Strategic and results-driven QA/QC professional with 14+ years of leadership experience in quality assurance, control, and project management within complex construction and engineering environments. Skilled in developing and implementing Quality Management Systems (QMS), fostering a culture of "Right First Time," and ensuring compliance with contractual and regulatory requirements. Adept at managing quality teams, conducting audits, and ensuring project quality assurance across all phases of the project lifecycle.
Overview
15
15
years of professional experience
4
4
years of post-secondary education
1
1
Certification
Work History
QA/QC LEAD
NESMA UNITED INDUSTRIES CO LTD
Al Khobar, SAUDI ARABIA
04.2023 - 01.2025
Provided strategic leadership for implementing project quality assurance activities, ensuring alignment with organizational and client standards.
Developed and maintained Project Quality Management Systems (PQMS), fostering a culture of "Right First Time" across the project team.
Acted as the primary point of contact for quality management matters, ensuring seamless coordination between project teams and client leadership.
Reviewed and approved critical quality documents, including Project Quality Plans, Inspection Test Plans (ITPs), and Method Statements, ensuring all documents adhered to contractual specifications.
Reduced quality deviations by 95% through the implementation of an enhanced inspection process.
Led a team of 15 inspectors/auditors, achieving Quality Milestones of the project aligned with the company policy and ISO standard.
Monitored contractor quality control activities to ensure that the PQMS was effectively established, implemented, and maintained.
Prepared and presented weekly and monthly quality assurance progress reports to clients and internal stakeholders
QA/QC Engineer (E & I)
ALASCON CO LTD
Al Khobar, Saudi Arabia
11.2018 - 11.2022
Ensured compliance with international standards (e.g., NEC, NFPA, IEC, IEEE, ISO, NEMA) and project specifications for all electrical and instrumentation (E&I) systems.
Conducted detailed inspections and testing of electrical installations, including cabling, panel boards, transformers, switchgear, and control systems, achieving 100% error-free commissioning.
Successfully delivered quality assurance for the E&I scope of a $250 million project, ensuring zero downtime during critical installations.
Collaborated with engineering, procurement, and construction teams to establish and verify adherence to project quality requirements.
Performed Factory Acceptance Tests (FATs) and Site Acceptance Tests (SATs) for critical E&I components, reducing rework by 100%.
Led pre-commissioning and commissioning activities, including loop checks, continuity tests, and functional testing, delivering systems on time with zero non-conformance.
Ensured 100% compliance with HSE standards and QA/QC policies during high-risk electrical installations and instrumentation testing.
QA/QC Engineer (Electrical)
SAUDI SERVICES FOR ELECTRO MECHANIC WORKS (SSEM)
Riyadh, Saudi Arabia
06.2015 - 06.2017
Ensured all construction activities complied with contractual requirements and were executed using best practices.
Verified materials and equipment incorporated into the project met contract requirements through rigorous inspections and documentation reviews.
Managed and trained quality control personnel, ensuring the team's competence and readiness to execute inspections and audits effectively.
Conducted regular audits to verify that quality control systems were implemented as per established standards.
Developed and implemented a comprehensive quality control system for a Power distribution project, reducing rework by 75%.
Collaborated with project management teams to provide adequate infrastructure and a conducive work environment for quality assurance operations.
Managed and trained quality control personnel, ensuring the team's competence and readiness to execute inspections and audits effectively.
Associate QA/QC Engineer (E & I)
JAFFER BROTHERS PVT LTD
Islamabad, Pakistan
06.2010 - 06.2015
Supported the development and implementation of Inspection Test Plans (ITPs), Method Statements, and QA/QC procedures to meet quality benchmarks and project timelines.
Collaborated with senior QA/QC engineers and project teams to ensure quality objectives were achieved during electrical and instrumentation installations.
Streamlined inspection workflows, reducing the review and approval cycle time by 97.5%.
Maintained QA/QC documentation, including inspection records, calibration certificates, and quality reports, for internal audits and client submissions.
Recognized for playing a pivotal role in minimizing defects during pre-commissioning activities, improving project delivery timelines.
Conducted inspections of electrical installations, such as wiring, cable trays, grounding systems, distribution panels, and instrumentation devices, ensuring adherence to design drawings and standards.