Experienced Senior Project Manager offering 11+ years of HV Electrical substations management with history in business and on-sites construction and supervision . Educated yet down-to-earth and unafraid to get hands-on. gifted at meeting tight deadlines, driving business opportunities and working well in team-based environments. Engaging and personable to manage key milestones and deliver exemplary client service.
Lead More than 6 Substations 110/13.8KV with Value around 700Millons SAR and keeping all of it on track as progress and financially .
1-Lead the planning, designing, engineering and the implementation of substation projects as per scope of work and Saudi electricity company specifications with compliance master time schedule.
2- Manage project budget and project resource allocation.
3- Direct material planning, engineering, procurement, construction, purchase order and sub contract finalization.
4- Follow up with vendors in various countries for timely manufacturing of equipments, factory test (FAT) and shipment.
5- Constantly monitor and report on progress of the project to all stakeholders.
6- Present reports defining project progress, problems and solutions. 7- Implement and manage project changes and interventions to achieve project outputs.
8- Prepare & plan the financial projections for the project.
9- Coordination with client (Saudi Electricity Company), procurement, vendors, suppliers and manufacture.
10- Provide all requirements and facility for project site(manpower, petty cash, approved drawing, logistic service)
1.Lead site Activities along with Manpower& site resources .
2.Handle all site meetings with sub-contractors , consultants & client.
3.Follow up the project Milestone and keep the critical path activities on track to achieve the master schedule Dates .
4.Follow up the Quality of delivered material ,installation&T&C and supervise th quality team till close all related documents RMI , RFI & all punch points.
5.Coordinating with Technical and design Team to get and follow the approved design .
6.Confirm the SOW based on signed PO and signed contract documents .
• Designing M.V Electrical networks (with both types: overhead lines and UGC cables) .
• Live maintenance of medium voltage transmission lines.
• Designing L.V networks for consumers supply.
• Operating and maintenance the metering devices in both low and medium voltage networks.
• Operating and maintenance the Electrical connection of power transformers.
Project Scheduling
Closed and Energized Projects :
1- Construction ALKHALIDIYAH s/s project 110/13.8 kv, Madinah the awarded executive project of 2017 by NG .
2- Construction UMALSALAM s/s project 110/13.8 kv, JEDDAH.
3- Construction SARI s/s project 110/13.8 kv, JEDDAH.
4- Construction Tabuk housing s/s project 110/13.8 kv, Tabuk.
5- Construction Madinah housing s/s project 110/13.8 kv, Tabuk.
6- Construction ARAFAT-1 extension which energized within 7&half months as fastest project in Western area.
Primavera
Certified M.V live Line Maintenance, (16-09-2013 TO 10-10-2013) at National Electrical Power Co- Jordan
Travel
Reading
Listening to music
Certified M.V live Line Maintenance, (16-09-2013 TO 10-10-2013) at National Electrical Power Co- Jordan
Certified INSTALLATION AND TESTING TRANSMISSION POWER STATION ELEMENTS (Summer 2009) at National Electrical Power Co -Jordan.
Training on SPECIFICATION OF TRANSMISSION AND DISTRIBUTION NETWORKS (Summer 2009) at National Electrical Power Co- Jordan.
Certified OPERATION AND MAINTENANCE OF TRANSMISSION STATION (Summer 2009) at National Electrical Power Co -Jordan.
Certified POWER CABLES DESIGN (Summer 2009) at National Electrical Power Co - Jordan
Training onPROTECTION OF POWER STATION (Summer 2009) at National Electrical Power CoJordan.
PMP ®-Project Management Institute (PMI)