Competent Telecommunications Technician bringing 10 years of experience installing voice, data and other systems. Expert at equipment configuration and troubleshooting. Well-organized and resourceful with superior work ethic.
Overview
10
10
years of professional experience
5
5
years of post-secondary education
Work History
Operation and maintenance _ Technician
I Engineering Saudi Ariba
Jeddah, Mecca Region
04.2024 - Current
Ensured safety by adhering to all health and safety regulations.
Performed routine checks for equipment functionality.
Maintained machinery, resulting in smoother production processes.
Completed installations with precision and accuracy.
Installation of indoor and outdoor telecom equipment such as RBS, RF Antenna, MW antenna, RRU Mini link-6000 series, BB6630, BB6631 and Router-6673.
Installation of 1.2 and 1.8 SD links, Super Dual Band (SDB) links under Ericsson-STC. Installation of AIR6449 with Baseband RAN processor 6651 under Ericsson-STC scope.
Power connectivity in Rectifier for all telecom equipment such as RBS, ML, RRU PT link etc.
Troubleshooting and replacement of faulty hardware/equipment both indoor and outdoor.
Monthly PMR activities including site quality, labeling and weatherproofing. Site readiness and confirmation, resolution of blocking issues for upcoming PAT activities.
Collaborated with other technicians to troubleshoot and resolve technical issues. Responded to service requests during and after business hours.
Ericsson Transmission _ Technician
Abrar Communication Saudi Ariba
Jeddah, Mecca Region
10.2023 - 03.2024
Conducted survey for modernization and implementation.
Conducted OHS by Epitope software with RSC team.
Pre-pat with RSC and quality team as per customer standard.
Pre-pat session uploading on Epitope.
HRLB Link installation and Configuration.
End to end media shifting.
Software and hard ware upgradation.
Capacity upgrade/downgrade.
4+0 Link Installation and configuration with ML6365 carrier Aggregation.
Installation and Configuration of a completely new link of 0.3m to 1.8m MW antennae.
Working on 1+0 1+1 2+2 2+0 (XPIC) 4+0 1+SD 2+SD 4+SD and parallel Links MW installation.
Ericsson RAN _ Transmission rollout _Technician
NUT Oman_National United Telecommunication Oman
Muscat Oman, Muscat
03.2023 - 08.2023
Knowledge of Mini-link and RAN Software.
Complete installation Rollout Site / 5G site with Quality.
Installation of Ericsson RBS 6140.
Complete Rollout Site survey according to Customer requirement.
Installation 5G Air 6449-B41.
Troubleshooting And clear VSWR alarms.
Troubleshooting And clear RSSI Alarms.
Tower climbing up to 100m tower.
Transmission Technician
FSO Ericsson Pakistan
karachi pakistan, karachi
06.2021 - 11.2022
Field Operation and Maintenances Rigger
I Engineering Pakistan
Gilgitbaltistan Pakistan, Pakistan
01.2021 - 06.2021
Verify all powers alarms.
Verify and test Generators and AC power alarms.
Clear VSWR XPD and take proper report.
Realignment microwave link and gain required RSL.
Install and replace faulty equipment .
Fallow EHS rules and use PPEs during work.
Installation and troubleshooting microwave issues.
Complete Trouble shooting of BBU 3900 GSM.
Ericsson Transmission _ Rigger
Seder Group Saudi Arabia
Riyadh, Riyadh Region
03.2015 - 05.2020
Tower climbing up to 100m.
Troubleshooting and clear RBS Power alarms.
Complete Rectifier and Battery bank installation.
Multi-band Booster link installation / configuration.
Installation and commissioning of ML6651-ML6691-ML6692-ML6693 nodes.
Electrical Review Engineer / Acting Team Leader at SAUDI ENGINEERING GROUP INTERNATIONALElectrical Review Engineer / Acting Team Leader at SAUDI ENGINEERING GROUP INTERNATIONAL