Summary
Overview
Work history
Education
Skills
Languages
Certification
Timeline
Hi, I’m

Baris Elibol

Istanbul
Baris  Elibol

Summary

I'm a conscientious technical office manager with a 13-year track record of handling, planning, evaluating, and overseeing civil construction projects. I have expertise in project planning, risk management, and cost management, and I am skilled at analyzing and interpreting information. Also, I'm a hard-working technical office manager with strong organizational skills.

Overview

13
years of professional experience
5
years of post-secondary education
1
Certification

Work history

Yuksel Insaat Saudi Co.
Riyadh, Riyadh Region

Technical Office Manager
2023.06 - Current (3 education.years_Label)

Job overview

Project Detail

Name: Construction of TSE Network for Green Riyadh Program-Group Six and Thirteen

Project Value: 200.000.000 USD

Client: Royal Commission for Riyadh City (RCRC)

Project Management Consultant: ILF Consulting Engineers

The project is mainly composed of the construction of the TSE Network for the Green Riyadh Project Group six and thirteen. The project scope is divided into two main lines The first one comprises a 65 km long Carbon Steel Pipe; the second line consists of 55 km long ductile Iron Pipe.

Responsibilities

  • Project Reporting
  • Project Schedule Preparation
  • Procurement and Material Management
  • Budgeting and Cost Management
  • Quality Assurance and Control
  • Technical Guidance and Support
  • Contract Management
  • Progress Payment
  • Design and Engineering Oversight

Yuksel Insaat Saudia Co.
Riyadh, Riyadh Region

Technical Office Chief
2023.06 - 2023.09 (3 education.months_Label)

Job overview

Project Detail

Name: Al Qassim Simulator Building

Project Value: 12.000.000 USD

Client: U.S. Army Corps of Engineers

Project Management Consultant: Persons Corporation

The project mainly composed of the construction of Simulator Building at Land Forces Aviation Institute located in Al Qassim region including all civil and architecture works, MEP works, fire protection, asphalt roads, landscaping, drainage works, electrical and communication works like site lighting, lightning protection and fiber optic infrastructure. The project scope also includes all supporting facilities of simulator building, including electric services, water, sewer, fire protection, paving, walkways, curbs, gutters, drainage, existing MV line protection, tensioned fabric works and information systems.

Responsibilities

  • Project Reporting
  • Project Schedule Preparation
  • Procurement and Material Management
  • Budgeting and Cost Management
  • Quality Assurance and Control
  • Technical Guidance and Support
  • Contract Management
  • Progress Payment
  • Design and Engineering Oversight

Balkar Construction
Istanbul

Technical Office Chief
2023.03 - 2023.06 (3 education.months_Label)

Job overview

Project Detail

Name: Havelsan Systm Administration Building

Project Value: 11.800.000 USD

Client: Havelsan

Project Management Consultant: Erya Project Management

The Scope of Works includes construction (concrete works, steel works, and architectural works) of a total of 12,000m2 areas for the Havelsan administration building.

Responsibilities

  • Project Reporting
  • Project Schedule Preparation
  • Procurement and Material Management
  • Budgeting and Cost Management
  • Quality Assurance and Control
  • Technical Guidance and Support
  • Contract Management
  • Progress Payment
  • Design and Engineering Oversight

Aluteks Construction
Istanbul

Technical Office Engineer
2022.04 - 2023.03 (11 education.months_Label)

Job overview

Responsibilities

  • Project Reporting
  • Project Schedule Preparation
  • Procurement and Material Management
  • Budgeting and Cost Management
  • Quality Assurance and Control
  • Technical Guidance and Support
  • Contract Management
  • Progress Payment
  • Design and Engineering Oversight

Dost Construction
Istanbul

Civil Works Chief
2021.02 - 2022.03 (1 education.year_Label & 1 education.month_Label)

Job overview

Project Detail

Name: Teknopark İstanbul 3.Stage R&D Building

Project Value: 35.000.000 USD

Client: Teknopark İstanbul

Project Management Consultant: Entegre Project Management

The Scope of Works include construction (concrete works, steel works and architectural works) of totally 30,000m2 areas for Teknopark 3th stage R&D office building.

Responsibilities

  • Earthworks ( cut and fill )
  • Concrete Works
  • Steel Works
  • Architectural Works
  • Check the design of architectural, civil, electrical and mechanic projects controls
  • Construction materials management and quantity surveying on project site
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • Coordinate between consultant, client, and subcontractors.

Serka Construction
Doqm, Oman

Civil Works Chief
2018.05 - 2019.10 (1 education.year_Label & 5 education.months_Label)

Job overview

Project Detail

Name: Duqm – Oman – Terminal at Port of Duqm Project

Project Value : 320.000.000 USD

Client: The Special Economic Zone at Duqm (SEZD)

Project Management Consultant: JV Royal Haskoning UK Ltd & Khatib and Alami

The Scope of Works include, but not be limited to, the construction, installation, testing, commissioning and remedying of defects of complete infrastructure i.e. ground improvement , paved areas ( rigid and flexible pavement ), road works ,as well as building works ( steel structures & reinforced concrete ) of “Multipurpose Terminal ” , “Container Terminal 1&2”, “Bulk Terminal” and “Operation Area”. Some of the buildings are Control Towers. Administration Buildings & Amenities Center, Workshops & Maintenance Buildings, Substations & Switch Stations, Gatehouse, etc.

Responsibilities

  • Earthworks ( cut and fill )
  • Water, electricity and telephone lines displaced jobs
  • Pile Works
  • Installation Crane Rails
  • Oil water separate stations, Control Towers. Administration Buildings & Amenities Center, workshop & mantinince buildings, substations & switch stations, gatehouse construction Works
  • Construction materials management and quantity surveying on project site
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • Coordinate between consultant, client and subcontractors

Akon Group Construction
Balikesir , Turkey

Civil Works Site Chief
2017.09 - 2018.05 (8 education.months_Label)

Job overview

Project Detail

Name: Ivrindi Gold and Silver Mine

Project Value: 35.000.000 USD

Client: TUMAD

Project Management Consultant: TUMAD

The Scope of work is the construction and installation of the crushing unit, Fine ore silo, Grinding unit, and Thickening unit.

Responsibilities

  • Highway earthworks (cut and fill)
  • Check the architectural and design drawings Crushing unit, Fine ore Silo, Grinding Unit, and Thickening unit projects controls.
  • Construction materials management and quantity surveying on project site
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • Coordinate between consultant, client and subcontractors
  • Directed staffing requirements, managed priorities and coordinated workflows to uphold productivity objectives.

Akon Group Internation Construction
Dammam, Eastern Province

Civil Works Site Chief
2016.10 - 2017.05 (7 education.months_Label)

Job overview

Project Detail

Name: East Dammam Housing Project

Project Value : 65.000.000 USD

Client: Saudi Aramco

Project Management Consultant: Saudi Aramco

Project Detail;

The scope of Works are MEP , Finishing and landscaping works 218 premium villas for Saudi Aramco management personnel. having a total closed area of 104.000sqm.There are 7 type of villa having 3 decoration types sizing varying from to 700sqm.The total scope of works include 400.000m2 internal and external plastering/painting works, 100.000m2 roof installation works, HVAC electrical and plumbing works and 100.000m2 landscaping works.

Responsibilities

Coordinate between to civil, mechanical and electrical works installations.

  • Prepper to daily site installations report and send to site manager.
  • Check the design architectural, civil, electrical and mechanic projects controls.
  • Documented the entire phases of planning, designing, and construction phases.
  • ·Coordinate between consultant, client and subcontractors.

Akon Group International Construction
Yanbu, Medina Region

Site Engineer
2016.02 - 2016.10 (8 education.months_Label)

Job overview

Project Detail

Name: Yanbu Power and Desalination Plant Project

Project Value: 20.000.000 USD

Client: Kingdom of Saudi Arabia Saline Water Conversion Corporation

Project Management Consultant: Samsung Engineering

The Scope of Works include construction of totally 283,000m3 concrete works ( Aeration Basin, Retaining wall, Bypass line, Electrical and Transformer Building, Piperack Line )

Responsibilities

  • Earthworks ( cut and fill )
  • Water, electricity and telephone lines displaced jobs
  • Construction materials management and quantity surveying on the project site
  • Analyzed and monitored current structural design.
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • Coordinate between consultant, client and subcontractors

Akon Group International Construction
Erbil, Iraq

Site Engineer
2015.01 - 2016.02 (1 education.year_Label & 1 education.month_Label)

Job overview

Project Detail

Name: Khabat 2x150 MW Combined Cycle Power Plant, Unit 1&2

Project Value: 30.000.000 USD

Client: Ministry of Electricity (MOE) of Kurdistan Regional Government

Project Management Consultant: Posco Engineering and Construction Co., Ltd.

The Scope of Works include the foundation works package of 2*150 MW thermal power plant unit 1&2,consisting of a total of installation, base protection and select civil works for the following structures (Turbine Building, Steam Turbine foundation , Boiler, Electrostatic Precipitator, Cooling Tower, Absorber, Steam Converter, F.O. Heater, Ash Silo, Unit Auxiliary Transformer, Transformer, Limestone Unloading)

Responsibilities;

  • Earthworks ( cut and fill )
  • Water, electricity, and telephone lines displaced jobs
  • Construction materials management and quantity surveying on the project site
  • Analyzed and monitored current road systems
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work, and site activities
  • Coordinate between consultant, client and subcontractors

Kolin Construction
Hoima , Uganda

Site Engineer
2013.06 - 2014.09 (1 education.year_Label & 3 education.months_Label)

Job overview

Project Detail

Name: Hoima-Kaiso-Tonya Road (92km)

Project Value : 95.000.000 USD

Client: UNRA -Uganda National Roads Authority

Project Management Consultant: SGI ( Studio Galli İngegneria)

The Scope of Works include civil works for the upgrading of Hoima-Kaiso-Tonya Road (92km) to paved (Bituminous) standard. The mentioned project involves 3.2 million m3 earthworks, 900.000 tons of sub-base and base , 122 ea. pipe culverts, 8 ea. box culverts, 2 ea. bridges at length of 12 km and 24 km, and 300.000 tons of asphalt concrete pavement works for purpose of improvement of the standards of the current 92 km stabilized road from the city of Hoima to the cities Kaiso and Tonya and rehabilitation of the road to 2x1 lane asphalt road. This is one of the priority product of Uganda as it is located on the main route providing access to oil reserves of the country.

Responsibilities

  • Earthworks ( cut and fill )
  • Water, electricity and telephone lines displaced jobs
  • Construction materials management and quantity surveying on the project site
  • Analyzed and monitored current road systems
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • Coordinate between consultant, client and subcontractors

Eral Construction
Yalova, Turkey

Site Engineer
2012.06 - 2013.05 (11 education.months_Label)

Job overview

Project Detail

Name: Gebze-Orhangazi-Izmir Highway Project

Project Value: 7.500.000 USD

Client: NOMAYG

Project Management Consultant: Yuksel Project-Emay-Chodai

The Scope of Works includes displaced works (Box Culverts, Open Channels, Drain water line, wastewater line, Low voltage transmission line) of Gebze-Orhangazi 2nd Section (Km:8+411 to 19+213)

Responsibilities;

  • Earthworks ( cut and fill )
  • Water, electricity and telephone lines displaced jobs
  • Construction materials management and quantity surveying on the project site
  • Analyzed and monitored current road systems
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • · Coordinate between consultant, client and subcontractors

Gen-Yol Construction
Balikesir , Turkey

Site Engineer
2011.02 - 2011.10 (8 education.months_Label)

Job overview

Project Detail

Name: Balya Colliery

Project Value: 5.000.000 USD

The Scope of Works include open gallery decoupage works (10 Million m3 Earthworks )

Responsibilities

  • Earthworks ( cut and fill )
  • Water, electricity and telephone lines displaced jobs
  • Construction materials management and quantity surveying on project site
  • Analyzed and monitored current road systems
  • Documented the entire phases of planning, designing, and construction phases
  • Direct to subcontractors related to safety, quality, environmental, planning of work and site activities
  • Coordinate between consultant, client and subcontractors

Education

European University Of Lefke
Lefke/Cyprus

Bachelor's degree from Civil Engineer
2005.09 - 2010.06 (4 education.years_Label & 9 education.months_Label)

Skills

  • Project scheduling
  • Microsoft Office expertise
  • Scheduling and calendar management
  • Pricing
  • Documentation control
  • Workflow planning
  • Construction site management
  • Client relations
  • Cost estimations
  • AutoCAD
  • Primavera P6
  • MS Project
  • Project budgeting

Languages

Turkish
Native
English
Advanced
Arabic
Beginner

Certification

Advanced in Primavera P6

Timeline

Technical Office Manager

Yuksel Insaat Saudi Co.
2023.06 - Current (3 education.years_Label)

Technical Office Chief

Yuksel Insaat Saudia Co.
2023.06 - 2023.09 (3 education.months_Label)

Technical Office Chief

Balkar Construction
2023.03 - 2023.06 (3 education.months_Label)

Technical Office Engineer

Aluteks Construction
2022.04 - 2023.03 (11 education.months_Label)

Civil Works Chief

Dost Construction
2021.02 - 2022.03 (1 education.year_Label & 1 education.month_Label)

Civil Works Chief

Serka Construction
2018.05 - 2019.10 (1 education.year_Label & 5 education.months_Label)

Civil Works Site Chief

Akon Group Construction
2017.09 - 2018.05 (8 education.months_Label)

Civil Works Site Chief

Akon Group Internation Construction
2016.10 - 2017.05 (7 education.months_Label)

Site Engineer

Akon Group International Construction
2016.02 - 2016.10 (8 education.months_Label)

Site Engineer

Akon Group International Construction
2015.01 - 2016.02 (1 education.year_Label & 1 education.month_Label)

Site Engineer

Kolin Construction
2013.06 - 2014.09 (1 education.year_Label & 3 education.months_Label)

Site Engineer

Eral Construction
2012.06 - 2013.05 (11 education.months_Label)

Site Engineer

Gen-Yol Construction
2011.02 - 2011.10 (8 education.months_Label)

European University Of Lefke

Bachelor's degree from Civil Engineer
2005.09 - 2010.06 (4 education.years_Label & 9 education.months_Label)
Baris Elibol