Summary
Overview
Work history
Education
Skills
Languages
Timeline
Gurram Vishnu

Gurram Vishnu

H.no 3-85,Aloor, Armoor,Nizamabad,India

Summary

  • To obtain a position where I can apply acquired knowledge and skills, to strive and excel in whatever works that are undertaken, there by continually growing and contributing to the main objectives of the organization.

Overview

17
17
years of professional experience
4
4
years of post-secondary education

Work history

sr survey engineer

TA infra projects saudi limited
riyadh, saudi arabia
11.2012 - Current

Project works:- North Jeddah waste water system(Saudi Arabia),

Taif waste water system .

· DI PIPE (ductile iron) raising main (6 km) ,300 dia,200dia&100dia

· RCC PIPE (5km) gravity line

· VC PIPE(vitrified clay pipe)gravity line (40km) 600dia,500dia,400dia,300dia&200dia

· HDPE PIPE(potable water line)5 km 300dia

· Pump houses

Road tunneling

Survey Engineer

Indu projects limited
Hyderabad, india
05.2010 - 11.2012

Projects works

o Raw water intake pipe line system:-Intake well structure ,700 meter length bridge & 600 dia MS pipe 12km

o Raw water reservoir &Raw water pump house

o Circulating water pipe line system, CW pump house & pipe line 4km (3m dia MS pipe & 2m dia MS pipe)

o General civil works:-clarifloculators,DM water tanks

o Ash pond

o Township :-Buildings

Senior Surveyor

Leonia Holistic Destination
Hyderabad, india
06.2009 - 05.2010

Projects works

o Buildings:- Hotel B block & A block, Sports bar, Auditoriums, Ballocity, Banquet halls, Fish therapy, Staff quarter &Open spa

o Water parks :- Flow rider (first in India)Swimming pools, Infinity pools, Open parks,

o Land scapings:-Rock garden, open gardens

Surveyor & Cad engineer

Sumadhura Geomatica pvt ltd
Hyderabad, India
08.2006 - 06.2009

o Projects:- Amrp Nalgonda dist ,work Field channels

o Bhima lift irrigation Mahaboobnagar (sangam banda, bhoothpur,shankara samudram)

o Nandyala flood works Kurnool dist (kundu river)

o Thungabhadra HLC Ananthapur dist canal modernization work

o Preparation of Statements and Reports of given sections

o Preparation of Longitudinal Section with Site Plan and preparing the Booklets

o Preparation of Cross sections

o Earth work Quantity Calculation and Land Widths marking to the alignment

o Catchment areas of structures calculating through Topo sheets.

o Alignments fixing with coordinates of Total Station

o Digitization’s of maps and contours generating with sierra software & surfer

o Structures Drawing as per given dimension with as per given scale

o Preparation of L.P schedules from Revenue records with respective village map & F.M.B

o After scrutiny of L.P Schedules preparation of F.M.B.s coordinating with revenue surveyors

o Certificates and preparation of weekly progress reports monthly progress reports executive summaries

o Surveying with Auto Level

o Taking LS & CS with using the AUTO LEVEL , TOTAL STATION & GPS

Education

SSC -

ZPHS Aloor, Nizamabd,India
04.2003 - 03.2004

Draughts men civil - Civil

National Council for Vocational Training, India
06.2004 - 07.2006

Diploma - Civil

Institute of Management and Technology , india
04.2011 - 04.2012

Skills

  • Operate of Auto Level , Total Station, GPS
  • Computer Skills
  • SOFTWARE -

    o Auto CAD All Latest versions

    o MS - OFFICE

    o Software of Surveyors

    o Sierra software, surfer

    o GIS


Languages

English
Advanced
Arabic
Elementary
Hindi
Fluent
Telugu
Native

Timeline

sr survey engineer - TA infra projects saudi limited
11.2012 - Current
Institute of Management and Technology - Diploma, Civil
04.2011 - 04.2012
Survey Engineer - Indu projects limited
05.2010 - 11.2012
Senior Surveyor - Leonia Holistic Destination
06.2009 - 05.2010
Surveyor & Cad engineer - Sumadhura Geomatica pvt ltd
08.2006 - 06.2009
National Council for Vocational Training - Draughts men civil, Civil
06.2004 - 07.2006
ZPHS Aloor - SSC,
04.2003 - 03.2004
Gurram Vishnu