- Led conformance activity across environmental, health and safety and regulatory compliance.
- Monitored market trends and developments to remain ahead of competitor activity.
- Supported customer audits and capitalised on insights through strategic technical planning.
- Evaluated customer impact risk, reputation risk and regulatory risk as part of project assessments.
- Set realistic technical KPIs based on past performance and motivated teams to achieve them.
- Guided, coached and led project teams, delegating tasks and evaluating performance and progression of project pace.
- Trained and supervised all stage crew in technical safety procedures.
- Participated in implementation of organisational goals and strategic planning.
- Updated policies and practices to reflect business objectives and improve technical output.
- Prepared work schedules and assigned personnel to meet production plans.
- Collaborated with multidisciplinary teams to develop creative, customer-focused solutions.
- Investigated and resolved non-conformance issues to limit manufacturing delays and losses.
- Produced technical schedules in line with production specifications.
- Audited internal operations to maintain company, customer and legislation standards.
- Developed technical documentation and resources to support learning and development.
- Aligned product development roadmaps with technical strategy to achieve business goals.
- Presented information clearly and concisely to engage technical and non-technical audiences.
- Most prominent projects:
- Study, design, and approval plans for Grand Hyatt Hotel:
Al-Rashid trading & contracting co (RTCC), Al-Rashid mall – Al-Khobar -KSA– Area (10,000 m2, 12 floors).
- Study, design and approval by civil defense - for Dana and Nada Residential Complex:
Al-Rashid Trading & Contracting Co (RTCC), (R-2), Al-Rashid – Al-Khobar –KSA – Area (110,000 M2 – Multi Buildings).
- REPLAC FIRE ALARM & FIRE PROTECTION SYSTEM:
Client: Aramco- oil company offices - Dhahran –KSA – area (4600 m2 – g, f floors).
- Study, design, and approval the FM-200 System by civil defense:
8 buildings for the saline water conversion corporation from Riyadh to Ras Al khair- saline water desalination corporation co (SWCC), control & storage.
- Study, design and approval AL-Yamama comps (7 Camps) by civil defense:
7Camps for Al-Yamama Company in the Eastern region (The buildings include workers housing - warehouses - workshop – LPG gas tanks - water stations - service buildings).
- Study, design, and approval the (FF, FA, LS) System by civil defense:
For al- Mutlaq commercial complex, Al- Mutlaq, Al-Khobar –KSA – area (15,600 m2, 8 floors).
- Study, design, and approval the (FF, FA, LS) System by civil defense.
For Crown Plaza Al Khobar hotel, Crown Plaza, Al-Khobar –KSA area (2,650 m2, 11 floors).
- Study, design, and approval by MODON For the Following Customers:
For the following factories: 1st, 2nd, and 3rd industrial city – Dammam
1-Zamil Plastic Factory.
2- Abdullah Hashem Factory for Equipment and Gases.
3- Naqel Company for Logistic Services Factories (Dammam - Jeddah - Al-Ahsa).
4- Saudi International Petrochemical Factory.
5- Pan Gulf Valves Factory.
6- Rabion Chemicals Factory.
7- Baz International Company for Industry Factory.
8- Espak Factory.
9- Al-Kifah Carton Boxes Factory.
10- Spring Water Company Ltd. Factory (Nestle).
11- Westering Factory for The Manufacture of Oil Well Drilling Rigs.
12- Rawabi Holding Company Factories.