Summary
Overview
Work History
Education
Skills
Timeline
Generic
HABIB NOOR NOOR

HABIB NOOR NOOR

MAKKAH

Summary

I believe that my educational background and commitment to serving your organization, qualifies me well for a position in your company, i am looking for a career where i have to deal professionally maintain a high level of confidentiality and in addition, i have ability to exercise initiative and work either and team environment or independently.

Overview

18
18
years of professional experience

Work History

Electrical engineer

RIVA Engineering (Gmbh)
Makkah
12.2020 - Current
  • Company Overview: Worked as Electrical Engineer at RIVA (Gmbh) at third Expansion of Holy Haram Project.
  • Installation of LED Lights low current panels SCDP & LDM cabinet.
  • Configuration of LDM module and LINX Gateway.
  • Programming of LDM modules and LC for BMS system.
  • Installation of moveable windows and skylights motors and his PLC control panels.
  • Supervision of all electrical equipment installation.
  • Preparing of short drawing and as build.
  • Preparing of WIR & MIR.
  • Visit the site and find out the problems and discuss with consultant and management.
  • Different types of tests like IR & HIPOT.

MAINTENANCE EXPERIENCE

  • Scheduled and undertook periodic maintenance on all electrical installation component and equipment.
  • Performed energy audit and recommended alternative source of energy for client.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Visually inspected and tested machinery and equipment performing routine preventive maintenance.
  • Organize and directed maintenance shutdown and startup.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Dismantled defective machines and equipment and install new or repair parts.
  • Trained and supervised staff on equipment maintenance and safety procedures.

ELV EXPERIENCE

  • Design & installation of CCTV system (Analog & IP).
  • Configuration of DVR/NVR system.
  • IP Camera and POE switches.
  • Perform the integration CCTV system with access control.
  • Responsible of low voltage power distribution system.
  • Also responsible of conventional and addressable Fire Alarm system.
  • Installation of FACP panels.
  • Configuration and integration of smoke & heat Detector and MCP.
  • Also responsible of the BMS system.
  • Configuration of the different types of modules like (2020,1616,303,202).
  • Installation & configuration of the different types of BMS sensor & transmitter like (pressure sensor, Temperature sensor, Humidity sensor, Air flow sensor, CO2 Sensor).
  • Worked as Electrical Engineer at RIVA (Gmbh) at third Expansion of Holy Haram Project.

Electrical engineer

Saudi BinLadin group (SBG)
JEDDAH
05.2017 - 12.2020
  • Company Overview: Worked as Site Electrical Engineer with SBG at King Abdul Aziz International Airport Project.
  • Installation of LMS base lighting system.
  • Installation of LV & MV switch gear and transformer.
  • BMS & CMS control panel.
  • Installation of different types of BMS panel.
  • Programming and configuration of BMS system.
  • Installation and configuration of all sensor and transmitter for BMS system.
  • Installation and configuration of VFD parameters.
  • Pre commissioning of all electrical equipment.
  • Electrical testing of all switch gear and transformer.
  • Supervised the job like cable laying, cable tray, cable trunking.
  • Worked as Site Electrical Engineer with SBG at King Abdul Aziz International Airport Project.

Electrical engineer

E-Box system
Karachi
10.2012 - 02.2015
  • Company Overview: Worked as Electrical Engineer with E-Box system at U-phone Tower maintenance Project.
  • Installation of D.G and control panel for communication tower.
  • P.N & C.M of diesel gen.
  • Maintained office record for maintenance purpose.
  • Calibration and set parameter of different types of modules for D.G.
  • Worked as Electrical Engineer with E-Box system at U-phone Tower maintenance Project.

Asst Electrical engineer

Quality Builders Ltd
Karachi
12.2009 - 09.2012
  • Company Overview: Worked as Asst Electrical Engineer with Quality builders at KCIP 7 & PC Hotel carparking project.
  • To responsible the mobilization of main power.
  • Developed of shop drawing with help of IFC drawing.
  • Installation of cable tray and cable pulling.
  • Installation of LV, MV switch gear and termination.
  • Installation of RMU's transformers & VCB.
  • Testing and commissioning of all electrical equipment.
  • Installation of different types of lights.
  • Installation of streetlights and masts.
  • Worked as Asst Electrical Engineer with Quality builders at KCIP 7 & PC Hotel carparking project.

Electrical technician

SECO Engineering
Karachi
10.2007 - 09.2009
  • Company Overview: Worked as Electrical Technician with SECO Engineering at PSO rest house building project.
  • Installation of cable tray and cable laying.
  • Termination of all power and control cables.
  • Building wiring & Installation of Electrical equipment.
  • Worked as Electrical Technician with SECO Engineering at PSO rest house building project.

Education

B.Tech - ELECTRICAL

Indus University
karachi, pakistan
12.2012

Skills

  • Electrical equipment installation
  • Electrical operation & Maintenance
  • Transformer & Switch Gears
  • VFD Installation & Configuration
  • Different types of LED Light Modules
  • Configuration & Programming of Luminaire
  • CMS & LMS System
  • BMS System configuration & programming
  • Electrical power & Distribution system
  • Autocad

Timeline

Electrical engineer

RIVA Engineering (Gmbh)
12.2020 - Current

Electrical engineer

Saudi BinLadin group (SBG)
05.2017 - 12.2020

Electrical engineer

E-Box system
10.2012 - 02.2015

Asst Electrical engineer

Quality Builders Ltd
12.2009 - 09.2012

Electrical technician

SECO Engineering
10.2007 - 09.2009

B.Tech - ELECTRICAL

Indus University
HABIB NOOR NOOR