Summary
Overview
Work History
Education
Skills
Projects
Languages
Certification
References
Timeline
Generic
Kashif Latif

Kashif Latif

KSA

Summary

I am seeking a challenging position in an environment where I can use my education, experience, and character to make a valuable contribution to the wholesome growth of the organisation and my personality.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Pumping Station Supervisor

RTCC
2022.04 - Current

KEY RESPONSIBILITIES
.Operations Oversight - Supervise and coordinate the daily operations of pumping stations to ensure continuous and efficient water delivery.
. Staff Supervision - Train, assign, schedule, and evaluate staff; promote a safe, productive, and team-oriented work environment.
.System Monitoring - Monitor pump performance, flow, pressure, and water levels; adjust operations as needed to meet system demands.
.Equipment Reliability - Ensure proper operation of pumps, motors, PLCs, SCADA systems, and related mechanical and electrical equipment.
.Emergency Response - Respond to alarms, system upsets, and emergencies; coordinate repairs and restore normal operations promptly.


Electrical Supervisor

Perimum Developer Lyall Pur Galleria
2019.05 - 2022.04


.Supervise daily operation, inspection, and maintenance of all electrical systems including LV/MV panels, transformers, generators, lighting systems, and UPS.
.Ensure uninterrupted power supply to all mall areas.
Monitor electrical loads and energy consumption to optimize efficiency.
.Lead and manage electricians and technicians, assigning tasks and monitoring performance.
Provide technical guidance and on-the-job training to staff.
.Preventive & Corrective Maintenance
.Enforce use of PPE and safe work practices.
Coordinate emergency procedures for power failures or electrical hazards.


Pumping Station Operator

Saudi Service For Electro Mechanics works Co.Ltd
2014.02 - 2019.03

Operate and monitor water pumping equipment, including pumps, motors, valves, and control systems to ensure continuous water supply.
Start, stop, and adjust pumps and related equipment based on system demand and operational requirements.
Monitor pressure levels, flow rates, reservoir levels, and system performance using SCADA(ABB800XA) or manual gauges.
Perform routine inspections of pumping station facilities to detect leaks, abnormal vibrations, noise, or equipment faults.
Carry out basic preventive maintenance such as lubrication, cleaning, and minor repairs of pumps and mechanical components.
Record operational data, including pump readings, energy consumption, and maintenance activities in logbooks or digital systems.
Respond to alarms, system failures, and emergencies promptly to minimize downtime and ensure safe operation.

Education

B.Tech - Electrical Engineering

Preston University Islamabad Campus
2013-05

Diploma of Associate Engineer - Electrical

Govt College Of Technology Faisalabad
2006-05

Skills

  • Communication
  • Problem Solving
  • Teamwork
  • Teamwork Player
  • Emergency response
  • Technical guidance

Projects

  • 2025 TO PRESENT SWCC EASTREN-3 WTS PROJECT PS SUPERVISOR
  • 2022-2025 , SWCC SHUQAIQ ABHA WTS PROJECT, PS Supervisor
  • 2019-2022, LYALLPUR GALLERIA PROJECT, Electrical Supervisor
  • 2014-2019-, SWCC SHOAIBA JEDDAH WTS PROJECT, Control Room Operator

Languages

English
Advanced
C1
Urdu
Proficient
C2
Arabic
Intermediate
B1

Certification

Black Hat(Neom Safety program)

References

  • Engineer Ahmed Rabbi
  • Project manager RTCC( swcc WTS eastren-3 jubail)
  • MOB#0531115302

Timeline

Pumping Station Supervisor

RTCC
2022.04 - Current

Electrical Supervisor

Perimum Developer Lyall Pur Galleria
2019.05 - 2022.04

Pumping Station Operator

Saudi Service For Electro Mechanics works Co.Ltd
2014.02 - 2019.03

B.Tech - Electrical Engineering

Preston University Islamabad Campus

Diploma of Associate Engineer - Electrical

Govt College Of Technology Faisalabad
Kashif Latif