SAUDI TECHNICAL GROUP OF COMPANIES:
Z3 SHARMA ROYAL PALACE PROJECTS:
Royal Buildings: Diffayah Villa,Sons Villa, Main Villa Extension, Gulten Kitchen , External Work Utilities:
Supply Installation of HVAC, Fire Fighting System and Plumbing system, External Underground utilities of Sewage Man holes, Sewage Piping, HDPE, Cast iron,RTR Piping for sewage,Fire fighting,and water supply systems.
Testing Commissisoing with third part STED for HVAC, Fire Fighting and Plumbing systems.
Final Hnadover with DAR Consultant and Client.
K88 YAMAM PALACE RIYADH :
Royal Buidling:Building 11 Entertainment and Sports Villa, Building 11A GYM,Building 11B Swimming Pool with DAR Consultant.
HVAC :Supply, Installation, Testing and Commissioing of ROYAL PALACE, HVAC units, Chill water AHU, FCU,Exhaust Fan.Duct Fittings,VAV,SA Complete System.
Fire Fighting:Supply Install and Testing Commissioning of Fire Fighting Piping,Sprinkles, FHC, ZCV, Alarm check valve and NOVA FM200 Systems.
Supply Install testing and Commissioning Of Sewage Manhole, IC Chamber,sewage piping.
Supply Install, testing and commissioning of Water Supply piping, PPR,UPVC,CPVC for Toilets/External Piping and valves, Thermostatic mixers,Central Heaters.
• Prototype 5 Site 79 Patrol Security offices Hail:(With Katib Alami Consultant) Jan 2017 to-July 2017
• Prototype 6 Site 88 Civil Defense Building Hail:( With Katib Alami Consultant): August 2017 to Janvaruray 2018:
• Prototype 16 Site 255,256 and 260 Civil Defense Buildings KHUTA and Shimli:( With Katib Alami Consultant): Feb 2018 to October 2019:
• Protype 09 Site 145 Hail Region Investigation Buildings:(With Katib Aalmi Consultant). January 2020 up to Present.
• Prototype 15 Site 192 Fronsenic Laboratory and Admistration Buildings at Hail: May 2020 upto present.
Hail Kap.1 Sites Working as Senior Mechanical Engineer Responsible for:
Prepare Technical Material Submital for approval with Consultant.
Coordinate with Design Department for preparing Shop drawings .
Bidding and Estimation and cost control for new Project Contracts.
Placing Materials Orders, Supplier Contacts, arrange materials delivery.
Supply, Installation, Testing and Commissioning of York,Carrier, Trane, Air Cooled scroll chillers, AHU, Fahu,FCU and AC of Zamil, LG, York,Trane, with Piping, Fittings Valves and Accessories.Supply Installation, Testing and Commissioning of Schindler and Mitsubishi Elevators.
Supply, Install testing and Commissioning of Truck Filling/washing Booster Pumps.
Supply Installation and Testing and Commissioning of Under Ground Chill water piping (Pre-Insulated Chiller Piping and Valves boxes and accessories.
Supply Installation and Testing and Commissioning of Underground Utilities, Portable, Non portable water supply piping, Irrigation, Fire Fighting HDPE system,)
Supply Installation and Testing and Commissioning of External Sewage Network, sewage man holes,IC.
Supply Installation and Testing and Commissioning of Fire Fighting Systems, Sprinkles, FHC, FM200, Auto CO2 system,Fire Hydrant and Foam Cabinet.
Supply Installation and Testing and Commissioning of LPG Gas system Piping,valves and Gassco approved tank.
Installation, Testing Commissioning of Medical Gases, Medical Vacuum, Medical Compressed air system.
Supply Installation and Testing and Commissioning of Cold storage systems.
Supply Installation and Testing and Commissioning of Diesel systems with Diesel tank and Pump.
Supply, Installation Of R-O Plant.
Primary and Secondary Pumps For Chiller.
Supply Installation, Testing and Commissioning OF BMS
ROYAL GUARD SECURITY OFFICES RIYADH :
(Royal Guard Miracles Consultant)
Mechanical Project Engineer:
Install Testing Commissioning of Multi VRF System of High Raise Buildings according to LG Installation Method. Installation of MULTI V indoor and Out door Units . Copper Piping Installation, Testing.
Air Balancing of Central HVAC System.
Installation Testing Commissioning of Building Inside and external under ground Sewage System Connect to External Municipal System. Design , Making of Sewage Manholes, UPVC Piping, according to Invert Level making Slope and gravity design.
Installation , Testing Commissioning System of Underground Storm Drain Man holes, UPVC Piping, RC piping according Existing Municipal Systems.
Install, Testing Commissioning of Fire Fighting Inside Building Piping, Sprinkles, Zone Control Valves Assembly, Fire Hose Cabinet, and External Under ground Fire Hydrant HDPE Electro fusion Piping and Fire Hydrant installation.Install, Testing and Commissioning of External Building Irrigation System Piping, Bubblers,
Prince Moshin Hospital Reheabilition Project Ul-Ulha KSA (Ministry Of Health KSA).
S Senior Mechanical Project Engineer.
Responsibilities:
Study B.O.Q and Tendering Contract and Estimation of Materials Brands Quantities.
Submitting Materials Brands ( Chillers, Boilers, Medical Gases, HVAC, Plumbing Pumps ,AHU, Fcu, Fire Pumps, STP). Drawing( HVAC, Plumbing, Fire Fighting, Medical Gases, Steam ) to Consultant, also checking Design and Capacities of Mechanical system and Guiding the designers according to Site Installation and Specification, Schedules, Classes and Capacities and follow the International, ASTM, ANSI, SAMACNA,ASHARE Standards. Reviewing the quality documentations (procedures, drawings material specifications ).
5- Installation and testing Commissioning of HVAC Fan Coils Units, Concealed Type and Floor Mounted two way control System Valves, Fittings, BMS Control System.
6- Installation, Test And Commissioning of Steam Boiler System 1600kg/hr, Design Standard BS EN 12953, Boiler Thermal Efficiency 88%, Fire Tubes Three Pass, Wet back,88 Tubes, Shell Boiler, 2 Boiler Set Working one stand by, Design Working Pressure 10 Bar., Automatic Blow down Control System ,Pressure Reducing Bench and Steam Supply for , calorifers, Heat Exchangers, O,R Sterilization, Air Handling Units Humidifier, Kitchen, Laundry Areas, also black steel Steam pipe Sch 80 installation.
7- Installation, Test And Commissioning of Main Hospital Operation Theatres Laminar Air Supply With HEPA Filters.
8- Installation, Test And Commissioning of Heat Exchangers, Calorifers, Condensation Tank.
9- Installation, Test And Commissioning of Submersible Pump Set.
10- Installation, Test And Commissioning of Package Air Units With all Duct Fittings.
11- Installation, Test And Commissioning of FM200 Of Main Hospital Electrical Rooms and Transformer Areas.
12- Installation, Test And Commissioning of Medical Gases pipeline, Medical Machinery, AGSS, Triplex Compressor System(Medical Compressed Air, Medical Vacuum, Medical Oxygen, Nitrous Oxide) piping, Area Valve Service Units, Bed Head Units for operation theaters and all Patient Wards.
13- Installation, Test And Commissioning of Automatic Kitchen Hood Fire Extinguisher System for Main Building.
14- Installation, Test And Commissioning of Plumbing portable water Reverse Osmic filtration Plant , Pump set and Pvc, Cpvc Pipelining to whole Hospital and Buildings.
15- Installation Testing and Commissioning of Booster Pump Set, Raw Water Pump Set Variable Speed Drive, Irrigation Pump Sets, Central Hot Water Circulating Pump Sets With Pneumatic Pressure Vessels.
16- Installation testing and Commissioning of HVAC Extract Fan Up-Blast and Down Blast 50 PSC.
17- Drainage(Vent, WC, Soil) and Water Supply Piping Hot and Cold Water Supply for all Hospital Building.
18- Installation and Testing Commissioning Of SEWAGE Treatment Plant.
19- Installation, Testing and Commissioning of Fire Fighting Pumps, Electrical Motor, Diesel Generator, Jockey Pump of Pressure of 11 bar and also SCH 40 Black Steel Piping Groove Lock, Fire Hose Cabinet, Landing Valves, Fire Hydrant..
20 Make the payments of all Mechanical Work(HVAC, Fire fighting,,, Plumbing work ,Medical Gas, Steam Boiler System.) according to B.O.Q. Material installation, material delivery and approve from consultant.
21Study the Single Line Diagram of AHU,FCU, Chillers for water Balancing.
22-Mechanical shop drawing reading and make amendments coordinating with team members.
1- HVACs System: Installation, Test And Commissioning Of Main Hospital, and also related buildings Duct Fittings Gauge 24,22, as per International Standards, Chill & Hot Water Black Steel pipe Sch 40, Two Way Control System, Wield Joint, DRV Valves, Air Handling Units, Package Air Units, Post Treatment Units, Fan Coil Units, Chillers, Extract Fans, Monitoring and Control with BMS Automation and Trouble Shooting, According To ASTM and SAMCANA , ASHARI.
2- Installation and testing Commissioning of HVAC Variable Speed Drive Pumps, Primary and Secondary sets with Pneumatic Pressure Vessels With two-control System Variable Speed Drive, Control and Monitoring With BMS.
3- Installation and testing Commissioning of HVAC Air Cooled Screw Type Chillers 600 tons four Pieces three working one stand by all Piping, Water Balancing, DRV Valves, Accessories, BMS Control System Monitoring Flow, trouble Shooting.
4- Installation and testing Commissioning of HVAC Air Handling Units, Post Treatment Units, Fresh Air Intake Units With Duct Accessories(Filters, Hepa Filters, Bag Filters, Sound Atenventor, Dampers, Fire Dampers, MOTORIZED Damper) Piping ,Valves, Two Way Control with Variable Speed Control System, Hot Water, Chill Water, Steam Humidifier, BMS Control Systems.23Raise RFI of all mechanical system(HVAC ,Fire fighting, STP,LPG, Plumbing work ,Medical Gas, Steam Boiler System) installation. Coordinate with Consultant for inspection and responsible for approve installation.
24Give the materials purchasing demand. Check the need quantity according with drawings and make the demand quantity of all mechanical systems.
25Coordination with other departments (Civil, Electrical &Architecture in the line of project).
King Abdullah Sports City ,Jeddah (saudi Aramco):
Mechanical Site Engineer Responsible:
Maintain the daily progress report following the execution of work on daily activities.
Monitor and coordination with subcontractor for work progress reporting.
Study the project in terms of engineering design and check its validity on present conditions.
Reporting to client on daily, weekly and monthly activities.
Maintain the quality of work according to National & international standards.
Reporting to higher officials on daily, weekly and monthly activities.
Coordination with company management for project expanses.
Visit sites on daily bases, note discrepancies and inform related one for their removal.
Coordination with quality department for quality assurance.
Prepare the project equipment plan and their approval from client.
Manage the availability of equipment on time.
Perform equipment testing check.
Coordination with other departments (Civil, Electrical Architecture in the line of project).
Work under Pressure and in emergency conditions.
Attending acceptance with client and fulfill their requirements.
Work as team member and team lead.
Preparation of bill of quantities, financial effects and interim payment certificates.
Site surveillance to check the construction work and give comments if necessary
according to standards.
Familiarization with overall construction scope of work.
To prepare request for inspection for client inspection for completed activities. Highlighting
MECHANICAL SITE ENGINEER
MECHANICAL ENGINEER FOR PRODUCTION:
Responsible for automobiles IC engine spare parts manufacturing.
Responsible for inspections Department. Maintain quality.
Daily production achievement.
Responsible for govern building Installation of Package unit, Split AC.
Maintenance of HVAC systems in LAHORE Gran Hotels.
Internship in automobile car industry.
MS OFFICE, POWER POINT
AUTOCAD
PRO-ENGINEERING
ESTIMATION TOOLS
ANAYLIZER
Mechanical Project Engineer have ten years Professional experience in KSA Construction Projects with Client MOI and MOH, Royal Palaces.
·Abilities:
Estimation Cost Control Engineer.
· Site Execution/Testing Commissioning Engineer
· QA/QC Department Engineer
· Procurement/Purchasing Coordinator
· Design Co-coordinator
· Revenue generation
· Business development
· Effective marketing
· Organizational capacity
· Operability and commitment
· Ability to motivate staff and maintain good relations
· Resistance to stress
· Good manners
LIST OF PROJECT HANDOVER IN KSA:
YAMAMA K88 ROYAL PALACE Project Riyadh
Z3 Sharam Royal Palace Project
King Abdullah Sport City Jeddah Saudi Aramco.
Prince Abdul Mohsin Hospital Ulha. Ministry Of Health.
Royal Guard Office Building Project Riyadh.
King Abdullah Petrolem City Riyadh
Hail Kap.1 site 79 Office Building. Ministry of interior.
Hail Kap.1 site 88 Civil Defense Building Hail Senaya. Ministry of interior.
Hail Kap.1 site 256 Civil Defense Building Khuta Hail. Ministry of interior.
Hail Kap.1 site 255 Civil Defense Building Hail Muntaza. Ministry of interior.
Hail Kap.1 site 260 Civil Defense Building Shimli. Ministry of interior.
Hail Kap.1 Site 192 Hail Fronesenic Laboratory. May 2020 to present. Ministry of interior.
MS OFFICE,AUTOCAD, PRO-ENGINEERING
· Pakistan Engineering Council (PEC) Registration # MECH/24554
Saudi Engineering Council (SCE)I.D No: (134908 )