Construction project manager with 28+ years of experience in managing large-scale construction projects. Proven track record directing project-wide operations, administering multi-million budgets, negotiating contracts, controlling expenses, and boosting efficiency and productivity.
EXPEC-ADVANCE RESEARCH CENTER
Laboratory Building and Tunnel
Project Cost: 920 Millions Saudi Riyals
Client: SAUDI ARAMCO
Designer: Jacobs & DAR
Consultant: SAPMT Aramco
Responsible for working diligently on completing all projects on time and to budget. Coordinating the construction process for new locations. Relocation's and renovating existing buildings. Ensuring projects progress on schedule and in budget.
l Proposed new facilities under this project are being built to ensure support of the strategic research domains of the SAUDI ARAMCO Exploration and Petroleum Engineering Center (EXPEC) by expanding its facility in Dhahran to enhance research and technology within SAUDI ARAMCO.
l The scope is based on the total area required to construct a consolidated laboratory facility to support EXPEC ARC operations as planned through 2020. the laboratory facility will support a staff of 820 personnel and a total of 850 seats within an area of approximately 54,798 square meters (SM) and a secured connecting tunnel link between the proposed EXPEC ARC Laboratory Facility and the Core area of approximately 1,410 SM. proposed Laboratory building will be stand-alone facility. there will be no operating interfaces. Final building sizes will be developed during detailed design when all building systems are finalized.
l CIVIL WORK:
ü Pre-cast (Elevation, Curtain Wall, Aluminum (Elevation), Concrete for Skeleton, Finishing Work, Site Work (Including MEP)
l MEP WORK:
ü HVAC, External & Internal Plumbing Systems, Raw Water System, Purified Water System, Compressed Air System, Laboratory Vacuum System, Laboratory Specialty Gas System Bulk Nitrogen System, Sanitary Drainage System, Laboratory Waste System, Oily Water Waste System, Concentrated Oil Waste System, Mineral Oil Distribution System, Mud Waste System Storm Waste System.
DUTIES AND RESPONSIBLITIES
Ø Preparation of the project schedule.
Ø Review the project plans and specifications and comment on the building design, scheduling, Possible cost savings measures and potential construction problems.
Ø Assist estimator in preparation of project budget
Ø Prepare the general conditions budget.
Ø Assist in assembling the job site office and equipment requirements.
Ø Have confidence in own ability to intelligently communicate with design team/client as well as effectively lead the trades.
KING ABDULLAH PROJECT FOR
WAAD AL-SHAMAAL
CITY DEVELOPMENT PHASE-1
Project Cost: 1124 Millions Saudi Riyals
Client: MAADEN
Designer: Al Rashid Trading & Contracting Co.
Consultant: BECHTEL
Managing project budgets and coasts. Maintaining all project documents. Providing accurate construction cost estimates. Creating purchase orders. Making revisions to project work plans. Surveying properties & then writing a report on them.
TOWERS RASHID HOTEL PROJECT
Reading and understating tower drawings, site status reports, site plans and grounding plans. Carrying out periodic inspections of construction sites. Managing staff attendance.
DUTIES AND RESPONSIBLITIES
Ø Preparation of the project schedule.
Ø Review the project plans and specifications and comment on the building design, scheduling, Possible cost savings measures and potential construction problems.
Ø Assist estimator in preparation of project budget
Ø Prepare the general conditions budget.
Ø Assist in assembling the job site office and equipment requirements.
Ø Have confidence in own ability to intelligently communicate with design team/client as well as effectively lead the trades.
Ø Expedite all shop drawings and approvals
Ø Monitor and maintain the project construction schedule on a weekly basis.
Ø Raise and discuss relevant issues at the job site meetings. Prepare & issue minutes of all site meetings.
Ø Inform the Consultant/Client of any errors, discrepancies or omissions contained within the Consultant’s design drawings.
Ø Expedite all CCN & CO (change order) costs. Maintain current CO logs.
Ø Monitor site safety and ensure that the requirements of the Occupational Health and Safety Act are enforced.
Ø Ensure completion of and track all independent testing and inspections as required.
Ø Issue monthly progress draws and invoicing to consultant and client including final holdbacks.
Ø Maintain and enforce good construction standards and quality control.
Ø Maintain control and responsibility for the security and operation of VANDYK’s directly owned equipment on the job site in conjunction with site staff.
Ø Control and monitor labor, material and equipment expenses.
Ø Prepare monthly cost forecasting summaries.
Ø Ensure that “as built” drawings are prepared on an ongoing basis by all trades during the construction period and issue final close outs to consultant/owner accordingly.
Ø Ensure all required municipal inspections are performed.
Ø Prepare and expedite project deficiency lists.
Ø Review the work progress on daily basis.
Ø Prepare internal and external reports pertaining to job status.
Ø Plan ahead to prevent problems and resolve any emerging ones.
Ø Negotiate terms of agreements, draft contracts and obtain permits and licenses.
Ø Analyses, manage and mitigate risks.
Ø Ensure quality construction standards and the use of proper construction techniques.
Project Cost: 1652 Million Saudi Riyals
Client: King Saud University
Designer: Al Rashid Trading & Contracting Co.
Consultant: KSU
340 villas + 12 towers
Overseeing the development of project schedules. Ensuring that the project complies with all regulatory requirements.
DUTIES AND RESPONSIBLITIES
Ø Managing the Teams assigned to each project.
Ø Ensuring all works meet assigned technical standards and specifications and are as per Request for Proposal (RFP).
Ø Ensuring all Submittals and samples submitted on time and follow up of all submission and getting approval.
Ø Holding, taking of minutes, running of meetings and ensuring that all decisions followed and implemented on time.
Ø Preparing, certifying and checking of all Subcontractors payment vouchers and contract amendments.
Ø Ensuring that the actual site work is as per approved Work Schedule.
Ø Respect all internal and external rules and policies.
Ø Advising and supporting the Project Team(s) on any technical and logistics issues.
NASSRCO (SAUDI ARABIA)
VILLAS, MOSQUES, 2 CASTLES & 3 TOWERS
Reading and understating tower drawings, site status reports, site plans and grounding plans. Carrying out periodic inspections of construction sites. Managing staff attendance.
DUTIES AND RESPONSIBLITIES
Ø Leading project planning sessions.
Ø Coordinating staff and internal resources.
Ø Managing project progress and adapt work as required.
Ø Ensuring projects meet deadlines
Ø Managing relationships with clients and stakeholder.
Ø Designing and signing off on contracts.
Ø Overseeing all incoming and outgoing project documentation
KHAIRY LASHIEN (Egypt)
HOUSING PROJECT
Overseeing the development of project schedules. Ensuring that the project complies with all regulatory requirements.
DUTIES AND RESPONSIBLITIES
Ø Promoting professional standards for project management, contracting, and engineering across all disciplines.
Ø Maximizing resource efficiency through procurement and effective management of labor, materials, machinery and equipment.
Ø Preparing reports as required and submitting relevant information and recommendation forms improvement and/or change to the project on an ongoing basis.
Ø Advising and supporting the project Team(s) on any technical and logistics issues arising from assigned activities/projects.
Ø Coordinating activities and planning with the other key Office Project Manager/Staff: Program Manager; Construction Group Manager; Chief Support Officer, Security Manager, QC Manager, Safety Manager, Officer, Head Of Finance, HR Manager, & Etc.
Client liaison