Performance-Driven mechanical engineer with self-motivation and enthusiasm for developing a deeper understanding of engineering principles.
Superior skill in communicating complex ideas in a clear and concise manner.
(OMPP):
Onshore Maintain Potential Project.
Client: SAUDI ARAMCO
Project:
(UTD):
Upgrade Tanks Dewatering
Client: SAUDI ARAMCO
The scope of work translates engineering, procurement and construction requirements, Saudi
Aramco expectations, and the way that LSTK CONTRACTOR shall execute Engineering,
Procurement and construction work associated with the following scope changes under "BI-10-
00930 - Upgrade Tank Dewatering systems at Ju'aymah and Ras Tanura Terminals."
Operating Philosophy for Ras Tanura Terminal South (RTTS)
Operating Philosophy for Ju'aymah Tank Farm (JTF)
Pressure Limitation of Existing 7.1km Oily Water Transfer Pipeline
Existing Electrical System Deficiencies at RTTN, RTTS, and JTF
This document is altering the project scope of certain scope elements as defined in this
document. Other scopes which are not impacted by the subject change shall remain unchanged.
CONTRACTOR shall have complete project responsibility for the performance associated with
the change order scope of work and all work defined under CONTRACT to ensure that project
delivered is fully functional per COMPANY standards and procedures.
CONTRACTOR shall undergo all necessary design development to arrive at optimum conditions
for design, construction and efficiency of operations and maintenance throughout the
performance of the work and the life of the facilities.
Project:
Hawiyah Unayzah Gas Reservoir Storage.
Client: SAUDI ARAMCO
(HUGRS):
The primary objective of this project is to provide the necessary facilities to
store off‐peak surplus sales gas via injection into the Hawiyah Unayzah
reservoir during the low demand season for reproduction back to the Master
Gas System during high demand, thereby maximising gas plants utilisation.
The WORK includes a combination of Greenfield / Brownfield work within a
large and remote geographic operating area, as generally depicted in the
below aerial overview. The map below shows the identified location for the gas
processing facilities and the identified locations for the new proposed pipeline
routes from the wells to the facilities and from the facilities to the Master Gas
System.