Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Personal Information
Awards
Languages
Timeline
Generic
JAGADISH A. SHETTY

JAGADISH A. SHETTY

Al Jubail

Summary

Results-driven PMP certified Project Engineer with over 28 years of extensive experience in green and brown field Project Management within the oil & petrochemical industry. Specializing in portfolio management, Industrial, petrochemical and refinery Construction Management, Site Operations, and Contract Management across India and the Middle East. Possessing professional knowledge and deep expertise in project management, procurement processes, cost estimation, tender document preparation, technical evaluation, contracts management, FEED preparation, AFE packages creation for capital projects, budget forecasting, and monitoring actual spending. Demonstrated ability to lead cross-functional teams effectively, ensuring timely project delivery within budget constraints. Skilled in problem-solving, resource allocation, and stakeholder communication with a proven track record of consistent performance under high-pressure environments.

Overview

31
31
years of professional experience
1
1
Certification

Work History

Senior Project Engineer

Saudi Chevron Phillips (S-Chem)
03.2015 - Current
  • Company Overview: S-Chem is producing several types of chemicals like Ethylene, Polyethylene, Propylene, Polypropylene, Benzene, Ethylbenzene, Hexane, Cyclohexane, Pygas and Mogas.
  • Independently managing multiple projects (mechanical/E&I/civil) inside the S-Chem plant as per the requirements from the end user departments and each project values varies from USD 1.5 M to 10.00 M.
  • Part of my responsibility I need to understand the technical specifications and technical composition of each product while executing the projects related to respective production plant.
  • I am responsible to develop the Front-End Engineering Design (FEED) which includes project requirements or preliminary project scope, P&ID's and PFD's markups, piping tie-in location identification, plot plan markings, identification of high-level project risks or hazards, preliminary project cost estimates (±50%), preliminary project schedule or milestones (level 1), and required project material specifications and standards to be considered during the detailed engineering phase.
  • Current responsibilities include project execution through CPDEP process, issuance of weekly and monthly project reports to stakeholders, Design, constructability & HAZOP reviews, preparation of project frames, scopes, estimates, schedules, GRT presentations AFD's, AFE's & project execution plan and manage the MOC's and Pre-Startup Safety Review (PSSR).
  • Current responsibilities include develop the project assurance plan, project standards and specifications related to the particular project, project specific safety plan and develop the project execution plan including the capital budget forecasting and monitoring regularly.
  • Responsibility includes to ensure the periodic inspection and structural integrity of all the plant structures like pipe racks, pipe supports, equipment foundations, RCC cooling towers, control buildings, substation building, warehouse buildings and underground concrete structures.
  • Successfully completed automatic fixed water protection for the Aromax process pumps (14 Nos). This project includes installation for automatic fixed water spray skids, U/G and above ground fire water lines installation (around 1200 M) and its DCS configuration.
  • Successfully completed fire panel alarm, HVAC panel and PDT DCS configuration at central control rooms (4 nos.) as part of safe haven project.
  • Good experience in review and development of sheets related to various instruments, control valves, process equipment's and process pumps.
  • Good experience in concrete structures (RCC) integrity inspection and concrete repair works using modern technologies. I have involved in major concrete structures like sea water sumps, oily water underground sumps, RCC cooling towers repair works in the plant. We have used advanced modern technologies to identify the deficiencies in RCC structure and quick setting chemical components for the repair works.
  • Successfully completed replacement of number of process exchangers. Reboilers and process pumps, control valves, different types of analyzers, XV's, flow, pressure, and temperature transmitters in different production plants.
  • Successfully completed upgrading of old flow computers / SCADA system for metering skids, replacement of the old turbine meters with new Coriolis meters, and replacement of compressor motor (9000 HP).
  • Successfully completed number of major plant turnaround activities (SPCO, SCP and JCP) including plant start up works. Estimated total cost of each turnaround is around 150 million US dollars and total manpower worked during the turnaround period was around 8000 people.
  • S-Chem is producing several types of chemicals like Ethylene, Polyethylene, Propylene, Polypropylene, Benzene, Ethylbenzene, Hexane, Cyclohexane, Pygas and Mogas.

Senior Project Engineer

Saudi Iron & Steel Co. Ltd. (HADEED/SABIC)
02.2011 - 02.2015
  • Independently handled several infra structure and expansion projects inside the HADEED plant as per the requirements from the end user departments and each project values varies from $ 2.0 M to $ 30 M.
  • I was responsible to prepare the Front-End Engineering Design (FEED) package based on the project scope requirements. FEED package includes project scope, material specifications, identification of underground facilities, preparation of initial cost estimation and preliminary project milestones, plot plan marking for the proposed project location, identification of utility connections tie-in locations and identification of engineering deliverables in each discipline. FEED package includes preliminary risk assessment and HAZOP study reports and project feasibility study reports as well.
  • During this period, I was involved in the plant structural integrity program. My responsibility was review of Inspection Test Plans (ITP), construction method of statements, periodic inspection of all the plant structures like equipment foundations, furnaces, refractories, utility structures, underground sumps, and manholes, all the plant buildings, pipe racks structural members and pipe support foundations and fireproof concrete as well. Structural integrity inspection will be conducted according to the approved inspection checklists and rectification recommendations will be provided based on the technical evaluation. I was responsible for civil contracts management which are related to excavation, rebar and RCC works.
  • Successfully completed number of the concrete structures (RCC) repairs works like buildings, support foundations, underground sumps and dike walls. Concrete repair works was carried out using various modern technologies, equipment's and chemicals.
  • Successfully completed renovation of utility process control room. This job involves renovation of DCS consoles, replacement of process cables and power cables (both HV and LV), upgrading of power panels and installation of fire gas suppression system (foam) and related fire alarm panel installation and fire alarm configuration.
  • Worked in HADEED Long Product Expansion (HLPE) Project. This is a mega project and total project value is around 550.0 million USD. I was worked in this project as client (owner) representative and my main responsibilities are final inspections of all the facilities like administration and office buildings, furnace areas, fume ducts, process areas, scale pits, warehouses (prefabricated buildings) and refractory storage areas (prefabricated buildings), Alloy Storage building (prefabricated buildings) electrical substations, hydraulic rooms, equipment foundations, steel structures and pipe racks, all the underground and above ground utilities, walkways and internal roads etc. final walkthrough with the PMT team, raising and closing punch points, review of project close out documents and contractual issues.
  • Apart from the above project I have successfully executed many other infrastructure projects like construction of three admin buildings, fabrications shops, fire station, process water station building and expansion of ISD building. Each project value varies between $ 4.0 M - $ 10.0 M.

Construction Manager

M.S. Al Suwaidi Industrial Services Ltd.
12.2008 - 01.2011
  • Worked on the Northern Area Wastewater System Upgrade Project for Saudi Aramco with total value of around USD 120 million.
  • The purpose of this project is to upgrade the existing oily water sewer system and the sanitary system by replacing the existing CS pipes by higher size diameter RTR pipes, by replacing new self-priming pumps, by installing new sewage treatment plant. This project involves related electrical and instrument jobs as well.
  • It involves construction of many major structures like, control buildings, sewage treatment plant building, oily water lift stations, oily sewer manholes, and sanitary sewer manholes, valve boxes, decant and effluent storage tanks fabrication and installation, construction of evaporation ponds and skimmer chambers and neutralization pits or chambers. Installation of U/G oily water and sewage pipelines, API separators, Membrane Bioreactors (MBR), submersible/self-priming horizontal pumps, pipe supports and pipe rack foundations, construction of storm water drains are part of this project.

Senior Manager

Sterling Projects and Engineering Limited (SPEL)
02.2007 - 12.2008
  • Worked as pan India Civil and Quality Head in telecom infrastructure projects.
  • Played a key role in the successful execution of over 6000 mobile towers across all Indian states.
  • Managed complete activities like EB connection to site, secured DG PCB NOC from local government, obtaining municipal approvals, conducting Final Acceptance Test (FAT), preparation of site hand over documents and actual site handover to client.

Project Manager

Khalid S. Al-Shahrani Est.
03.2001 - 12.2006
  • I was Managing multiple medium size projects at a time in several locations in kingdom for major clients like Saudi Aramco, SABIC. Each project value varies from $ 1.0 M - $ 5.0 M.
  • I was responsible to prepare both technical and commercial proposals, risk assessment, additional work claims, commercial negotiation with clients and project procurement.
  • Successfully completed offshore platform design supply and installation for Saudi Aramco rigs (4 nos) in Safaniyah and Tanajib area (Zulf offshore). Modification of offshore platforms are part of this project scope.
  • Upgrading of Wastewater Treatment Facilities at RT Terminal South, North and JTTF, Mobile Communication Disaster Recovery Facility at Dhahran Aramco, Al-Hassa Bulk Plant Civil Works, 8" Raw Water Line Replacement at DH Aramco Utility, Ras Tanura and Juymah offshore platforms repair and maintenance, construction of HS-FCC Demonstration plant (Chiyoda), are some of the key projects are completed under my control.
  • During this period have efficiently executed the role of Business Development Manager as well.

Quantity Survey Engineer / Site Engineer

Dywidag Saudi Arabia co. Ltd.
10.1998 - 12.2000
  • During this period, I have worked in Petrokemya (SABIC) Olefins III Expansion Mega Project. Our client is Petrokemya is one of the SABIC affiliate and this project value is USD 250 Million. Project consultant was Saudi Arabian Parsons Ltd. and Mitsui Engineering & Shipping Arabia Ltd.
  • Initially I have worked as QS engineer and my responsibility was material quantity take off as per the IFC drawing, compute the actual site quantity based on the daily progress, subcontractor invoice quantity verification and helping project control team.
  • Later I have worked as site engineer and efficiently handled construction of over 2000 structural foundations, substations, process control building, analyzer building, Storm water and rainwater ditches, Concrete dike walls around the chemical storage tanks.

Assistant Engineer

Padmashree Constructions
11.1995 - 07.1998
  • Handled the Sugarcane Factory Building Project in Bangaluru, a major industrial building for Larsen & Tubro Ltd., worth USD 8.50 Million.
  • As part of the project, handled work supervision, preparing the re-bar scheduling for advance procurement, material quantity estimation, invoice submission, and erection of precast beams, structural roof beams and roof & wall cladding.

Trainee Engineer

Bhagheeratha Engineering Ltd.
10.1994 - 10.1995
  • Worked on Konkan Railway Project as Trainee engineer. It is cut and cover tunnel project with total length of the tunnel being 950 meters. Completed the project in record period of 12 months.
  • Project involves earth work, tunnel reinforcement beams installation, form works and concreting.
  • Involved in the day-to-day project activity monitoring and controlling, progress reporting, contractor invoice quantity verification and approval, QA/QC inspections coordination as per the ITP from the third-party consultants.

Education

Bachelor's degree - civil engineering

Karnataka University
01.1995

Skills

  • Project management
  • Construction management
  • Civil Engineering
  • Project cost estimation
  • Budget preparation & forecast
  • Design & drawings review
  • Contracts management
  • Project procurement process
  • Risk assessment & claims
  • Portfolio Management
  • Structural Integrity / reliability
  • MS Office
  • Proficient in Visio
  • Experience with SAP systems
  • Smart plant
  • SAP Ariba
  • Vendor technical bid evaluation (TBE)
  • Planning & Scheduling
  • Wastewater management
  • Sub-contractor/vendor commercial negotiation
  • Design review
  • Site management
  • Engineering design development
  • Proposal development
  • Risk assessment
  • Feasibility analysis
  • Schedule management
  • Contract management
  • Subcontracting management
  • Civil engineering
  • SOW development
  • Cost management
  • Root-cause analysis

Accomplishments

  • Collaborated with team of 10-12 persons in the development of no. of projects in S-Chem.
  • Documented and resolved no. of project issues related to engineering, procurement and project execution which led to successful completion of project within the allocated budget and agreed project schedule.
  • Achieved two days saving of plant start-up/shutdown time by introducing motorized double block and bleeder to (24") one of the process reactor (R-1300) at SCP plant.
  • Achieved timely delivery of one of compressor motor (KM-1500) from US to S-Chem plant at Saudi Arabia by close monitoring of the motor manufacture and effective coordination with vendor and logistic steam.
  • Supervised team of 15 staff members.
  • Effectively used MS office tools and other software's for the project progress monitoring and control.

Certification

  • Project Management Professional (PMP), Completed, 04/30/24
  • PM 100 Project Management training from CP Chem, Completed
  • Strategic Risk Management Training from Educate 360, Completed
  • Member of Saudi Council of Engineers, Active, 119758
  • Business Writing Training from Spearhead Training, Completed
  • Facilitation Skills Workshop Training from Educate 360, Completed

Personal Information

Title: BE Civil, PMP

Awards

Number of appreciation certificates for the successful project completion and EHS contribution.

Languages

English
Bilingual or Proficient (C2)
Hindi
Bilingual or Proficient (C2)
Arabic
Elementary (A2)
Malayalam
Advanced (C1)
Tamil
Advanced (C1)

Timeline

Senior Project Engineer

Saudi Chevron Phillips (S-Chem)
03.2015 - Current

Senior Project Engineer

Saudi Iron & Steel Co. Ltd. (HADEED/SABIC)
02.2011 - 02.2015

Construction Manager

M.S. Al Suwaidi Industrial Services Ltd.
12.2008 - 01.2011

Senior Manager

Sterling Projects and Engineering Limited (SPEL)
02.2007 - 12.2008

Project Manager

Khalid S. Al-Shahrani Est.
03.2001 - 12.2006

Quantity Survey Engineer / Site Engineer

Dywidag Saudi Arabia co. Ltd.
10.1998 - 12.2000

Assistant Engineer

Padmashree Constructions
11.1995 - 07.1998

Trainee Engineer

Bhagheeratha Engineering Ltd.
10.1994 - 10.1995

Bachelor's degree - civil engineering

Karnataka University
JAGADISH A. SHETTY