Bruce Noble

Wynn Vale

Summary


Self-directed Electrical Mechanic skilled in reading and interpreting electrical and mechanical layout diagrams, specifications and drawings. Hands-on experience connecting circuit breakers, contactors, soft-starters and VFD's. Over 10 years of experience in panel layout & mounting, panel wiring and final assembly.


Flexible options to work full time, part time, month to month, flexible in accordance with variations in work load and forward orders.

Overview

23
23
years of professional experience
1
1
Certification

Work History

Platform Safety CoOrdinator

Starr International
04.2022 - Current
  • Assisted in implementing safety protocols and procedures.
  • Monitored compliance with regulatory safety standards.
  • Conducted routine inspections to identify potential hazards on Naval Vessels under construction.
  • Osborne Shipyard,

Fire Safety Officer

SA Metropolitan Fire Service
02.2013 - 12.2021


  • Reviewed building design plans and provided expert advice on electrical control systems for fire pump, smoke ventilation & HVAC controls.
  • Provided guidance on the selection and placement of appropriate firefighting equipment within facilities for maximum effectiveness.
  • Assessed the impact of proposed changes in facility operations on fire safety standards and offered recommendations accordingly.
  • Identified safety concerns and documentable Fire Standard violations in new constructions and existing structures.

Electrical Fitter Mechanic

Grundfos Pumps
01.2003 - 01.2013
  • Installed electrical systems and components in compliance with safety standards to build a range of control panels for individual and multi-pump systems.
  • DOL, Star-Delta, Primary Resistance, Soft Starter and VFD control, with Float, Pressure or Flow parameters overseen by Smart Relay or PLC with HMI Displays
  • Assembled multiple Rittal modules to form large Pump Systems with Busbar distribution up to 6x150kW VFD Hydro-MPC systems
  • Interpreted technical drawings and schematics to execute control panel construction accurately.
  • Collaborated with team members to optimize workflow efficiency during projects.
  • Assisted in the development of technical manuals and instructional materials for use among other technicians.
  • Read electrical, architectural and mechanical diagrams, drawings or specifications to determine job requirements.
  • Also involved in Designing & Drafting single & multi-pump systems utilising E-Plan and AutoCAD to produce circuitry, panel layouts and material parts lists.

Education

Graduate Certificate - Performance Based Building & Fire Codes

Victoria University
Melbourne, VIC
04-2014

Skills

    - Extensive experience in reading panel layout drawings

    - Well versed in reading Power and Control circuitry diagrams

    - Assembly of modular Rittal and B&R control panels

    - Experienced in laying out Din Rail, Cable Ducting, mounting large components via Drill & Tapping

    - Installing proprietary busbar distribution for large capacity Pump Systems

    - Installing power cabling from Main Isolating Switch, to Motor C/B's, Contactors via motor protection CT's to Pump Terminals

    - Installing control wiring between sensor inputs, A/M switches, PLC, HMI, external Comms systems and audio visual indication and warning devices

    - Extensive experience in the use of hand & power tools, mounting of HMI panels and escutcheon plates within panels

    - Experience with E-Plan & AutoCad drafting systems to facilitate drawing editing and layouts

Certification

White Card

First Aid & CPR Certificate

Manage Small Emergencies in the Workplace Certificate


Timeline

Platform Safety CoOrdinator

Starr International
04.2022 - Current

Fire Safety Officer

SA Metropolitan Fire Service
02.2013 - 12.2021

Electrical Fitter Mechanic

Grundfos Pumps
01.2003 - 01.2013

Graduate Certificate - Performance Based Building & Fire Codes

Victoria University

'A' Class Electrical Workers Licence

Wide range of construction experience building a range of electrical control panels for Grundfos Pumps, Regency Park.

Involved commencing with a pallet load of components and an empty control panel or a group of modules to assemble into a multi-panel system.

Needed to remove the internal mounting plate, layout all the components, mount large components such as contactors, soft starters & VFD's, then mount DIN rail & cable ducting, add all components and terminals to the DIN rails.

Commence installing power and control cabling to allow access to ancillary inputs on large components such as VFD's, and then complete balance of cabling, allowing for cabling to door (or escutcheon) mounted controls and displays.

Insert mounting panel into cubicle, and once control switches and HMI displays are mounted on the front panel, complete the final control wiring.

Instal Main Isolating Switch 'Handle' once the wiring is completed. Check test 'point-to-point' for wiring errors and arrange for functional testing and PLC programming.

Bruce Noble