Summary
Overview
Work History
Education
Timeline
Generic

Deepak Kumar

Summary

MECHANICAL MAINTENANCE, ASSIST. MANAGER- POWER PLANT Seeking challenging assignment across the industry B.E. (Mechanical Engineering) & PGDC (TPPE) from NPTI (New Delhi) with experience of 12 years across the Industry. Implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipments and maintaining requisite documents for the same. Capable of grasping new technical concepts quickly & utilizing it in a productive manner. Potential in handling multiple tasks & meeting deadlines in high pressure environments.

Overview

8
8
years of professional experience
1
1
Language

Work History

Sr. Executive

09.2019
  • With KEPCO-KPS (O&M Site), HZL, Dariba, Rajasthan
  • (Boiler Maintenance)
  • Power Plant Capacity: - 2x80 MW (PF Boiler, BHEL-MAKE) (1x320 TPH, Working pressure 94 kg/cm2, Temp-540±5C)

Sr. Executive

WARTSILA India Pvt ltd
Dariba
10.2017
  • M Site), HZL
  • (Boiler Maintenance)
  • Power Plant Capacity: - 2x80 MW (PF Boiler, BHEL-MAKE) (1x320 TPH, Working pressure 94 kg/cm2, Temp-540±5C)

Assist. Manager

Powermech Projects ltd
1 1
  • M Site), JITPL, Angul
  • Odisha.(Boiler Maintenance)
  • Power Plant Capacity: - 2x600 MW (PF Boiler, BHEL-MAKE) (1x1830 TPH, Working pressure 178 kg/cm2, Temp-570±5C)
  • ROLES & RESPONSIBILITIES Maintenance of Boiler & all auxiliaries related to Boiler
  • Maintenance of Rotary parts such as PA, FD & ID Fan, APH, Seal air fan & Scanner Air Fan
  • Maintenance of Coal Mill (Bowl Mill-XRP-1103), Mill Rejection System, Coal feeders
  • Maintenance of Pressure parts & Non-pressure parts
  • Preparing reports in SAP, implementing Kaizen, SGA, and FIP
  • Maintenance of Ducts, Gates & dampers, Wall Blower & LRSB
  • Maintenance of ESP rapping mechanism system of emitting & collecting electrodes & FOPH area
  • Planning, scheduling, supervision & execution of routine / predictive / preventive / shut down maintenance schedules for machinery so as to increase machine up-time / equipment reliability
  • Generating maintenance reports and maintaining equipment history records
  • Attending the daily planning meeting for clearing the defects
  • Suggesting & implementing modification for plant betterment
  • Maintaining all records/logs/certificates are maintained and updated to provide evidence of terminal conformance to client such as Daily/Monthly/Annual reports, Pressure parts failure reports, RCA, CBM reports, Overhauling reports, PM history, SMP, Alignment protocols, etc
  • Participated in the alignment & balancing of different rotary equipments
  • Monitor maintenance work for compliance with Permit to work (PTW) and company standards
  • Planning and sending the procurement requisitions of spares, tools, consumables and other necessary materials required during the maintenance of power plant to procurement department
  • Adhering to Safety, Environment and Health standards in all functional areas and developed & implemented measures for enhancing safety levels.

Boiler

02.2017 - 10.2017
  • Power Plant Capacity: - 2x660 MW (PF, , Shanghai Boiler Works-MAKE) (1x2111 TPH, Working pressure 259 kg/cm2, Temp-571±5C)

Sr. Engineer

Power Mech Projects Limited
03.2014 - 10.2017
  • O&M Site), in different locations, APRL, Kawai, Rajasthan
  • (Boiler Maintenance)

Engineer

Precision Engineering Limited
08.2009 - 03.2012
  • (Mech
  • Maintenance, Boiler)Power Plant Capacity: MW Co-generation3 X 30 Power Plant, PFBC Boiler - 1 X

Education

PG Diploma - Thermal Power Plant Engineering

TPH, National Power Training Institute, Power
Huaguang, New, Delhi

B.E - Mechanical

AVIT, Vinayaka Mission University

Intermediate: 12th - undefined

B.I.E.C

Matriculation: 10th - undefined

N.O.S Board
New, Delhi

Passed Business English Certificate examination, conducted by ESOL - undefined

University of Cambridge

Timeline

Sr. Executive

09.2019

Sr. Executive

WARTSILA India Pvt ltd
10.2017

Boiler

02.2017 - 10.2017

Sr. Engineer

Power Mech Projects Limited
03.2014 - 10.2017

Engineer

Precision Engineering Limited
08.2009 - 03.2012

PG Diploma - Thermal Power Plant Engineering

TPH, National Power Training Institute, Power

B.E - Mechanical

AVIT, Vinayaka Mission University

Intermediate: 12th - undefined

B.I.E.C

Matriculation: 10th - undefined

N.O.S Board

Passed Business English Certificate examination, conducted by ESOL - undefined

University of Cambridge

Assist. Manager

Powermech Projects ltd
1 1
Deepak Kumar