Summary
Overview
Work History
Education
Skills
Personal Information
Hobbies and Interests
Languages
Timeline
Generic
Engr Niamat Ali

Engr Niamat Ali

Riyadh

Summary

Focused,skilled & goal driven Electrical Engineer having 9 years of professional experience in various international power sectors including Inspecting, Testing, Configuring & Operating of 17.5KV Switch Gears/SRMU(3 Ways,4 Ways,3L,4L) of various manufacturers (Alfanar, Chint, Meta, Scheinder & XJ Delishier), Supervision & Monitoring the dismantling & installation process of 17.5kV SRMU (3Ways, 4Ways, 3L, 4L), Termination & Jointing Of 13.8kv Power Cables(500mm2, 300mm2, 185mm2, 70mm2), Supervision & Monitoring the installation process of LV(230V, 400V) panels, Operating, Monitoring & Controlling of 36.6MW Power Plant through Electrical SCADA, Operation & Controlling of GIS 132KV Grid Station through Substation Automation System Software(SASS), Installation & Testing Of Power Transformers (500KVA, 1000KVA, 1500KVA), Termination & jointing of 13.8KV power cables, Installation of 11KV & 132KV Overhead & Underground Transmission Lines, Controlling & Operation of EWSD Switch through Automatic Program System Software(APSS), Instrumentation Transformers & Automatic Transfer Switch(ATS), Installation & Configuration of Dahua & Hikvision brands of Cameras, IRs, Radars & NVRs. Installation of Solar Modules(400W, 450W&500W). Hand on practical experience on Installation, Termination & designing of LV/MV/HV Electric Metering System, Single Phase & Three Phase LV/MV/HV Electrical Wiring System, Electrical Conduiting System, Electrical Design Drawing, Electrical Shop Drawing.

  • Saudi Council Of Engineers's Membership:Available.
  • Pakistan Engineering Council's Membership:Available.
  • Saudi Electricity Company 's Card:Available.
  • Light Vehicle Driving's License:Available.
  • Iqama Type:Transferable.

Overview

9
9
years of professional experience

Work History

City Project Manager

CCS
01.2024 - 12.2024
  • Leading,Managing & Controlling of all the ongoing activities of the project inside the region's premises
  • Excecuting the project as per pure standard SOPs of SEC
  • Pre-Commissioning & Configuration of various switch gears(SRMUs) on real time base
  • Updating the PD,PM,CM,SO about the ongoing activities on due time
  • Coordination with SEC,SGCC,SEGI & CCS's management about the progressive flow of ongoing project
  • Making shutdown plan for the new sites as per given instructions of control center & SEC's management
  • Making the survey reports of the suggested sites given by SEC's management
  • Managing & controlling the cast of the project as per available manpower & other available stuffs
  • Managing & providing all the stuffs to the team as per requirement on real time base
  • Preparation of Installation Report,Testing & Configuration Report,Site Inspection Report,Equipments Inspection Report on daily base
  • Supervision & Monitoring the dismantling process of 17.5kV Ring Main Unit(3 Ways,4Ways,3L,4L) of various manufacturers (Lucy,Sheinder, Siemen & Alfanar)
  • Supervision & Monitoring the installation process of 17.5kV Smart Ring Main Unit(SRMU)of various manufacturers(Meta,Chint,XJ Delishier & Alfanar)
  • Supervision & Monitoring the Jointing & Termination process of 13.8KV power cables(50mm2,70mm2,185mm2,300mm2 & 500mm2)
  • Supervision & Monitoring the Jointing & Punching process of 13.8kV power cables lugs(50mm2,70mm2,185mm2,300mm2 & 500mm2)
  • Inspection of Testing & Configuration process of 17.5kV SRMU(3Ways,3L,4ways,4L) of Meta,Chint,XJ Delishier & Alfanar brands
  • Preparation of daily,weekly & monthly report as per schedule
  • Imposing the standard SOPs of SEC inside the site premises.

Site Electrical Engineer

CCS
01.2023 - 12.2023
  • Recieving of MV/LV PTW(Permit To Work),Lifting Operating Permit(LOP),LOA(Limitation Of Access),Confined Area Entrance Permit(CAEP)on assigned time from SEC authorized operator/Issuer
  • Managing & Controlling all the ongoing activities inside the site's premises on real time base
  • Supervision & Monitoring the dismantling process of 17.5kV Ring Main Unit(3 Ways,4Ways,3L,4L) of various manufacturers (Lucy, Sheinder,Siemens & Alfanar)
  • Supervision & monitoring the Installation process of 17.5kV Smart Ring Main Unit(SRMU)of various manufacturers(Meta,Chint,XJ Delishier &Alfanar)
  • Supervision & Monitoring the Jointing,Termination & Punching process of 13.8KV power cables(50mm2,70mm2,185mm2,300mm2 &500mm2)
  • Inspecting the testing & configuration process of 17.5kV SRMU(3Ways,3L,4Ways,4L) of various brands(Meta,Chint,Lucy,Alfanar,DFA,XJ)
  • Performing MEGGER Test of the 13.kV power cables(185mm2,300mm2 & 500mm2)
  • Submitting the installation record of the site through WFMS by using hand held unit(HHU)
  • Preparation of safety documents(PTW,LOP,TWF,TBT,CSEP)
  • Checking voltage,current,power of Transformer & Portable Generator(1000KVA,1500KVA) through DMM
  • Checking the rotation of three phase system through Rotation Meter/Phase Indicator
  • Preparation of daily,weekly & monthly report as per schedule
  • Taking a special care of safety at the site's premises as per rules & regulations of SEC.

Site Electrical Engineer

Shabakaat
01.2022 - 12.2022
  • Managing of overall workload distribution & team installation progress
  • Collecting of LV'sPTW & LO'sPTW from SEC's authorized Engineer
  • Lead any assigned operations meetings and training sessions regarding LV's panel & busbar
  • Designed,tested & implemented innovative creative solutions to improve customer satisfactions & reduce costs
  • Quality check of all the cables,breakers,busbar used during the installation process
  • Doing IR Test(Megger Test) of all the cables used during installation through megger tester
  • Monitoring the dismantling & installation process of LV's Panel,LV's Bus bar,Breakers(MCB,MCCB &RCB),Analogue Ammeter & Voltmeter,Digital Meter etc on LV's panel
  • Test and troubleshoot low voltage electrical systems to identify and resolve any arosed issues & communicated with clients & SEC's management on those problems as well
  • Planed out most efficient routes for incoming & outgoing power cables
  • Communicating with an authorized SEC's Site Manager,SEC's operator,SEC's supervisor & SEC's safety officer
  • Monitor operational processes for accuracy,completeness,efficiency,purchasing & reporting
  • Checking of voltage,current,power through DMM,phase rotation through rotation meter(phase indictor)
  • Checking the valid SEC's card & PPEs of jointers,terminators & helphers,Inspecting the quality of First Aid Box,Fire Extinguisher,Insulated & Non Insulated Tools on daily base
  • Trained new employees on effective ways to pull and terminate cables for inspirational outcomes
  • Preparation of daily,weekly & monthly report as per schedule & share with the higher management & client
  • Ensuring the safe working procedures as per standard rules & regulation of SEC.

Maintenance & Configuration Engineer

CCS
01.2020 - 12.2021
  • Leading & monitoring the team during the installation process of Dahua & Hikvision,Cameras,IRs,Radars & NVRs
  • Configuration & maintenance of Dahua & Hikvision Cameras,IRs,Radars & NVRs through hikvision & dahua's softwares
  • Online submission of Civil Implementation,System Installation & System Configuration through EGATE
  • Co ordination with PD,PM & CM on regular base
  • Guiding & monitoring the team during the installation process of computer edge,vertical anntena & router inside the NVR's box
  • Guiding & monitoring the team during the installation process of brackets,solar panels(400W,450W,500W,10000W)
  • Guiding & monitoring the team during the installation & termination process of DC batteries(150AH,200AH,250AH,300AHB)
  • Leading & monitoring the team during the installation & termination process of data cables(CAT6,CAT6A),Power Cables(3/4 & 3/6),RJ45 Connectors
  • Preparation of daily,weekly & monthly reports
  • Working as per standard SOPs of Tahakkum at the sites.

Operation & Maintenance Engineer

Power & Energy Development Organization(PEDO)
01.2018 - 12.2019
  • Pre-start checking of all units(6MW,15.3MW,15.3MW) after maintenance
  • Operation,Supervision & Controlling of Whole Power House(36.6MW) from CCR through SCADA
  • Starting/Stopping of all units(6MW,15.3MW,15.3MW) under Normal and Emergency condition
  • Changing of Active Load(MW) & Reactive Load(MVAR) as per demand of NPPC,System Constrain andWater Availability
  • Operating/Monitoring of 3-Phase Synchronous Generator,Spherical Valve,Governor,Cooling WaterSystem and Air Compressor System &Air Brake System
  • Operating/Monitoring of 25MVA & 40MVA Power Transformer(Tap Position,Oil & WindingTemperature,Oil Level,Buchholz and Pressure Relay & Oil level Monitoring Device)
  • Operating/Monitoring of Automatic Transfer Switch(ATS)
  • Preparation of Station Log and Check Sheets having all events occurring at power house
  • Hourly based Data Collection of all three Units(6MW,15.3MW,15.3MW)
  • Preparing Trouble Report & Daily Operation Data(DOD) Report
  • Co-operate with Plant's Specialists to ensure quick recovery from Service Failure
  • Restoration of power house's auxiliary through diesel generator in case of 132kV line tripping
  • Working as per operational SOPs of O&M Director.
  • Conducting root cause analysis on recurring issues,identifying long-term solutions that reduced future incidents.
  • Improved system performance by conducting regular preventive maintenance and identifying areas for optimization.

Site Electrical Engineer

Hydro Electro Service Pak(HESPAK)
07.2017 - 12.2017
  • Coordination with Project Director(PD) & Project Manager(PM) regarding day-to-day execution of electrical,protection & instrumentation works
  • Daily supervision of under progress work
  • Organization & implementation of the latest technical procedures at working site for effective outcomes
  • Preparing of daily,weekly and monthly report of progressive work
  • Improved electrical system efficiency by designing and implementing advanced power distribution networks.
  • Submission of works to top order management
  • Inspecting the installation of underground Cables(11KV,33kV,132KV)
  • Electrical Conducting System,Electrical Cabling System & Electrical Calculation
  • Inspecting the Installation process of Power Transformers(5MVA,10MVA,13MW,26MVA & 40MVA)
  • Installation of Distribution Transformers(440VA,330VA & 220VA)
  • Installation of Instrument Transformers(Current Transformer & Potential Transformer)
  • Installation Of 132kv Electric Metering Panels(Primary & Backup) for measuring generated & utilized energy at terminal & consumer end
  • Installation of Electric Metering Panels for measuring magnitude of Current,Voltage & Frequency of132KV Transmission Lines
  • Manual operation of Transformers(5MVA,10MVA & 26MVA)
  • Electrical AutoCad,Electrical design drawing & Electrical shop drawing
  • Enforce the pre defined safety within the plant's premises.
  • Proposed electrical product and system modifications to improve quality and efficiency.

Station Electrical Engineer

Pak Telecommunication Company Limited(PTCL)
06.2016 - 06.2017
  • Engineered & designed single wire diagram for double circuits 132kv grid station bearing a laod of 60MVA
  • Pre commission tests of SF6 circuit breakers(CRM Test,Contacts Open/Close Timing Test)
  • Pre commission tests of current transformers(CTs) & potential transformers(PTs)
  • Pre commission tests of power transformers(10MVA,25MVA,25MVA)
  • Leading,monitoring & guiding the teams during the installation process of isolators,circuit breakers,current transformers(,potential transformer,surges arresters,bus coupler,capacitor bank,wave trap & power transformers(10MVA,25MVA,40MVA)
  • Reviewed reports to ensure 100% compliance with standard regulations
  • Communication with PD,PM & RE,attending meetings 2 times per weeks,drafting project relevant reports, graphs & presenting design & design updates to PD,RD & RE during review meeting
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Deligated & evaluated team's work to proactively issues & concerns
  • Organize & implement the latest technical procedures at working site for effective outcomes
  • Making day to day installation progress report of ongoing activities through specific project management software & professional MS Office & share with higher management
  • Planed and managed resources to ensure the execution of assigned projects within the approved budget.
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.

Site Operation & Maintenance Engineer

Turnotech
01.2016 - 06.2016
  • Operation/Maintenance of various modules of Digital Line Unit(DLU) of EWSD
  • Operation/Maintenance of Automatic Program System(APS)
  • Hand on practical experience on splicing,OTDR testing & power meters
  • Experience on Huawei BTS(BTS3900,BTS3900A)
  • Experience on NEC Microwaves(Passolink, Ipassolink,NEO )
  • Experience on Huawei Microwaves(RTN Optix 905,Optix 950,Optix 980)
  • Experience on rectification of issues in ATS & AC distribution panels
  • Experience on Rectifiers(Huawei,Emerson,Flat Pack,Saft Power & Delta)
  • Experience on Huawei Power Cube System(2V,12V) & CES Power Cube Systems(2V,12V)
  • Experience on Gensets(NEQ,GHADDAR,METS,PERKLIN
  • Coordination with project manager regarding day-to-day execution of electrical,protection & instrumentation works
  • Organize & implement the latest technical procedures at working site for effective outcomes
  • Taking a special care of safety inside the site premises.
  • Enhanced safety standards by conducting regular inspections, identifying hazards, and recommending corrective actions.

Junior Electrical Engineer

WAPDA
07.2015 - 12.2015
  • Monitoring & supervising the Installation process of overhead transmission lines(132kv,33kV,13.8kV,11kv),Overhead distribution lines(220v,440v),Electric feeders(132kv,11kv,220v &440v),Power transformer (5MVA,10MVA, 20MVA, 1000kVA ,500kVA),Distribution transformers(440VA,330VA,220VA),Current transformers(400A/4A, 300A/3A, 200A/2A, 100A/1A),Voltage transformer(440V/4V,330V/3V,220V/2V,110V/1V),Energy meters panels(132kv,11KV & 6KV),Various types of Insulators(Pin,Suspension,Strain& Shackle),Various types of circuit breakers (Air Break,Air Blast,Sulphur Hexafluoride & Vacuum),Various types of relays(Current Relay,Voltage Relay,Frequency Relay & Power Relay),Various types of surges arresters(Secondary,Distribution & Intermediate),Various types of lighting arresters(rod,sphere,horn,multi gap metal oxide),Conductors used for 132KV,33kV & 11KV transmission lines(AAAC &ACSR).

Education

Bachelor of Science - Electrical Engineering

University Of Engineering & Technology (UET).
Peshawar,Kpk,Pakistan.
12.2015

Higher Secondary School Certificate - Pre-Engineering.

Govt Degree College(GDC).
Mingora,Swat,Pakistan.
03.2011

Secondary School Certificate - Science Education

Sir Sayyed Public School(SSPS).
Madyan,Swat,Pakistan.
03.2008

Skills

  • Developed Confidence & Leadership level
  • Technical understanding
  • Excellent Communication & Team Bonding
  • Goal Driven & Punctual Mindset
  • Systems Installation & Configuration
  • Root Cause Analysis
  • Risk Assessment
  • Advanced Problem Solving

Personal Information

  • Name:Niamat Ali.
  • Title:Electrical Engineer.
  • DOB:04 March 1992.
  • Nationality:Pakistan.
  • Reigion:Islam.


Hobbies and Interests

  • Thinking Creative & Tactical Ideas
  • Reading Electrical Engineering Books.
  • Linkedin & Bayt.Com's Viewing..
  • Watching Various Electrical Projects on YouTube.



Languages

Urdu, Pushto
Native language
English
Proficient
C2
Arabic
Intermediate
B1

Timeline

City Project Manager

CCS
01.2024 - 12.2024

Site Electrical Engineer

CCS
01.2023 - 12.2023

Site Electrical Engineer

Shabakaat
01.2022 - 12.2022

Maintenance & Configuration Engineer

CCS
01.2020 - 12.2021

Operation & Maintenance Engineer

Power & Energy Development Organization(PEDO)
01.2018 - 12.2019

Site Electrical Engineer

Hydro Electro Service Pak(HESPAK)
07.2017 - 12.2017

Station Electrical Engineer

Pak Telecommunication Company Limited(PTCL)
06.2016 - 06.2017

Site Operation & Maintenance Engineer

Turnotech
01.2016 - 06.2016

Junior Electrical Engineer

WAPDA
07.2015 - 12.2015

Bachelor of Science - Electrical Engineering

University Of Engineering & Technology (UET).

Higher Secondary School Certificate - Pre-Engineering.

Govt Degree College(GDC).

Secondary School Certificate - Science Education

Sir Sayyed Public School(SSPS).
Engr Niamat Ali