Inspection and Testing of Electrical systems as per SBC-401 and IEC-60364-1 standards.
Inspection and Testing of cables, wires, DBs, SMDBs, ACBs, VCBs, OCBs, light systems, electrical Panel boards and other electrical equipment’s installed in the buildings.
Thermography inspection of the electrical panels using infrared camera.
Inspection of panels connected VRV/VRF systems
Testing and measuring earth resistance (ER) and Insulation Resistance (IR), of all cables in the buildings.
Inspection and Testing of environmental parameters like temperature, humidity, sound level, light intensity and PPEs.
Inspection and Testing of Wheel Loader, Backhoe Boader, Excavator, Landfill Compactor, Tractor Dozer, Grader, Scraper, Pipelayer, Roller, Paver finisher, Road milling machine and Soil stabilizing machine.
Implementation of various standards like from SASO ISO 20474-1:2017 to SASO ISO 20474-12:2017 and from GSO EN 500-1:2011 to GSO EN 500-6:2011.
Offers actionable solutions to rectify the identified problems to enhance safety and efficiency of electrical installations.
Compiles all findings into a detail technical report include visual, test data, analysis and practical recommendations.
Electrical Engineer/Assistant Project Manager
Rak-Al-Jazeera for Contracting Co, Ltd, Jeddah.
11.2022 - 04.2025
Preparing, submitting and receiving IRs, MIRs, WIRs, J.Os, J.O.Cs and Invoices from consultant office for further process and approval.
Sending MRs to the procurement department as per the consultant comments and site requirements.
Taking pictures of all site activities and sharing it on company’s WhatsApp group to keep updated the higher authorities regarding work progress.
Guides, instructions, follow-up and help the electrical technicians at the time when they stuck.
Lead and guide a team of 43 persons including junior electrical engineers, supervisors, electrical technicians, foreman and labors.
Preparing daily, weekly and monthly work progress report of site activities.
Interpreting and understanding the relevant documents, schematics and drawings.
Preventive and corrective maintenance of sound systems, Ericson telephone systems and Synchron centralized clock systems.
Responsible for a periodic site visits to inspections and monitor the project parameters & utilities.
Testing, commissioning and maintenance of lights, sockets, switches, MCBs, MCCBs, RCCBs, MDBs, MCCs, SMDBs & DB panels as per As-Built drawings.
Preventive and corrective maintenance ACBs, OCBs, VCBs and SF6 circuit breakers.
Preventive and corrective maintenance of motors, pressure pumps and transformers on sites.
üDealing with clients, contractors, vendors and consultants.
Testing and commissioning of low, extra low and medium voltage systems in building sites.
Rectifications of site as per the consultant’s comments to close the rejected IR’s and NCR’s as per the corrective action.
Preventive and corrective maintenance of ES 4100 Fire Alarm Control Panel, addressable smoke, duct, heat detectors and troubleshooting the loops.
Electrical Engineer/Project Coordinator
Rehman Contracting Company, Pakistan
01.2020 - 10.2022
Assigning appropriate tasks and scheduling meetings and training sessions to junior engineers.
Supervision working team of 49 persons including junior electrical engineers, supervisors, electrical technicians, foreman and labors.
Receiving, preservation, storage of electrical items from suppliers and cross checking of its quality, specifications and manufacturers with P.O, Quotations, RFI, MTO, AML, MTC and data sheets.
Preparing daily work plan for the team on project site.
Ensure the availability of appropriate materials and tools on working site and prepare cost estimation.
Preparing weekly MRs for electrical and electrics items on consultant and client demands.
Monitoring, inspection & witnessing commissioning tests of electrical systems & follow up for standardization & quality job.
Modification & engineering of site activities for the betterment of client and customers.
Gathering relevant data, compiling reports and delivering presentations to relevant stakeholders.
Ensure compliance with safety regulations and procedures.
Preventive and corrective maintenance of electrical cables, wiring, cable trays, conduits, lights, sockets, switches, MCBs, MCCBs, RCCBs, MDBs, SMDBs & DB panels.
Looping of electrical and data cables to the new established offices in the building.
Installation of square and round trunks on wall and floors for the safety and arrangement of electrical and data cables.
Installation of electrical equipment’s and devices according to the As-Built drawing on building sites
Witnessing and inspection of cable trays, electrical conduits and its fitting as per international standards and specifications.
Dy. Director Academics/Project Manager
Government Women University Swabi, Pakistan
12.2017 - 11.2020
Lead and guide a team of 43 persons including Engineers, supervisors, technicians, Foremen’s and labors.
Monthly reporting to Higher Education Commission (HEC) about Electrical and Electronics laboratories instruments, devices and equipment’s.
Consultation with all professors of different departments to develop state of the art Electrical and Electronics laboratories according to their departmental requirements.
Deals with all types of academic’s issue/matters related to administrations of the University and all affiliated colleges.
Handling and communicating academics matters with Higher Education Commission (HEC) and Higher Education Archive Department (HEAD).
Prepare and provide weekly reports on technical activities to the Director Project and Vice Chancellor.
To observe and keep a check and balance on electrical and electronics equipment’s and devices in the University’s building.
Guidance and instructions to electrical technicians regarding fitting and installations of new cabling, wiring, lights, sockets, switches, MCBs, MCCBs, RCCBs, MDBs, SMDBs & DB panels according to available As-Built drawings.
Assistant Project Manager
Karcon (Pvt) Ltd, Pakistan
07.2014 - 08.2016
Supervise and oversee the work progress and daily activities of the projects.
Receiving written and verbal complains from all over the building and ensure its completions within time limit.
Coordination with mechanical, electronics, IT section, BMS engineer and procurement section to keep the work continuously without any interruption.
Daily meetings with the Director project and Chief Officers regarding issues and work progress.
Responsible to alert all the concern persons in case of any emergency in the building.
Preparing and arranging relevant documents like RFIs, technical reports, MIRs, WIRs, JOCs and invoices.
Daily, weekly and monthly technical reports preparation to help the project manager.
Preparing, submitting and receiving of relevant documents from consultant office for the approval.
Incorporating all the changes on sites as per consultant written recommendations.
Guides, instructions and follow-up the whole working team of the site.
Ensure all the safety precaution on site during working hours.
Arranging man power according to project needs by consulting with HR department.
Constantly searching for ways to improve efficiency while lowering project cost.
Field Engineer
Wateen Telecom, Pakistan
03.2010 - 04.2013
Supervise the site upgradation, expansion, integration and commissioning up to the final on air.
Supervise and monitoring site layout, tower excavation, Concrete pouring, site back filling.
Tower erection of different heights, equipment shelter installation ground system layout and electrical power installation.
Environmental alarm monitoring system and tower obstruction lights.
Provide technical and operational support to customers.
Assist installation teams in smooth deployment (installation and commissioning) of transmission links.
Transmission link up gradation, troubleshooting and maintenance.
Managed and supervised sub-contractors in the construction and implementation of BTS, BSC and Hub sites.
Education
Master of Science - Electrical Engineering
Blekinge University of Technology, Sweden, Europe.
Karlskrona
01-2010
Bachelor of Science - Electrical Engineering
University of Engineering & Technology.
Peshawar, Pakistan
01-2007
Certificate of Higher Education - Science
Post Graduated Jehanzeb College
Mingora, Swat, Pakistan
01-2003
Skills
,Electrical system inspection
Thermography analysis
Preventive maintenance
Corrective Maintenance
Project management
Testing and commissioning of Electrical System
Technical Report writing
SASO, ISO, GSO, ENS, SBC-401, IEEE and IEC standards Implementation
Electrical System analysis and practical recommendations
Expert in IRs, MIRs, WIRs, JOs, JOCs, RFI, MTO, AML, MTC and data sheets
Technical Skills and Computer Profeciency:
Tools: AutoCAD, Origin Pro8, VIKATO, MATLAB and Microsoft Visio