Summary


Thorough 19 years inspection experienced in monitoring processes to identify discrepancies and non-compliance. Proven success in producing and presenting high-quality inspection reports and making recommendations for improvement. Strong communication skills to handle clients with professionalism and tact.

Overview

22
22
years of professional experience
3
3
years of post-secondary education
1
1
Certification

Work History

QA/QC Instrumentation Inspector

Saudi Aramco with Applus Velosi (SAPID)
Dhahran , Saudi Arabia
12.2016 - 12.2024


  • Duration: March 2021 to December 2024

Projects:

  • Install VSD WI Pump and upgrade existing pumps at QATIF WIP-2, BI-11-21000-1523
  • Berri Development-Onshore Flowlines, Jubail- BI-10-09561-0002 and BI- 10-00622-0002.


Responsibilities:

  • Improved safety standards for all inspected facilities.
  • Increased efficiency by implementing standard operating procedures for inspections.
  • Collaborated with team members to complete large-scale inspection projects.
  • Provided detailed reports of findings, contributing to proper follow-up actions.
  • Maintained a high level of knowledge in construction codes, ensuring accurate inspections.
  • Managed multiple inspection assignments simultaneously, maintaining excellent organization skills.
  • Communicated well with personnel at multiple levels across various teams.
  • Fully responsible for all site activities at the assigned location.
  • Ensure that activities are on track to meet the target.
  • Coordinate with Site PMT and PMT procurement team to ensure that all required materials are available based on site required date.
  • Ensure that all design issues are resolved.
  • Coordinate proponent, POD as required.
  • Coordinate all testing and pre-commissioning activities.
  • Attained walkthrough and coordinate closure of punch items.
  • Submit daily progress report for assigned location.
  • Participate in regular progress meetings and site walkthroughs.
  • Provide weekly highlights.
  • Responsible for generating PMCC items and closed after verification.
  • Responsible for review contractor NCR and corrective action verification.
  • Responsible for material receiving inspection and Installation of, RTU marshalling cabinet, RTU system cabinet, HIPS logic solver cabinet, ESD cabinets, etc.
  • Responsible for Installation of all field instruments.
  • Responsible for reviewing the Test packages and Loop folder.
  • Responsible for loop check from field to DCS, SCADA.
  • Responsible for installation of OHPL pole and its accessories from substation to each drill site.
  • Responsible for installation, testing, energization procedure and package review for Switch gear, MCC, switch rack, Transformer, Cathodic protection, panel, etc.


QA/QC Instrumentation Inspector

Saudi Aramco with Applus Velosi (SAPID)
Khurais
08.2020 - 03.2021

Projects:

  • Khurais Restoration Project BI-24-5000-400 GOSP Train-4


Responsibility:

  • Ensured compliance with company standards through meticulous scrutiny of manufacturing processes.
  • Responsible for the proper implementation of Project Quality as per Saudi Aramco Engineering Standards, Applicable International Codes and Standards.
  • Responsible for attending inspection work activities as per Saudi Aramco Typical Inspection Plan applicable to the project BI’s, including Pre-commissioning activities.
  • Collaborated closely with colleagues to rectify identified faults and defects.
  • Conducted thorough inspections of incoming materials for improved supplier accountability.
  • Identified potential issues early through proactive system monitoring, preventing significant downtime.
  • Facilitated regular inspections for early detection of potential device failures.
  • Proactively updated professional knowledge base by attending relevant workshops and seminars.
  • Collaborated with engineering teams, improving overall project success.
  • Improved system efficiency through precise calibration of tools and equipment.
  • Supported installation, operation and maintenance of electronic systems.
  • Implemented safety protocols and performance controls for new electronic equipment.

QA/QC Instrumentation Inspector

Saudi Aramco with Applus VElosi (SAPID)
Khurais , KSA
04.2018 - 07.2020

Projects:

  • CPF BI-10-01056
  • Khurais GOSP Train-5
  • Khurais Gas Train 3
  • Khurais Crude Oil Storage Tank
  • SWRO


Responsibility:

  • Increased efficiency by implementing standard operating procedures for inspections.
  • Responsible for the proper implementation of Project Quality as per Saudi Aramco Engineering Standards, Applicable International Codes and Standards.
  • Responsible for attending inspection work activities as per Saudi Aramco Typical Inspection Plan applicable to the project BI’s, including Pre-commissioning activities.
  • Responsible in processing for the monthly Project Quality Index (PQI) for the assigned project BIs.
  • Responsible for the proper monitoring of on-going Saudi Aramco projects and making sure that the Contractors comply and implement as per the approved design drawings, Saudi Aramco Standards and International codes.
  • Responsible for reviewing the E-review the documents during design stage.
  • Improved safety standards for all inspected facilities.
  • Increased efficiency by implementing standard operating procedures for inspections.
  • Collaborated with team members to complete large-scale inspection projects.
  • Provided detailed reports of findings, contributing to proper follow-up actions.
  • Managed multiple inspection assignments simultaneously, maintaining excellent organization skills.
  • Communicated well with personnel at multiple levels across various teams.
  • Fully responsible for all site activities at the assigned location.
  • Ensure that activities are on track to meet the target.
  • Ensure that all design issues are resolved.
  • Coordinate proponent, POD as required.
  • Coordinate all testing and pre-commissioning activities.
  • Attained walkthrough and coordinate closure of punch items.
  • Submit daily progress report for assigned location.
  • Participate in regular progress meetings and site walkthroughs.
  • Provide weekly highlights.
  • Responsible for review contractor NCR and corrective action verification.
  • Responsible for material receiving inspection and Installation of, DCS, ESD, VMS, cabinets, etc.
  • Responsible for Installation of all field instruments.
  • Responsible for reviewing the Test packages and Loop folder.
  • Responsible for loop check from field to DCS.
  • Responsible for installation, testing, energization procedure and package review for Switch gear, MCC, switch rack, Transformer, Cathodic protection, panel, etc.




Instrumentation Third Party Inspector (TPI)

Applus velosi
Dhahran , Eastern Province
01.2017 - 03.2018

Vendor Assigned:

Ø Honey Well (DCS C 300) – (Saipem) ARAMCO

Dhahran.

Ø Alfanar Cables–Saudi Electricity Company, Riyadh,

Ø Jeddah Cable Company –Jeddah, KSA (FO Cables)

Ø Middle East Fiber Manufacturing Co. –Riyadh, KSA

Ø Corrosion Technology Services-, Dammam, KSA

Industrial City, Jubail, KSA

Ø Alfanar Transformer Riyadh, KSA

Ø Saudi Electrical Transformers Factory, (SETF) Jeddah.

Eaton-Cooper Dammam

QA/QC E&I

M/s ADGAS/ QCON ENGINEERING & CONSTRUCTION CO.LLC
ABUDHABI , UAE
03.2016 - 04.2016

Project:

ADGAS TRAIN-2 T/A 2016 DAS ISLAND.


Responsibility:

  • Involved in performing inspection and testing to different types of Control valve overhauling and bench calibration.
  • Responsible for Material inspection.
  • Ensured compliance with industry standards for enhanced project outcomes.
  • Updated relevant documentation, checking for accuracy and relevance.
  • Prioritized conflicting requirements, meeting tight deadlines and keeping projects on-task.

Senior QA/QC Instrumentation Engineer

M/s JTC Corporation/ HYUNDAI ENGG & CONSTRUCTION CO.LTD
Jurong , Singapore
11.2013 - 08.2014

Project:

  • Jurong Rock Cavern Project.


Responsibility:

  • Developed technical reports to communicate findings and recommendations.
  • Troubleshot and resolved issues promptly to minimize downtime.
  • Provided training for staff on new technologies leading to improved operational efficiency.
  • Conducted detailed risk assessments prior installation of new equipment ensuring utmost safety standards were met.
  • Developed standard operating procedures for various processes, enhancing organizational consistency.
  • Adhered strictly to health and safety guidelines during all phases of project execution.
  • Performed root cause analysis on failed components identifying solutions that prevented recurrence.
  • Selected electrical testing methods and created explained test procedures.
  • Responsible for installation for field instruments, field junction box, cable installation, cable testing, Marshalling cabinet, system cabinet, ESD, VMS, PLC, DCS etc.
  • Responsible for instrument loop folder preparation and conducting to loop check from field to control room.
  • Responsible for package preparation of energization of Electrical equipment's, panel, transformers, switchgear, MCC, etc.
  • Responsible for installation and testing of Electrical equipment's, panel, transformers, switchgear, MCC, etc.
  • Responsible for installation and testing of grounding rod, main Grid cable etc.
  • Attended weekly meetings with clients and subcontractor.
  • Responsible for closing all punch items before handover the projects.



QA/QC Instrumentation Inspector

M/s SAMREF /WORLEY PARSON
Yanbu , KSA
01.2013 - 06.2013

Project:

  • SAMREF Clean Fuel Project (ARAMCO)


Responsibility:

  • Carry out inspection of construction activities associated with Instrumentation, fire & gas and telecom.
  • Responsible for the proper monitoring of on-going projects and making sure that the Sub-Contractors comply and implement as per the approved design drawings, Saudi Aramco Standards and International codes.
  • Inspection of laying, glanding and termination of signal & control cables.
  • Witnessing IR (Megger) and continuity test of power & control cables.
  • Responsible for complete inspection of Installation, calibration of all Transmitter (PT, FT, LT, TT) all sensor, Control valve, JB installation, Instrument cable installation & Insulation test.
  • Reviewing the Loop folder and involve in loop checking activities.
  • Involve in 1st& 2nd stage walk down
  • Coordinating with the contractor & vendor for the work
  • Coordinating with clients for the final acceptance of the plant hand over.



Electrical and Instrumentation Engineer

M/s Saudi Aramco with SRB
Dhahran , KSA
04.2011 - 01.2013

Projects:

  • RTDB-2 & DR-2 Pipeline Project (ARAMCO)


Responsibility:

  • Assigned to perform all Electrical and instrument activities carried out while erecting /constructing.
  • Ensured adherence to quality standards in all aspects of project implementation.
  • Participated in regular progress meetings, providing updates on instrumentation status and tasks.
  • Active involvement with installation of instruments like transmitter, gas detector, control valve, MOV valve, junction box, RTU Marshalling and systems cabinet, etc as per approved drawings.
  • Prepare Instrument Loop folder, Method of statement, leak test procedure, cable installation and testing procedure, energization procedure, etc.
  • Perform the Testing and Pre-commissioning of and MV/LV Switchgears and MCC’S, switch rack, Transformers, etc.
  • Perform testing & Pre-Commissioning of Motor Controlling Centre (MCC’s) which includes MCCB (instantaneous or thermal) trip testing, Insulation resistance testing, shunt trip testing, contact resistance testing, overload relay testing, ground fault relay testing.
  • Material Receiving Inspection of Power Transformer by collecting all the necessary documents and make surveillance report for any defects.
  • Installation of 115/13.8kV, 13.8kV Power Transformers as per approved Drawings and make As-Build if any deviation to the installation.
  • Perform the Testing & Pre-com of Power & Distribution Transformer.
  • The testing includes Winding Resistance, transformer turns Ratio, vector group, tan delta, Power factor dissipation test, Oil testing, Winding Temperature, Insulation Resistance Test of the Transformers
  • CT PT testing includes insulation resistance, voltage ratio, burden test and primary and secondary current injection tests
  • MV/LV Motors:
  • Perform Material Receiving Inspection of Motors as per necessary documents
  • Perform installation inspection of Motors as per approved drawings
  • Perform the testing of Motors as winding resistance test, insulation resistance test, phase rotation test, earth impedance test of motor earthling, No-Load & Load and Solo Run Test of Motors.
  • UPS System:
  • Active involvement with installation of UPS, Battery Chargers, Storage Batteries etc. is in accordance with project specification and approved drawings.
  • Raising RFI’s for the installation of UPS, Battery Chargers, Storage Batteries etc. is in accordance with project specification and approved drawings.
  • Managed procurement process for all required instrumentation equipment effectively.
  • Implemented preventive measures against potential system failures through proactive monitoring.
  • Improved project safety by designing and implementing comprehensive fail-safe systems.
  • Developed advanced instrumentation strategies for successful project execution.
  • Collaborated closely with suppliers, engineers, and contractors, achieving timely project completion.

QA/QC Instrumentation Inspector

CCC
Rashlafan , QATAR
06.2008 - 08.2010

Project:

  • Pearl GTL Project Qatar.


Responsibility:

  • · To ensure all electrical and instrumentation inspection activities are performed according to approved procedures, codes, and standards.
  • Inspection for the cable trenches prior to cable pulling and after cable pulling to release for the next activities.
  • Inspection of installation & material uses for all type of the cable tray & conduit, before and after cable pulling as per project standard typical drawing.
  • Inspection of installation of instrument & electrical cables, underground and above ground.
  • Inspection and Witness of Insulation Resistance test and continuity test for instrument & power cable, on drum, after lying, after backfilling and after termination.
  • Inspection for the installation of grounding cable and bus bar in the field, buildings and connection to the instrument & equipment as per approved drawing and specification.
  • Inspection and witness of installation of ground rod, pit and ground test.
  • Inspection of the installation of all supports for instrument, tray, process tubing and air tubing as per project standard drawing.
  • Inspection for the installation of Marshalling cabinets, DCS cabinets, PLC cabinets, Networking cabinets, Fiber optics patch panel in satellite and instrument house as per applicable specification and manufacturer recommendations prior to and after installation.
  • Inspection for installation of instrument junction box, local panel, all types of transmitters, switches, gauges, control valve, motor orated valve, solenoid valve, temperature element, orifice plate, vibration probe, analyzers shelters and equipment, fire & gas detectors, button, horn & beacon as per applicable specification and manufacturer recommendations prior to and after installation.
  • Inspection of all cable termination in junction boxes, all cabinets and instruments as per termination detail drawing.
  • Inspect all instruments to ensure that they are installed in correct assembled, location and area classification.

Sr. Instrument Technician

Jubail United Petrochemical, with Z.M Al Madni
Jubail , KSA
05.2003 - 02.2008

Project:

Jubail United Petrochemical Plant (SABIC)


Responsibility:

  • To ensure all electrical and instrumentation inspection activities are performed according to approved procedures, codes, and standards.
  • Inspection for the cable trenches prior to cable pulling and after cable pulling to release for the next activities.
  • Inspection of installation & material uses for all type of the cable tray & conduit, before and after cable pulling as per project standard typical drawing.
  • Inspection of installation of instrument & electrical cables, underground and above ground.
  • Inspection and Witness of Insulation Resistance test and continuity test for instrument & power cable, on drum, after lying, after backfilling and after termination.
  • Inspection for the installation of grounding cable and bus bar in the field, buildings and connection to the instrument & equipment as per approved drawing and specification.
  • Inspection and witness of installation of ground rod, pit and ground test.
  • Inspection of the installation of all supports for instrument, tray, process tubing and air tubing as per project standard drawing.
  • Inspection for the installation of Marshalling cabinets, DCS cabinets, PLC cabinets, Networking cabinets, Fiber optics patch panel in satellite and instrument house as per applicable specification and manufacturer recommendations prior to and after installation.
  • Inspection of all cable termination in junction boxes, all cabinets and instruments as per termination detail drawing.
  • Inspect all instruments to ensure that they are installed in correct assembled, location and area classification.
  • Inspection and witness of all types of instrument & valve calibration as per specification (Bench calibration and field Calibration).
  • To prepare the daily surveillance reports, signing of all completed records.
  • To attend meetings and report to QC Supervisor.

Education

Diploma in Instrumentation & Control Engineering - Instrumentation & Control Engineering

PVP Polytechnic
Bangalore, Karnataka
06.1997 - 04.2000

Skills

  • Knowledge of industrial standards
  • Surveillance monitoring
  • Audit planning and delivery
  • Quality assessment
  • Instrument calibration
  • Knowledge of DCS systems
  • PLC & SCADA systems
  • Field instrumentation expertise
  • Control loop check
  • Quality assurance oversight
  • Project leadership

Certification

  • Practical Leadership and Supervision Skill, SHELL and Qatar Petroleum, Raslaffan, Qatar
  • Integrated Management System Internal Auditor Training, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018
  • Environmental Management & Sustainability, ISO 14001:2015

Languages

English
Hindi
Urdu

Custom

  • +966, 597029453
  • +91, 8507609845, WhatsApp

Personal Information

  • Passport Number: V6093350
  • Passport Expiry Date: 04/17/31
  • Date of birth: 05/27/79
  • Nationality: Indian

Timeline

QA/QC Instrumentation Inspector

Saudi Aramco with Applus Velosi (SAPID)
08.2020 - 03.2021

QA/QC Instrumentation Inspector

Saudi Aramco with Applus VElosi (SAPID)
04.2018 - 07.2020

Instrumentation Third Party Inspector (TPI)

Applus velosi
01.2017 - 03.2018

QA/QC Instrumentation Inspector

Saudi Aramco with Applus Velosi (SAPID)
12.2016 - 12.2024

QA/QC E&I

M/s ADGAS/ QCON ENGINEERING & CONSTRUCTION CO.LLC
03.2016 - 04.2016

Senior QA/QC Instrumentation Engineer

M/s JTC Corporation/ HYUNDAI ENGG & CONSTRUCTION CO.LTD
11.2013 - 08.2014

QA/QC Instrumentation Inspector

M/s SAMREF /WORLEY PARSON
01.2013 - 06.2013

Electrical and Instrumentation Engineer

M/s Saudi Aramco with SRB
04.2011 - 01.2013

QA/QC Instrumentation Inspector

CCC
06.2008 - 08.2010

Sr. Instrument Technician

Jubail United Petrochemical, with Z.M Al Madni
05.2003 - 02.2008

Diploma in Instrumentation & Control Engineering - Instrumentation & Control Engineering

PVP Polytechnic
06.1997 - 04.2000
  • Practical Leadership and Supervision Skill, SHELL and Qatar Petroleum, Raslaffan, Qatar
  • Integrated Management System Internal Auditor Training, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018
  • Environmental Management & Sustainability, ISO 14001:2015