I have been working at the German Technical Services Company for 2021 at now as a light current electrical engineer
I worked on implementing FIRE ALARM according to the American system in the Mecca Masar Project (car park03) Five thousand parking Cars
Estimating the project quantities, reviewing the drawing, supervising their implementation in the required manner according to a specific timetable, and handing over the works to the consultant
We completed all stages successfully (first fix &second fix &third fix) 3800 POINTS
Connecting Fire alarm to mechanical systems
Carrying out testing and operation work and ensuring that it works as required
Implementation of BMS works on the Masar project
Coordination with the rest of the departments (Civil and Mechanical Department)
Overview
7
7
years of professional experience
Work History
Electrical engineer
GERMAN TECHNICAL SERVICES
Makkah, SAUDI ARABIA
03.2021 - Current
Continually improved methods and procedures for processes, measurement, documenting and work flow techniques.
Supervised technicians and craftspeople during projects.
Kept and updated records on all electrical design changes.
Assessed electrical systems performance for optimal functionality.
Created technical documentation to facilitate knowledge transfer within team.
Delivered plant upgrades, modifications and refurbishments on time and to project specifications.
Analysed operational data, identified trends and implemented corrective actions to enhance system reliability and performance.
Supervised technicians in installing and maintaining LV ,LC and systems, overseeing safety and operational efficiency.
Applied innovative solutions to enhance energy efficiency in electrical systems.
Executed detailed design reviews, identifying and resolving potential issues in electrical plans.
Conducted risk assessments for electrical installations, maintaining safety and reliability.
Recommended improvements in electrical design processes, enhancing overall efficiency.
Diagnosed and rectified electrical faults, minimising downtime and optimising system performance.
Conducted feasibility studies for electrical projects, evaluating technical and financial viability.
Collaborated on cross-functional teams to design and implement innovative solutions, enhancing plant performance and reliability.
Sourced and procured electrical components, optimising costs and delivery timelines.