Summary
Overview
Work history
Education
Skills
Additional Information
Languages
Timeline
Generic
Belal Azmy Soliman

Belal Azmy Soliman

Mansoura,Egypt

Summary

I aspire to make remarkable contribution through my knowledge and skill towards the prosperity of the organization in which I will get a chance to show my potential. I seek career that provides challenges and allow me to learn new and proficiency. I am a rational individual striving to achieve excellence in whatever I do I would make all efforts to achieve expertise in the allied fields through continuous learning.

Overview

24
24
years of professional experience

Work history

General superintendent

Orascom CO
2019.06 - 1 1
  • 18 years' Experience In
  • Power Stations turbines (simple cycle& combined cycle)
  • Oil & Gas Projects in the Function of Technical
  • Mechanical Rotating and Static
  • Installation, maintenance& commissioning all types of Turbine, generator, pumps, valves, , filters, blowers, fans, compressors, diesel engine, pipe line
  • Testing, hydrostatic test, flushing by air, leak test by air “leak test by nitrogen &purging"
  • Cleaning, assembly, installation and alignment Pedestal turbine
  • Cleaning, assembly, installation and alignment of parts of the turbine high- pressure and medium pressure and low pressure
  • Connect and assemble the parts turbine shafts
  • To do principled operating turbines
  • The work of the necessary equipment for the process blowing steam
  • Steam valves to the stage blow steam processing
  • Installation and cleaning Loeb Oil Tank and the mobilization of its oil
  • Complete the process of flashing the oil pipes
  • Do all the work required for the turbine generator and processing tests crisis of the cooling system
  • Cleaning and processing of the generator shaft and admitted to do the right way
  • To compile and install and clean, and the alignment of all skids and turbine pumps
  • Installation and assembly of the fire system and thermal insulation for your turbine, Abo -Rewash water treatment station company

General superintendent

Orascom CO
2017.05 - 2019.01
  • Project: EL-Burllus power plant 4800mw

Mechanical Supervisor

Orascom Construction PLC
Project oil refinery Mostord – Cairo (E R C), Egypt
2016.05 - 2023.05
  • Ensured site rules and regulations were adhered to for optimum employee safety.
  • Oversaw all areas of project, particularly experienced in [Type], [Type] processes.
  • Efficiently managed team of [Number] [Job title], ensuring work was consistently high quality in order to reach production targets.
  • Anticipated potential problems or risks and adapted plans accordingly to avoid error or delay.

Piping Foreman

AL-Basmala
Ain Sokhna Air Liquide Chinese Company Gushie
2016.04 - 2016.05
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Ramco Contracting and mechanical fixtures
Al-Masryeen Steel Factory
2015.05 - 2016.02
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Al-Zoor Electric station
Elghanim International, Kuwait
2014.09 - 2015.05
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Maryot Ezz Steel
EzzSteel , Ain Sukhna, Egypt
2014.08 - 2014.09
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Pipe Fabricator

Elghanim International
Al-Ahmadie Petrol Station, Kuwait
2014.05 - 2014.07
  • Carefully and accurately assembled [Type] components to create [Type] sculptural products.
  • Read and fabricated [Type] products from [Type] engineering drawings, achieving accurate, timely results.
  • Trained and mentored junior coppersmiths in various metalwork processes.
  • Utilised [Technique] and [Technique] to manufacture [Type] products to detailed design specifications.

Piping Foreman

Beshay Steel group
Al-Sadat Factory for Steel, Egypt
2013.09 - 2014.05
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Metito Water Treatment Company
Banha Power Plant Project , Egypt
2013.04 - 2013.08
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Metito Water Treatment Company
Giza North Power Plant Project , Al-Qatta, Egypt
2013.03 - 2013.04
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Taregt Constracting Company
Madinty , Firefighting system , Egypt
2011.08 - 2013.03
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

UHDE EMBC Project Iemsa
Agreom , Demitta, Egypt
2011.05 - 2011.07
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Elghanim International
Al-Sababeya power Plant, Kuwait
2010.09 - 2011.05
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Techint Cimi Montubi Company
Methanol Project Demitta
2009.12 - 2010.09
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Ouda Company
Perlemoen Port-Said, Egypt
2009.10 - 2009.12
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Gulfpiping Co - W.L.L
Nigeria Oil and Gas , United Arab Emirates
2008.07 - 2009.08
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Petroment Company
Khalda Al-Salam Petroleum Project , Egypt
2008.05 - 2008.07
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Fabricator

Ccic Company
Qatar Gas , Qatar
2007.10 - 2008.04
  • Inspected welded projects to verify alignment with blueprint specifications.
  • Moved machinery using forklifts, cranes and hoists.
  • Read and interpreted blueprints, sketches and specifications and set up [Type] machines prior to beginning work.
  • Inspected workplace equipment every [Timeframe] to identify maintenance requirements.

Pipe Fabricator

Al Kharafi Nationa
The Development And Expansion Of Petrol Stations , Balbrkan - Kuwait
2006.03 - 2007.08
  • Carefully and accurately assembled [Type] components to create [Type] sculptural products.
  • Read and fabricated [Type] products from [Type] engineering drawings, achieving accurate, timely results.
  • Trained and mentored junior coppersmiths in various metalwork processes.
  • Utilised [Technique] and [Technique] to manufacture [Type] products to detailed design specifications.

Piping Foreman

Al Hashmiah Constracting Company
Mansoura Electric Station Project, Egypt
2006.01 - 2006.02
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Al Hashmiah Constracting Company
Suez Port Project, Egypt
2005.10 - 2006.01
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Al Hashmiah Constracting Company
Steam Boilers , Al-Hawamdeya, Egypt
2005.08 - 2005.10
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Boosted [Timeframe] performance by [Number]%, by helping a team of [Number] plumbers complete their installation tasks.
  • Dug [Number] drainage ditches per [Timeframe], speeding up pipe laying projects by [Number]%.

Piping Foreman

Al Hashmiah Constracting Company
Abu Madi Gas Station, Egypt
2005.05 - 2005.08
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Extended overall pipe lifespans, by ordering [Number] new pipe parts every [Timeframe].
  • Installed [Number] new pipe connections improving accessibility by [Number]%.
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.

Piping Foreman

Bonatti Libyan Branch
Mellitah Oil & Gas B. V. Libyan, Egypt
2004.12 - 2005.04
  • Allowed cleaning, coating and wrapping operations to proceed uninterrupted by helping [Job title]s operate [Type] levers.
  • Extended overall pipe lifespans, by ordering [Number] new pipe parts every [Timeframe].
  • Installed [Number] new pipe connections improving accessibility by [Number]%.
  • Improved the laminar and turbulent flow in [Number]s of pipelines with the use of [Type] blasting equipment.

Pipe Fitter

Dodsal Company
Demitta Liquid Oil Project, Egyot
2002.11 - 2004.04
  • Prepared pipelines, pipework preparation and fitting to high standards and ahead of agreed timescales.
  • Expertly installed range of metal, galvanised and steel pipes in line with project deadlines.
  • Facilitated timely project completion by liaising with colleagues and contractors effectively.
  • Applied safe work methods across all phases of installations.

Pipe Fitter

Techint Cimi - Montubi Company
Port Said East Power Station Palooza., Egypt
2001.09 - 2002.09
  • Prepared pipelines, pipework preparation and fitting to high standards and ahead of agreed timescales.
  • Expertly installed range of metal, galvanised and steel pipes in line with project deadlines.
  • Facilitated timely project completion by liaising with colleagues and contractors effectively.
  • Applied safe work methods across all phases of installations.

Pipe Fitter

ABB Company
West Mansoura Water Treatment Plant. , Egypt
2000.04 - 2001.07
  • Prepared pipelines, pipework preparation and fitting to high standards and ahead of agreed timescales.
  • Expertly installed range of metal, galvanised and steel pipes in line with project deadlines.
  • Facilitated timely project completion by liaising with colleagues and contractors effectively.
  • Applied safe work methods across all phases of installations.

Pipe Fitter

Daelim Company Middle East Oil Refinery
Midor Project, Egypt
1999.01 - 2000.05
  • Prepared pipelines, pipework preparation and fitting to high standards and ahead of agreed timescales.
  • Expertly installed range of metal, galvanised and steel pipes in line with project deadlines.
  • Facilitated timely project completion by liaising with colleagues and contractors effectively.
  • Applied safe work methods across all phases of installations.

Education

Diploma - Industrial Technical School

Mansoura
Egypt

Skills

  • Expertise in mechanical systems
  • power Stations turbines (simple cycle& combined cycle)
  • Oil & Gas Projects in the Function of Technical
  • Mechanical Rotating and Static Installation, maintenance& commissioning all types of Turbine, generator, pumps, valves, , filters, blowers, fans, compressors, diesel engine, pipe line
  • Testing, hydrostatic test, flushing by air, leak test by air “leak test by nitrogen &purging" Cleaning, assembly, installation and alignment Pedestal turbine
  • Cleaning, assembly, installation and alignment of parts of the turbine high- pressure and medium pressure and low pressure
  • Connect and assemble the parts turbine shafts
  • To do principled operating turbines
  • The work of the necessary equipment for the process blowing steam
  • Steam valves to the stage blow steam processing
  • Installation and cleaning Loeb Oil Tank and the mobilization of its oil
  • Complete the process of flashing the oil pipes
  • Do all the work required for the turbine generator and processing tests crisis of the cooling system
  • Cleaning and processing of the generator shaft and admitted to do the right way
  • To compile and install and clean, and the alignment of all skids and turbine pumps
  • Installation and assembly of the fire system and thermal insulation for your turbine
  • Team-management
  • Constructive problem-solving
  • Inspection management
  • Life-cycle project supervision

Additional Information

  • married fulfilled Egyptian

Languages

Arabic
Native
English
Intermediate
Urdu
Beginner

Timeline

General superintendent

Orascom CO
2019.06 - 1 1

General superintendent

Orascom CO
2017.05 - 2019.01

Mechanical Supervisor

Orascom Construction PLC
2016.05 - 2023.05

Piping Foreman

AL-Basmala
2016.04 - 2016.05

Piping Foreman

Ramco Contracting and mechanical fixtures
2015.05 - 2016.02

Piping Foreman

Al-Zoor Electric station
2014.09 - 2015.05

Piping Foreman

Maryot Ezz Steel
2014.08 - 2014.09

Pipe Fabricator

Elghanim International
2014.05 - 2014.07

Piping Foreman

Beshay Steel group
2013.09 - 2014.05

Piping Foreman

Metito Water Treatment Company
2013.04 - 2013.08

Piping Foreman

Metito Water Treatment Company
2013.03 - 2013.04

Piping Foreman

Taregt Constracting Company
2011.08 - 2013.03

Piping Foreman

UHDE EMBC Project Iemsa
2011.05 - 2011.07

Piping Foreman

Elghanim International
2010.09 - 2011.05

Piping Foreman

Techint Cimi Montubi Company
2009.12 - 2010.09

Piping Foreman

Ouda Company
2009.10 - 2009.12

Piping Foreman

Gulfpiping Co - W.L.L
2008.07 - 2009.08

Piping Foreman

Petroment Company
2008.05 - 2008.07

Piping Fabricator

Ccic Company
2007.10 - 2008.04

Pipe Fabricator

Al Kharafi Nationa
2006.03 - 2007.08

Piping Foreman

Al Hashmiah Constracting Company
2006.01 - 2006.02

Piping Foreman

Al Hashmiah Constracting Company
2005.10 - 2006.01

Piping Foreman

Al Hashmiah Constracting Company
2005.08 - 2005.10

Piping Foreman

Al Hashmiah Constracting Company
2005.05 - 2005.08

Piping Foreman

Bonatti Libyan Branch
2004.12 - 2005.04

Pipe Fitter

Dodsal Company
2002.11 - 2004.04

Pipe Fitter

Techint Cimi - Montubi Company
2001.09 - 2002.09

Pipe Fitter

ABB Company
2000.04 - 2001.07

Pipe Fitter

Daelim Company Middle East Oil Refinery
1999.01 - 2000.05

Diploma - Industrial Technical School

Mansoura
Belal Azmy Soliman