Babar Saeed

Babar Saeed

Raja Jang

Summary

Professional Electrical Supervisor experience with Facility maintenance, Installation and Testing commissioning.

Overview

29
29
years of professional experience

Work History

Superwatt Power Industrial Limited
10.2021 - Current
  • Installation, testing & commissioning of 2x600kW Diesel Generators at Karot Hydro Power Project, Pakistan

Electrical Foreman

El Seif Engineering Contracting Company
04.2018 - 09.2021
  • Maintenance & operation of medium voltage switchgear.
  • Conducted operation and Maintenance of Catterpillar 3516B Diesel Engine also it's auxiliaries.
  • Carry out preventive and corrective maintenance of UPS.
  • Performed troubleshooting of different LV systems like MDBs, SMDB, MCCs and also FDBs.

  • Enforced safety regulations and penalised workers for not following work safety agreements.
  • Obtained proper permits to carry out electrical work on facility and construction projects.
  • Trained electrical team in new technologies and methodologies, enhancing overall skill set and productivity.
  • Assembled and dismantled electrical components to troubleshoot issues and identify root causes.
  • Facilitated communication between electrical team and other departments to ensure project objectives were met.

Electrical Supervisor

Hill Metals Establishment Co.
12.2011 - 08.2017
  • At power house, responsible to maintain and operate medium speed generators, troubleshooting & modifications in DC wiring circuits
  • The plant is equipped with 6 Engines
  • 3.3MW CAT 3612.

Assistant Engineer

ALTEC LTD. Technical Electric Co.
12.2009 - 08.2011
  • At Holy Haram Makkah voltage conversion from 11kv @13.8 KV project
  • Supervised all testing of CTs, VTs, Busbars, circuit breakers, transformers and protection relays
  • Conversion of Wartsila DG sets from 11 KV to 13.8 KV.

Assistant Engineer

Al-Nahdi Electromechanical
03.2008 - 09.2009
  • Responsible for the cable laying and termination of medium voltage and low voltage systems
  • Installation and commissioning of telecom, data system, fire alarm, lighting fixtures, lightening and earthing systems.

CRO

Kohinoor Genertek
11.2006 - 02.2008
  • Operation, maintenance & Commissioning and troubleshooting of Caterpillar Gas Engines Combine Cycle Gas Turbines
  • Niigate Diesel/Furnace Oil, Engines
  • Oil Separator Heat Exchanger, Cooling towers, Level switches and Level indicators

Associate Engineer

Central China Electric Power Group
08.2005 - 07.2006
  • Testing & commissioning of 132 & 220KV control, metering & protection schemes
  • Testing of 132 & 220KV equipments i.e
  • Circuit breakers, disconnectors, CT/VTs and auto/power transformers.

Electrical Foreman

Al-Watnia
03.1997 - 03.2005
  • Al-Watnia power house, maintenance and operation of low & high-speed Generators, troubleshooting & modification of DC wiring circuits
  • The plant was equipped with 12Nos
  • 2.9MW Deutz Engines, 02Nos
  • Deutz Engines 5.9MW and 06Nos
  • Cummins 800KW Engines.

Medium Voltage Foreman (ESOM)

Haramain high speed railway station Madinah
05.2023 - I currently work here
  • Responsible for Operation and Maintenance all Electrical assets within the Facility from MV Switchgear to Small Power outlets.
  • Performed operation and Maintenance of MV Switchgear Schneider Electric.
  • Carry out preventive and corrective maintenance of RMU RM06 Schneider Electric.
  • Conducted operation and Maintenance of Schneider Electric MV Dry Type Transformers.
  • Performed operation and Maintenance of MDBs ,SMDB,MCC and FDBs.
  • Execute different tests for MV Switchgear, Transformers, MV Cables ,RMUs ( IR,Timing, CRM also PI Tests).
  • Complete all kinds of maintenance activities within defined time limit.
  • Prepare reports also give presentation to manager on different scenarios.
  • Satisfied the client on different occasion as per company's policy.
  • Familiar with the Effective Utilisation of time, material and manpower.

Elahi Electric Company
10.1995 - 03.1997
  • I started my carrier as Trainee
  • Here I learned troubleshooting of motor control & protection circuits and overhead cranes
  • Works at NIIGATA engines.

Education

DAE 03 Years. - Electrical

Government College of Technology
Lahore, Punjab
01.1995

Matric -

Govt. high school
Kasur, Punjab
01.1991

Skills

  • Installation
  • Erection
  • Pre-Commissioning
  • Commissioning of power plants and substations
  • Electrical expertise
  • Communication
  • Relationship management
  • Analytical problem-solving

Additional Information

Available upon request

Languages

English
Upper intermediate
B2
Urdu
Proficient
C2
Arabic
Intermediate
B1

Timeline

Medium Voltage Foreman (ESOM)

Haramain high speed railway station Madinah
05.2023 - I currently work here

Superwatt Power Industrial Limited
10.2021 - Current

Electrical Foreman

El Seif Engineering Contracting Company
04.2018 - 09.2021

Electrical Supervisor

Hill Metals Establishment Co.
12.2011 - 08.2017

Assistant Engineer

ALTEC LTD. Technical Electric Co.
12.2009 - 08.2011

Assistant Engineer

Al-Nahdi Electromechanical
03.2008 - 09.2009

CRO

Kohinoor Genertek
11.2006 - 02.2008

Associate Engineer

Central China Electric Power Group
08.2005 - 07.2006

Electrical Foreman

Al-Watnia
03.1997 - 03.2005

Elahi Electric Company
10.1995 - 03.1997

DAE 03 Years. - Electrical

Government College of Technology

Matric -

Govt. high school
Babar Saeed