Results-driven MEP Construction Manager with extensive experience overseeing complex mechanical, electrical, and plumbing installations in international construction environments. Proven ability to drive project success through strategic planning, effective problem-solving, and a commitment to excellence. Recognized for fostering strong team collaboration and adapting seamlessly to dynamic project requirements, ensuring timely and budget-compliant delivery. Expertise in project management, technical analysis, and stakeholder communication enhances the capacity to lead diverse teams toward achieving organizational goals.
Project: DIRIYAH SQUARE - PACKAGE 02 SUPERBASEMENT
Egypt Projects: Elsewedy Meters Free Zone S.A.E. solar plant Project (115 KWp.), Orouba For Food Industry Co. Basma. solar plant Project (255.6 KWp.), Mansoura for Resins and Chemicals Industries, Solar Plant Project (457.92 KWp.), Hyper One - Solaymaniea, Solar Plant Project (1.02 MWp.)
Kuwait Projects: Ali Al Ghanim & Sons Automotive W.L.L (580.0 KWp.), Kazama Camp Kuwait National Guard. Solar Plant Project (281.84 KWp.).
Bahrain Projects: Royal University for Women - RUW, Al Muaskar Hwy, Riffa, Bahrain, Solar Plant Project (3.45 MWp.), Durrat Al Bahrain, Bahrain. solar plant Project (5.6 MWp.), Gravity Indoor Skydiving - Gravity Village solar plant Project (1.84 MWp.)
Occupation: Project manager
Kuwait Project: Petrochemical Industries Company (980.0 KWp.)
Occupation: Electrical Head office Engineer
Project: Multi Bank Cash Center Management (MBCC).
Project: Riyadh Metro tunnels ventilation system (TVS).
Project: four high power medium wave stations.
Project: Saudi podcasting archiving.
Project: Ministry of Education.
Project: Saudi Arabian Monetary Agency (SAMA).
Project: NEWGIZA
Project: FOUR TV SITE STATION -NJAB
Project: Suzanne Mubarak Family Garden.
Project: Petrochemical Company Headquarters.
The Headquarters of The Oil and Gas Skills Company.
PetroSport Sky house resort.
Project: Arab united group factories (manufacture and assembly cars).
Project: RAMO Residential Compound.
I'm currently working in First Gulf Company (FGC), as a MEP Construction Manager , responsible for overseeing all aspects of a project to ensure the quality is a high standard, and that it is running to the timescales allowed, Monitoring build progress, overseeing finance and ensuring project quality, Making strategic decisions and providing leadership and direction to project managers to implement those decisions, Meeting with clients, stakeholders and project managers to report on project progress, Liaising with clients and building strong working relationships, Devising cost-effective plans to enable effective project completion, Managing risks to avoid delays or reputational damage, Ensuring permits and legal papers are secured ahead of the project, Managing project managers and enabling them to supervise and manage their own teams, and Working in an office and on a construction site. .with a large scale in the engineering consultancy and contracting works, for the medium voltage and low voltage distribution system, a professional designer for the administrative buildings , residential buildings and feeding system, within a considerable experience ( 21 years ) in the electrical design in the medium voltage generation power plant , and feeding system, with all network equipment's (medium voltage diesel generators, medium voltage switchgears, synchronization and auto load shearing panel for the generation sets, and transformers, low voltage switchgears, automatic power factor correction, low voltage distribution panel boards, uninterruptible power supply, and cables for the distribution system), team leader and technical support to QC department , preparation of design documentation, and the cost estimation .
Course on the technical staff to oversee the work of electrical wiring, cabling and maintenance and electrical installations.