee the works as per plan for resources and daily/weekly activities.
§ Responsible for weekly / monthly comparison between the projected budget and progress of the work.
§ Monitoring the progress of projects and analyzing the actual costs against budget. Highlighting the Variances in projected budget.
§ Follow up and coordinate with the concerned depts. to ensure that all the site activities are progressed
§ Smoothly to the satisfaction of the client.
Scheduling materials purchases and delivery.
Supervise all kinds of building work, control the staff, and prepare the bar bending schedule for steel preparation.
Supervise the site work according to the drawings.
Checking the Level and alignment of panels. Supervising and monitoring the site laborers, and monitoring the work of any subcontractors.
Delivery shall be in sequence as submitted.
Install the precast unit in place by its code numbers and as per sequence, in the way it can be easily seen.
Checking every activities of each facility at site before offering and inspection the consultant.
§ Record as built data for various services as built drawings. Scheduling materials purchases and delivery.
§ Supervise the all kind of buildings work & and control the staff & labors.
· Checking every activities of each facility at site before offering and inspection theconsultant.
· To arrange all necessary markings for structural and finishing works.
· Section leveling.
· To check alignments for tower crane and hoist.
To check PC (Pre-Cast) facades and outer faces asbuilt
Father’s Name
Muhammad Saleem
Date of Birth
Jun, 04st 1985
Religion
Islam
Nationality
Pakistani
Marital Status
Married
Passport No
CA5757443
saleem_aqeel@yahoo.com
Mobile No. +966 534061399
Address
Riyadh (KSA)
Have valid KSA driving license