Summary
Overview
Work History
Education
Skills
Certification
Maritalstatus
Drivinglicensecategory
Personal Information
Roles And Responsibilities
Software
Languages
Timeline
Generic
EBRAHIM MOHAMED

EBRAHIM MOHAMED

MEP Manger
Riyadh,01

Summary

Well-qualified Division Manager with 20-year record of success in MEP. Strategic leader and effective problem-solver with firm grasp Construction needs and to optimize procedures, improve policies and maximize productivity.

Overview

20
20
years of professional experience
5
5
years of post-secondary education
2
2
Certifications

Work History

MEP Division Head

METHAQ CONTRACTING CO.
Riyadh, Riyadh Region
1 2020 - Current

Projects: Real Estate, food & beverage, Entertainment and Malls,Hospitals.

  • Sheikh Hamad and Son's Palace's 40 Million SR, 3 Years.
  • Feed Central kitchen, 2 Million SR 6 Months.
  • Sahara Mall Renovations 13 Million SR, Packages on 3 Years.
  • Sahara Al- Arabia office Building 15 Million SR, 18 Months.
  • Bidding and Tendering Dept
  • Fit out projects
  • Tempsta Central Kitchen 1.5 Million SR 8 Months.
  • La Strada Backyard 12 Million SR, 1 Year.
  • HAH Office building 2 Million SR, 6 Months.
  • Block commercial building 6 million SR, 1 Year.
  • Shakra General Hospital new clinics 2 million SR, 1 Year.
  • Red Crescent renovation Shakra 1 million SR 6 Months.

Roles

  • Collaborated closely with other division heads to develop integrated strategies that leveraged the strengths of each team for overall organizational success.
  • Developed strategic plans to drive business growth and improve overall performance.
  • Evaluated team performance regularly using established metrics, providing constructive feedback for ongoing improvement efforts.
  • Aligned company goals with customer outcomes and increased satisfaction by automating contact management systems.
  • Increased profit margins by effectively controlling budget and overhead and optimizing product turns up to 15%.

MEP MANAGER

SEDER CONSTRUCTION CO.
Riyadh, Riyadh Region
10.2014 - 12.2019
  • 1- AQARIA Housing Diplomatic Quarter
  • Built up area: 150 Villas
  • Duration of project and year completed: 2years completed 2017
  • Facilities: plumbing and HVAC
  • Project value:95 million SR
  • 2- Renovation for King Khalid hospital Najran
  • Built up area:25000 sq m (basement and ground floor)
  • Number of beds:200 Beds
  • Duration of project and year completed: 2 Years completed 2018
  • Facilities: Chillers, Chilled water System, AHU's, Ducting work, Firefighting systems, Boilers, Heat exchanger's, STP plant, Ro plant Plumbing, Medical gas system and electrical systems
  • Project value: 107 million SR
  • 3- Renovation for King Khalid hospital Tabuk
  • Built up area:25000 sq m (basement and ground floor)
  • Number of beds:200 Beds
  • Duration of project and year completed: 2 Years completed 2019
  • Facilities: Facilities: Chillers, Chilled water System, AHU's, Ducting work, Firefighting systems, Boilers, Heat exchanger's, STP plant, Ro plant Plumbing, Medical gas system, fire alarm, generators and electrical systems
  • Project value: 95 million SR
  • 4-500-Bed General Hospital Makkah.
  • Built up area:145326 sq m (basement and 6 floors) Number of beds:500 Beds
  • Duration of project and year completed: 4 Years Going on
  • Facilities: Chillers, Chilled water System, AHU's, Ducting work, Firefighting systems, Boilers, Heat exchanger's, STP plant, Ro plant Plumbing, Medical gas system and electrical systems
  • Project value: 650 million SR
  • 5- Bedding, contracting and procurement dept
  • 6- STC Renovation's projects
  • (Every phase 5 million SR).

Roles

  • Enhanced project efficiency by implementing effective MEP coordination and management strategies.
  • Improved team performance by providing regular training sessions on best practices in MEP design and construction.
  • Mitigated risks associated with MEP works by conducting comprehensive risk assessments during the project lifecycle.
  • Ensured compliance with codes, standards, and regulations through diligent oversight of MEP installation processes.
  • Optimized resource utilization for improved project results through meticulous planning and scheduling of MEP tasks.
  • Streamlined communication between internal teams and external partners, ensuring seamless project execution.
  • Managed subcontractors effectively to ensure timely completion of work within budget constraints.
  • Increased client satisfaction by consistently delivering high-quality MEP designs and installations.
  • Effectively managed budgets throughout the project lifecycle while maintaining a focus on cost reduction opportunities.

Senior Mechanical Engineer

SEDER CONSTRUCTION CO.
12.2012 - 10.2014

Project

  • Outpatient Building King Fahd Medical City ministry of health
  • Built up area:10000 sq m (basement and 7 floors)
  • Number of beds:500 Clinics
  • Duration of project and year completed: 3years completed 2014
  • Project value:150 million SR
  • Consultant: Abdu Allah Alsaif &Partners for Studies engineering consulting 2- Roles& Responsibilities
  • Construction of Mechanical Work as Plumbing Work, HVACs systems (AHU's, Chilled Water Systems, Ducting), Firefighting systems and Medical Gas systems.
  • Conducted root cause analyses for recurring issues, leading to long-term solutions that prevented future occurrences.
  • Checked design compliance with product specifications and standards requirements.
  • Completed mechanical designs for HVAC, air control, fire protection and elevators while providing SME input to client and design teams.
  • Identified areas of potential risk during project planning phases, implementing mitigation strategies to minimize negative impacts.
  • Designed, planned and directed upgrades to HVAC, plumbing, and other mechanical systems.
  • Increased customer satisfaction ratings through proactive communication during all stages of project development.
  • Implemented continuous improvement methodologies to enhance overall team efficiency and productivity levels.

Senior Mechanical Engineer

AL RADWAN CONTRACTING COMPANY
06.2011 - 12.2012
  • Project: GOSI Investment Housing Project Riyadh
  • Consultant: Arch-Center
  • Built up areas.300 Villas Duration of project and year completed.3 years
  • Completed 2012 Project value.300 million SR
  • Responsibilities: Construction of mechanical work as: Plumbing Work
  • Swimming pools
  • HVAC System.

Senior Mechanical Engineer

ORASCOM HOUSING COMMUNTIES.
06.2008 - 06.2011
  • Project Location: 6 October
  • Project Consultant: Dr
  • Nabil Abdel Malik
  • Responsibilities: Construction of mechanical work as
  • 1
  • Plumbing Work
  • 2
  • HVACs Systems
  • 3
  • Fire Fighting systems
  • 4
  • Water line network, sewage network and house connections.

Mechanical Engineer

EGOTECH FOR HVAC SYSTEMS
12.2006 - 05.2008
  • Project: Air Conditioning Systems in send bad Resort, Sun Rise Mamlouk resort and Sharm life resort in Hurghada
  • Responsibilities: Supervision of execute air conditioning systems
  • Package unit
  • Split Units
  • CCD Units.

Mechanical Engineer

ALHASSAN CONTRACTING
08.2004 - 11.2006
  • Project: WATER Line in Small Village in Sohag
  • Owner: Ministry of Housing
  • Responsibilities: Construction of Water line.

Roles

  • Developed engineering solutions for complex technical problems, enhancing overall system performance and reliability.
  • Improved product quality with the development of robust testing procedures and implementation of corrective actions.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • Increased production efficiency by designing and implementing process improvement strategies in mechanical operations.

Education

B. SC - Mechanical Power Engineering

Aswan University
Aswan Egypt
10.1999 - 05.2004

CPD - Contracts Management On Fidic Contracts Types

Link Academy
Online
02.2024 - 03.2024

BIM - Building Information's Management

Link Academy
Online
10.2024 - 11.2024

No Degree - HVAC Design

Engosoft
Online
05.2016 - 06.2016

No Degree - Plumbing & Firefighting Systems Design

Engosoft
Engosoft
05.2016 - 06.2016

Skills

Project Management

Certification

Project Management Professional (PMP)

Maritalstatus

Married

Drivinglicensecategory

Full

Personal Information

Visa Status: Approved

Roles And Responsibilities

  • Plan, Organize and manage MEP team for the completion of project as scheduled.
  • Plan project execution, develop and establish detailed working schedules based on project schedule.
  • Knowledge of MEP related authority permits and approvals process.
  • Develop and establish detailed Material Submittal schedule based on Project Schedule.
  • Develop and establish a comprehensive schedule of all planned drawing submittals based on project schedule.
  • Develop and establish methods / procedures for interface/tie-in with existing services of the project.
  • Review and propose actions to mitigate the delays, recovery plans if any, and confirm the implementation of the same.
  • Review the technical queries/clarifications from the subcontractor, provide clarification and raise the relevant queries/clarifications to consultant through RFI, CR or in meetings / discussions. Review the clarification from the consultant and transmit to all interfacing subcontractors.
  • Review subcontractor's drawings and coordinated drawings for Accuracy, Quality and incorporation of relevant information.
  • Manage the Shop drawings and as built drawings programs - Coordinate with team, subcontractors and Consultants - to ensure the drawing preparation progress is as per schedule.
  • Manage construction program - Coordinate with Construction team, Management and Consultants to ensure work progress is as per schedule.
  • Monitor work progress; analyze resources adequacy for achieving schedule, implement actions/recovery plans for any variations from planned schedule, verify effectiveness of the corrective action.
  • Provide accurate status of work progress, drawing submittals and material submittals weekly and monthly.
  • Present weekly progress status, weekly look ahead, potential issues affecting project progress to management and discuss/decide the corrective actions.
  • Coordinate with subcontractors, Project team and consultants for completing the testing and commissioning activities of the project as per project schedule.
  • Report to commercial department regarding the bad performance of subcontractor in progress, quality, safety or any other concerns, which needs to be taken contractually.
  • Provide necessary inputs/documents for preparing variation orders/claims to commercial department.
  • Lead, Motivate, Train and develop MEP Team.
  • Provide assistance in coordination conflict solving and problem solving.
  • Provide suggestions with regard to value engineering.

Software

(HAP) Hourly Analysis program

Oracle P6 Primavera

Elite Fire program

MS Project Software

Revit MEP

AutoCAD

Microsoft Office

Navis Work

Languages

Arabic
Native language
English
Advanced
C1

Timeline

BIM - Building Information's Management

Link Academy
10.2024 - 11.2024

CPD - Contracts Management On Fidic Contracts Types

Link Academy
02.2024 - 03.2024

No Degree - HVAC Design

Engosoft
05.2016 - 06.2016

No Degree - Plumbing & Firefighting Systems Design

Engosoft
05.2016 - 06.2016

MEP MANAGER

SEDER CONSTRUCTION CO.
10.2014 - 12.2019

Senior Mechanical Engineer

SEDER CONSTRUCTION CO.
12.2012 - 10.2014

Senior Mechanical Engineer

AL RADWAN CONTRACTING COMPANY
06.2011 - 12.2012

Senior Mechanical Engineer

ORASCOM HOUSING COMMUNTIES.
06.2008 - 06.2011

Mechanical Engineer

EGOTECH FOR HVAC SYSTEMS
12.2006 - 05.2008

Mechanical Engineer

ALHASSAN CONTRACTING
08.2004 - 11.2006

B. SC - Mechanical Power Engineering

Aswan University
10.1999 - 05.2004

MEP Division Head

METHAQ CONTRACTING CO.
1 2020 - Current
EBRAHIM MOHAMEDMEP Manger